Loading...
USS 3474 LT 3 CHINIAK - ZCP 8/15/2014Kodiak Island Borough Print Form Submit by Email Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 111111111111111111 IN Ph. (907) 486 - 9363 Fax (907) 486 - 9396 18303 http://www.kodiakak.us Zoning Compliance Permit Permit No. BZ2015 -026 The following information is to be supplied by the Applicant: Property Owner / Applicant: HESTER, VICKI Mailing Address: PO BOX 5522, CHINIAK, AK 99615 Phone Number: Other Contact email, etc.: Legal Description: Subdv: USS 3474 CHINIAK Block: Lot: 3 Street Address: 43178 CHINIAK HWY Use & Size of Existing Structures: SFR Description of Proposed Action: YARD FILL FROM AKDOT Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: 2.61 AC Front Yard: 25 ' Prk'g Plan Rvw? No Staff Compliance Review Notes: Plat / Subdivision Requirements? Current Zoning: Conservation KIBC 17.50 Lot Width: 120' Rear Yard: 25' # of Req'd Spaces: 3 PROP_ID 18303 Bld'g Height: 35' Side Yard: 25 ' Subd Case No. Plat No. Bld'g Permit No. Does the project involve an EPA defined facility? Driveway Permit? Septic Plan Approval: Fire Marshall: If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? List Other: Date: Aug 15, 2014 Signature: WALTER W. R r aL This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. ** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification 3 Date: Aug 15, 2014 CDD Staff: Martin Lyd Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After - the -Fact 2X the published amount Not Applicable r $0.00 (— $0.00 Less than 1.75 acres: 1.76 to 5.00 acres: 5.01 to 40.00 acres: 40.01 acres or more: F- $30.00 e FX- $60.00 /-- F $90.00 `�6 Alm 1 80.00 F- $120.00 TOO' .. 40.00 F- $60.00 F- $120.00 AVID 15V � 'T) KODIAK ISLAND BOROUGH FINANCE DEPARTMENT