USS 3474 LT 3 CHINIAK - ZCP 8/15/2014Kodiak Island Borough Print Form Submit by Email
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615 111111111111111111 IN
Ph. (907) 486 - 9363 Fax (907) 486 - 9396 18303
http://www.kodiakak.us
Zoning Compliance Permit Permit No. BZ2015 -026
The following information is to be supplied by the Applicant:
Property Owner / Applicant: HESTER, VICKI
Mailing Address: PO BOX 5522, CHINIAK, AK 99615
Phone Number:
Other Contact email, etc.:
Legal Description: Subdv: USS 3474 CHINIAK Block: Lot: 3
Street Address: 43178 CHINIAK HWY
Use & Size of Existing Structures: SFR
Description of Proposed Action: YARD FILL FROM AKDOT
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review:
Lot Area: 2.61 AC
Front Yard: 25 '
Prk'g Plan Rvw? No
Staff Compliance Review Notes:
Plat / Subdivision Requirements?
Current Zoning: Conservation KIBC 17.50
Lot Width: 120'
Rear Yard: 25'
# of Req'd Spaces: 3
PROP_ID 18303
Bld'g Height: 35'
Side Yard: 25 '
Subd Case No. Plat No. Bld'g Permit No.
Does the project involve
an EPA defined facility?
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
If YES, do you have an EPA Return Receipt of
Notification?
"Permit will not be issued until receipt is submitted to
Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments?
List Other:
Date: Aug 15, 2014 Signature: WALTER W. R r aL
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
** EXPIRATION. A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
3
Date: Aug 15, 2014 CDD Staff: Martin Lyd
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable r $0.00 (— $0.00
Less than 1.75 acres:
1.76 to 5.00 acres:
5.01 to 40.00 acres:
40.01 acres or more:
F- $30.00
e
FX- $60.00 /--
F $90.00
`�6
Alm 1
80.00
F- $120.00 TOO'
.. 40.00
F- $60.00
F- $120.00
AVID 15V �
'T)
KODIAK ISLAND BOROUGH
FINANCE DEPARTMENT