EAST ADD BK 55 LT 5 - ZCP 9/12/2014Kodiak Island Borough Print Form Submit byEmail
Community Development Department I I III II I II I III I III
710 Mill Bay Rd. Rm 205
o Kodiak AK 99615
Ph. (907)486- 9363. Fax (907)486 -9396 15161
http://www.kodiakak.us
Zoning Compliance Permit Permit No. CZ2015 -021
The following information is to be supplied by the Applicant:
Property Owner /Applicant: SHANE WANDERSEE
Mailing Address: PO BOX 8516, KODIAK, AK 99615.
Phone Number:
Other Contact email, etc.:
Legal Description: Subdv: EASTADD Block: 55 Lot: 5
Street Address: 1810 REZANOF DR
Use & Size of Existing Structures: VACANT
Description of Proposed Action: PRE- DEVELOPMENT FILL
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Statt Compliance Review:
Lot Area: 6,400
Front Yard: 25 '
Prk'g Plan Rvw? No
Staff Compliance Review Notes:
Plat/ Subdivision Requirements?
Current Zoning: R1
Lot Width: 60'
Rear Yard: 10'
# of Req'd Spaces:
KIBC 17.75
PROP—ID 15161
Bldg Height: 35'
Side Yard: 10'
Subd Case No. Plat No. Bld'g Permit No.
Does the project involve
an EPA defined facility?
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
If YES, do you have an EPA Return Receipt of
Notification?
"Permit will not be issued until receipt is submitted to
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
List Other:
Date: Sep 12, 2014 Signature: SHANE WANDERSEE'VL'
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 780 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
COD Staff Certification
Date: Sep 12, 2014 CDD Staff: Martin
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable
r
$0.00
r
$0.00
Less than 1.75 acres:
r'
$30.00
\1 r
$60.00
1.76 to 5.00 acres:
r
$60.00
r
$120.00
5.01 to 40.00 acres:
r
$90.00
r
$180.00
40.01 acres or more:
j—
$120.00
PAID r
$240.00
SEP 12 2014
KODIAK ISLAND BOROUGH
FINANCE DEPARTMENT
o
_
—
—
i
I
_—
X ,
_ICI_
s
T
N
f
T
X