EAST ADD BK 32 LT 11 - ZCP 10/31/2014Kodiak Island Borough Print For Submit by Email
t Community Development Department
'4 710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9363 Fax (907) 486 - 9396 14 915
http://www.kodiakak.us
Zoning Compliance Permit Permit No. CZ2015 -034
The following information is to be supplied by the Applicant:
Property Owner / Applicant: John and Sharron Reft
Mailing Address: P.O. Box 1564, Kodiak, AK 99615
Phone Number:
Other Contact email, etc.:
Legal Description:
(907) 942 -7054
Subdv: East Addition
Street Address: 1020 East Rezanof Drive, Kodiak, AK 99615
Use & Size of Existing Structures: Single- family residence
Block: 32 Lot: 11
Description of Proposed Action: Replacement of existing stairs at front of SFR as depicted in attached site plan (no change to
building footprint).
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review:
Lot Area: 5,000 sq. ft.
Front Yard: 25 '
Prk'g Plan Rvw? Not Applicable
Staff Compliance Review Notes:
Plat/ Subdivision Requirements?
change footprint.
Current Zoning: R2
Lot Width:
60'
Rear Yard: 10'
# of Req'd Spaces:
KIBC 17.80
PROP—ID 14915
Bld'g Height: 35'
Side Yard: 51
Preexisting non conforming lot and structure. Repair /replacement of existing stair will not
Subd Case No. N/A Plat No. 52 -04 Bld'g Permit No. TBD
Does the project involve NO If YES, do you have an EPA Return Receipt of N/A
an EPA defined facility? Notification?
"Permit will not be issued until receipt is submitted to
Driveway N/A
Permit?
Septic Plan N/A
Approval:
Fire N/A
Marshall:
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan List Other: N/A
Date: Oct 31, 2014 Signature: John Reft (see attached draft application for signature)
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Oct 31, 2014 CDD Staff. Jack Maker
Payment Verification Zoning Compliance Permit Fee Payal in Cashier's Office Room # 104 - Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable r $0.00 r $0.00
Less than 1.75 acres: r $30.00 F- $60.00
1.76 to 5.00 acres: j— $60.00 (— $120.00
5.01 to 40.00 acres: r $90.00 r $180.00
40.01 acres or more: r $120.00 - F- $240.00
OCT a 1, 2014
KODIAK ISLAND BORUU H
FINANCE DEPARTMENT
PAYMENT DATE
10/31/2014
COLLECTION STATION
CASHIER
RECEIVED FROM
JOHN AND SHARON REFT
DESCRIPTION
1020 E REZANOF DR
Kodiak Island Borough
710 Mill Bay Rd.
Kodiak, AK 99615
PAYMENT •D • i
Zoning Compl Zoning Compliance Permit
[ICZ 2015 034
Payments: Type Detail Amount
Cash $30.00
Total Amount:
BATCH NO.
2015- 00000273
RECEIPT NO.
2015- 00000628
CASHIER
Teresa Medina
$30.00
30.00
Printed by: Teresa Medina Page 1 of 1 10/31/2014 10:43:26 AM
°�. Kodiak Island Borough
ruFRorfn- , 1 xS btrait by �Trleil�
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9363 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit Permit No.
The following information is to be supplied by the Applicant:
Property Owner / Applicant:
Mailing Address: �� QdX i zi
Phone Number: /
Other Contact email, etc.:
Legal Description: Subdv: F
S-- A Cpl TIOAJ Block: �Q- Lot: ) I
Street Address: b �� N 0 Qc L)
Use & Size of Existing Structures: 'TY0 Q - SI f-V
Description of Proposed Action: U- M M Ek) I OF S I AILS AT if 6D Q i [) IF
RLS ipF -A)CE , Nu lL)cY, - Du f00( PP-Vi-F,
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning: PROP ID
Lot Area:
Front Yard:
Prk'g Plan Rvw?
Staff Compliance Review Notes:
Plat/ Subdivision Requirements?
Lot Width:
Rear Yard:
# of Req'd Spaces:
Bld'g Height:
Side Yard:
Subd Case No. Plat No. Bld'g Permit No.
Does the project involve
an EPA defined facility?
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
If YES, do you have an EPA Return Receipt of
Notification?
"Permit will not be issued until receipt is submitted to
Applicant Certification: 1 hereby certify that will comply with the provisions of the Kodiak Island Borough Code and that
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? List Other:
Date: Signature: —S
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT 1S REQUIRED.
** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 URC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: CDD Staff.
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable
F
$0.00
r
$0.00
Less than 1.75 acres:
r
$30.00
(—,
$60.00
1.76 to 5.00 acres:
r
$60.00
r
$120.00
5.01 to 40.00 acres:
r.
$90.00
(—
$180.00
40.01 acres or more:
j—
$120.00
j-
$240.00
517 PUN TOP-
GZaolS -bay
�
� �� � #
:�t�!/
« �.�
`� �
.�
2�
� ' , � .: �
, � �
� /�a
��� �
,f� ��� \,