HOLLAND AC BK 2 LT 3 - ZCP 12/15/2014Kodiak Island Borough Print For Submit by Email
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9363 Fax (907) 486 - 9396 21178
http://www.kodiakak.us
Zoning Compliance Permit Permit No. BZ2015 -063
Subd Case No. S67 -172B Plat No. 67 -10 Bldg Permit No. TBD
The following information is to be supplied by the Applicant:
Property Owner / Applicant:
Kodiak Bible Chapel of Kodiak
Mailing Address:
P.O. Box 1245, Kodiak, AK 99615
Phone Number:
(907) 486 -5219
Other Contact email, etc.:
Legal Description:
Subdv: Holland Acres Block: 2 Lot: 1 -3
Street Address:
416 Island Lake Road, Kodiak, AK 99615
Use & Size of Existing Structures:
Church
Description of Proposed Action:
Replacement of doors at northwest and southeast portions of existing church.
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review:
Current Zoning: R2 KIBC 17.80 PROP_ID 21178
Lot Area: 1.14 acres
Lot Width: 60' Bld'g Height: 35'
Front Yard: 25 '
Rear Yard: 101 Side Yard: 5 ' / street side 10'
Prk'g Plan Rvw? Not Applicable
# of Req'd Spaces: 175
Staff Compliance Review Notes:
Plat /Subdivision Requirements?
Subd Case No. S67 -172B Plat No. 67 -10 Bldg Permit No. TBD
Does the project involve
an EPA defined facility?
Driveway N/A
Permit?
Septic Plan N/A
Approval:
Fire N/A
Marshall:
NO If YES, do you have an EPA Return Receipt of NO
Notification?
"Permit will not be issued until receipt is submitted to
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Not Applicable List Other:
Date: Dec 15, 2014
Signature: Edward Mahoney
This permit is only for the proposed project as described by the appyo6nt. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification —�
Date: Dec 15, 2014 CDD Staff: Jack Maker
Payment Verification Zoning Compliance Permit Fee Paya lin Cashier's Oye Room # 104 - Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable
F
$0.00 F-
$0.00
Less than 1.75 acres:
FX-
$30.00 F-
$60.00
1.76 to 5.00 acres:
j-
$60.00 F-
$120.00
5.01 to 40.00 acres:
r
$90.00 j-
$180.00
40.01 acres or more:
F-
$120.00 r
$240.00
DEC 15 2014
KODIAK ISLAND BOROUGH
FINANCE DEPARTMENT