FY2015-12 Ratifying and Certifying the October 7, 2014 Municipal Election 1 Introduced by: Borough Assembly
2 Requested by: Borough Assembly
3 Drafted by: Borough Clerk
4 Introduced on: 1 011 6/201 4
5 Adopted on: 1 011 6/2 01 4
6
7 KODIAK ISLAND BOROUGH
8 RESOLUTION NO. FY2015-12
9
10 A RESOLUTION OF THE ASSEMBLY OF THE KODIAK ISLAND
11 BOROUGH RATIFYING AND CERTIFYING THE RESULTS OF THE
12 MUNICIPAL ELECTION HELD ON OCTOBER 7, 2014
13
14 WHEREAS, the Kodiak Island Borough held a Regular Election on October 7, 2014, at
15 which time candidates for the following offices were voted on:
16 Borough Assembly Three Seats, Three Year Terms
17 School Board Two Seats, Three Year Terms
18 Bay View Road Service Area Board One Seat, Three Year Term
19 Fire Protection Area No. 1 Board Two Seats, Three Year Terms
20 Monashka Bay Road Service Area Board One Seat, Three Year Term
21 Service Area No. 1 Board Three Seats, Three Year Terms
22 Womens Bay Service Area Board Three Seats, Three Year Terms
23
24 WHEREAS, the proposition below was submitted to the qualified voters in the Kodiak
25 Island Borough:
26 Proposition No. 1
27
28 Shall the Kodiak Island Borough incur debt and issue general obligation bonds in an amount not
29 to exceed Ten Million Two Hundred Thirty thousand Dollars ($10,230,000) for the purpose of
30 paying the cost of school facilities renewal and replacement projects which are 70%
31 reimbursable by the State of Alaska, that address worn out building components such as roofs,
32 floors, underground storage tanks, etc. that have reached the end of their useful life, including
33 without limitation the projects described below and other related projects?
34
35 PROJECT NAME COST
36 Kodiak Middle School Underground Storage Tank Replacement $ 150,000
37 East Elementary School Flooring Replacement 649,000
38 Peterson Elementary School Flooring Replacement 363,500
39 Port Lions School Underground Storage Tank Replacement 200,000
40 Main Elementary School Underground Storage Tank Replacement 150,000
41 Kodiak Middle School New Elevator Controls 54,000
42 Kodiak Middle School New HVAC (Heating) Controls 1,576,200
� 43 Peterson Elementary School New HVAC (Heating) Controls 694,900
44 Kodiak Middle School Rear Parking Lot Paving 675,800
45 East Elementary School Cafeteria Roof Replacement 1,248,500
46 Ouzinkie School Old Wing Flooring Replacement 160,300
47 Ouzinkie School New Wing Flooring Replacement 41,000
48 Akhiok School Flooring Replacement 95,500
49 Kodiak Middle School Fire Alarm Replacement 405,000
50 East Elementary School Partial Interior Renovation 687,200
51 Peterson Elementary School Parking Lot Paving 972,000
Kodiak Island Borough, Alaska Resolution No. FY2015-12
Page 1 of 4
mouiW fIY
52 Kodiak Middle School Bus Ramp Roof Replacement 118,800
53 Peterson Elementary School Replacement of Boilers 324,600
54 Main Elementary School Gym Floor Replacement 450,000
55 Karluk School Flooring Replacement 86,700
56 Chiniak School Playground Equipment Replacement 101,200
57 Karluk School Playground Equipment Replacement 101,200
58 Akhiok School Playground Equipment Replacement 101,200
59 East Elementary School Replacement of Plumbing Fixtures 256,500
60 Old Harbor School Playground Equipment Replacement 121,500 �����
61 Ouzinkie School Playground Equipment Replacement 121,500o�,,
62 Port Lions School Playground Equipment Replacement 121,500
63 Old Harbor School Underground Storage Tank Replacement 202,400
64 Project Totals $ 10,230,000
65 70% State Reimbursement 7,161,000
66 30% Local Contribution $ 3,069,000
67 O Yes
68 O No
69
70 The projects are expected to qualify for not less than 70% State debt service reimbursement,
71 funding for which is subject to annual appropriation. The projects will be scheduled as such to
72 limit disruption to the education of students, and bonds will be sold only as needed to pay project
73 costs. If the State fully funds the debt service reimbursement program, the average annual debt
74 service payable by the Borough after State reimbursement, is estimated to be $353,569. This
75 amount of debt service may require an additional annual property tax levy of $84 per $250,000
76 of assessed value, or its equivalent. This example of a property tax levy is provided for
77 illustrative purposes only. The bonds shall be secured by a pledge of the full faith and credit of j
78 the Borough (Ordinance No. FY2015-02). "
79
80 WHEREAS, the Canvass Board of the Kodiak Island Borough met on October 14 and 15,
81 2014 and tallied the votes as follows:
82
83 BOROUGH ASSEMBLY--THREE SEATS, THREE YEAR TERMS
TuckBonney .............................................................................. 687
DavidKaplan .........................................................I.................... 514
LarryLeDoux ..............................................................................
