Loading...
NEW KODIAK BK 14 LT 8 - ZCP 8/18/2014Kodiak Island Borough Print Form Submit by Email Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9363 Fax (907) 486 - 9396 15557 http://www.kodiakak.us Zoning Compliance Permit Permit No. CZaac� -o)y The following information is to be supplied by the Applicant: Property Owner / Applicant: Mary Caulfield / David Putnam (Housewright Construction) Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: 65174 High Ridge Drive, Bend, OR 97701 Owner: (541) 788 -4844 / Agent: (907) 539 -2444 caulfield @bendtel.net Subdv: New Kodiak Block: 14 Lot: 8 Street Address: 204 East Rezanof Drive, Kodiak, AK 99615 Use & Size of Existing Structures: Professional Office Description of Proposed Action: Roof replacement, no change to footprint. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Business KIBC 17.90 PROP-11D 15557 Lot Area: .29 acres Front Yard: Not Applicable Prk'g Plan Rvw? Not Applicable Staff Compliance Review Notes: Plat/ Subdivision Requirements? Lot Width: Not Applicable Bld'g Height: 50' Rear Yard: Not Applicable Side Yard: Not Applicable # of Req'd Spaces: 16 Subd Case No. S68 -210A Plat No. 72 -02 Bldg Permit No. TBD Does the project involve an EPA defined facility? Driveway N/A Permit? Septic Plan N/A Approval: Fire N/A Marshall: NO If YES, do you have an EPA Return Receipt of N/A Notification? "Permit will not be issued until receipt is submitted to Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Not Applicable Date: Aug 18, 2014 List Other: Contract, email authorizing David Putman as agent Signature: Ag nt. David Putna useh onstructi`onJ This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: Aug 18, 2014 CDD Staff: ack Maker Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After - the -Fact 2X the published amount Not Applicable F $0.00 F $0.00 Less than 1.75 acres: r $30.00 F- $60.00 1.76 to 5.00 acres: F- $60.00 F- $120.00 5.01 to 40.00 acres: F- $90.00 [— $180.00 40.01 acres or more: j— $120.00 ® r $240.00 AUG 18 2014 KODIAK ISLAND BOROUGH FINANCE DEPARTMENT 07/14/2004 06:10 541 - 382 -7448 WILLIAM WY DDS rAbL 01 XIoFase�v�igi>� Construction DUALITY NEVER COMPROMISED 907-09-2444 - DmAd Putnam a Litr, Bo &d, lnoa d 204 East Rezanof Roof & Gutter bid Bill Guy Housewrigbt Construdig!n_Lte—opsibi)3ties: • Remove existing shingles and gutters and pay related disposal fees. • Supply all necessary building and zoning permits. • Install new perimeter and plumbing flashings. • All valley and head wall areas will have bitcheuthane membrane installed under the underlayment. • Install 30 year Highlander rubber modified architectural shingles. • Install dupont /grip rite synthetic underlayment • Tab all shingles down using A.P.O.0 rubberized tab cement. • Supply all materials. • Install new high gloss white seamless aluminum. gutters and down spout. • All gutter material will be .027. Owner reAponsibI 'es: Supply access and parking during time of construction. Supply adequate electrical power supply to exterior of structure_ Pay 50% upfront and remaining 50% is due upon completion. Rot repair will be billed separately based on time and materials used. Materials will be billed at contractors discounted rate and labor is to be billed a $60 per Haan - hour!' 07/14/2004 06:10 541- 382 -7448 WILLIAM GUY DDS PAGE 02 2of2 Total cost labor and material- $33,036.06 This contract is in its entirety nothing more or less should be expected. Housewright Construction S — 3— )q Date — /-IN Jack Maker From: Colleen Caulfield < caulfield @bendtel.net> Sent: Monday, August 18, 2014 9:36 AM To: Jack Maker Subject: 204 rzanof I give permission for david putman of Housewright construction to complete a rerooffing of my property at 204 e rezanof, kodiak ak colleen caulfield