Loading...
EAST ADD BK 55 LT 5 - ZCP 9/12/2014Kodiak Island Borough Print Form Submit byEmail Community Development Department I I III II I II I III I III 710 Mill Bay Rd. Rm 205 o Kodiak AK 99615 Ph. (907)486- 9363. Fax (907)486 -9396 15161 http://www.kodiakak.us Zoning Compliance Permit Permit No. CZ2015 -021 The following information is to be supplied by the Applicant: Property Owner /Applicant: SHANE WANDERSEE Mailing Address: PO BOX 8516, KODIAK, AK 99615. Phone Number: Other Contact email, etc.: Legal Description: Subdv: EASTADD Block: 55 Lot: 5 Street Address: 1810 REZANOF DR Use & Size of Existing Structures: VACANT Description of Proposed Action: PRE- DEVELOPMENT FILL Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Statt Compliance Review: Lot Area: 6,400 Front Yard: 25 ' Prk'g Plan Rvw? No Staff Compliance Review Notes: Plat/ Subdivision Requirements? Current Zoning: R1 Lot Width: 60' Rear Yard: 10' # of Req'd Spaces: KIBC 17.75 PROP—ID 15161 Bldg Height: 35' Side Yard: 10' Subd Case No. Plat No. Bld'g Permit No. Does the project involve an EPA defined facility? Driveway Permit? Septic Plan Approval: Fire Marshall: If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Sep 12, 2014 Signature: SHANE WANDERSEE'VL' This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 780 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** COD Staff Certification Date: Sep 12, 2014 CDD Staff: Martin Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building After - the -Fact 2X the published amount Not Applicable r $0.00 r $0.00 Less than 1.75 acres: r' $30.00 \1 r $60.00 1.76 to 5.00 acres: r $60.00 r $120.00 5.01 to 40.00 acres: r $90.00 r $180.00 40.01 acres or more: j— $120.00 PAID r $240.00 SEP 12 2014 KODIAK ISLAND BOROUGH FINANCE DEPARTMENT o _ — — i I _— X , _ICI_ s T N f T X