DanRohrer ................................................I............................. 1323
BrendaSchwantes .............................................................................. 247
RebeccaSkinner .............................................................................. 795
JaschaZbitnoff .............................................................................. 272
84
85 SCHOOL BOARD -TWO SEATS, THREE YEAR TERMS
DuncanFields .............................................................................. 1268
KatieOliver .............................................................................. 1319
JeffStewart .......................................................................I...... 552
86
87 BAY VIEW ROAD SERVICE AREA BOARD—ONE SEAT, THREE YEAR TERM J
ReedOswalt (write-in) ......................................................................... '
88
Kodiak Island Borough, Alaska Resolution No. FY2015-12 ,
Page 2 of 4
89 FIRE PROTECTION AREA NO. 1 BOARD -TWO SEATS, THREE YEAR TERMS
ScottArndt ....................................................,.A..,,,.,..... 495
Richard Carstens .............................................................................. 567
90 —
91 MONASHKA BAY ROAD SERVICE AREA BOARD–ONE SEAT, THREE YEAR TERM
AndyDano (write-in) .............................................................................. 12
92
93 SERVICE AREA NO. 1 BOARD -THREE SEATS, THREE YEAR TERMS
ScottArndt .........................................., ............................... 407
Mike Sirofchucfc
William "Bill" Mann
(write-in) ............................................... ... ........... 5
94
95 WOMENS BAY SERVICE AREA BOARD -THREE SEATS, THREE YEAR TERMS
DaveHeuman ,....................................................................I........ 156
JohnIsadore ...............................................11,,11, ,,...................... 145
George Lee ..................................... ............... 152
........................
96 —
97 PROPOSITION NO. 1 –GENERAL OBLIGATION BONDS
Yes ,,.,,,,.w,,,.................I.................... 1216
No .................................................... _d.r.... 630
98
99 PERCENTAGES
Precinct Total Re istered Voters Votes Cast Percentage
321800-Chiniak 135 36 27%
321810-Flats 1711 186 11%
321815-KI South (Larsen Bay) 198 37 19%
321820-Kodiak No. 1 1741 350 20%
321825-Kodiak No. 2 1702 272 16%
321830-Mission Road 3148 709 23%
321835-Old Harbor 133 30 23%
321840-Ouzinkie 134 45 34%
321845-Port Lions 198 34 17%
Absentee, Questioned, and
Personal Representative 9100 269 3%
TOTALS 9100 1968 22%
Voter turn-out October 2013— 17%
Voter tum-out October 2092— 13%
100
101
102
103
104
105
106
Kodiak Island Borough Resolution No. FY2015-12
Page 3 of 4
107 NOW, THEREFORE, BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND
108 BOROUGH THAT the Assembly finds that the Municipal Election of October 7, 2014, was
109 validly held and hereby ratifies and certifies the results of the election:
110
111 Section 4: In the Borough-wide election for Assembly, Dan Rohrer, Larry LeDoux, and '"""""°�
112 Rebecca Skinner were elected to three year terms each.
113
114 Section 2: In the Borough-wide election for Borough School Board, Katie Oliver and
115 Duncan Fields were elected to three year terms each.
116
117 Section 3: In the Bay View Road Service Area, Reed Oswalt, a write-in candidate, was
118 elected to a three year term.
119
120 Section 4: In the Fire Protection Area No. 1, Scott Arndt and Richard Carstens were
121 elected to three year terms each.
122
123 Section 5: In the Monashka Bay Road Service Area, Andy Dano, a write-in candidate,
124 was elected to a three year term.
125
126 Section 6: In the Service Area No. 1, Scott Arndt and Mike Sirofchuck were elected to
127 three year terms each. The third seat will be filled by William "Bill" Mann, a
128 write-in candidate, for a three year term.
129
130 Section 7: In the Womens Bay Service Area Board, Dave Heuman, John Isadore, and
131 George Lee were elected to three year terms each.
132 °
133 Section 8: In the Borough-wide election for Proposition No. 1, the proposition aQ ssed.
134
135 NOW, THEREFORE, BE IT FURTHER RESOLVED BY THE ASSEMBLY OF THE
136 KODIAK ISLAND BOROUGH THAT the election was validly held and that the clerk is
137 directed to deliver to each person elected to office a certificate of election.
138
139 ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH
140 THIS SIXTEENTH DAY OF OCTOBER, 2014
141
142 KODIAK iS IUD DOUGH
143
144
145
146 ATTEST: AdFrten ;orough Mayor
147
148
149
150 Nova M. Javier, MM Borough Clerk
r
Kodiak Island Borough �
Resolution No. FY2015-12
Page 4 of 4