Loading...
ALEUTIAN BK 12 LT 55A - ZCP 4/3/2014 Kodiak Island Borough Print Form Submit by Email 1 Community Development Department 710 Mill Bay Rd.Rm 205 1111111 11111111111M 111 Kodiak AK 99615 artist Ph.(907)486-9363 Fax(907)486 9396 14630 http://www.kodiakak.us Zoning Compliance Permit Permit No. CZ2014-034 The following information is to be supplied by the Applicant: Property Owner/Applicant: Hope Community Resources//Robt Smith dba Homesmith Mailing Address: 3264 Balika Ln Apt A, Kodiak,AK 99615 Phone Number: 907-942-3333 Other Contact email,etc.: kodiakrs @gmail.com Legal Description: Subdv: Aleutian Block: 12 Lot: 55A Street Address: 917 Mill Bay Rd Use&Size of Existing Structures: Business/Residential Description of Proposed Action: Upgrade electrical&lighting for servicing permitted main floor office space Site Plan to include: Lot boundaries and existing easements,existing buildings,proposed location of new construction,access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Business KIBC 17.90 PROP ID 14630 Lot Area: 6,813 Lot Width: Not Applicable Bldg Height: 50' Front Yard: 40'c/I Mill Bay Rear Yard: Not Applicable Side Yard: Not Applicable Prk'g Plan Rvw? No #of Req'd Spaces: Staff Compliance Review Notes: Plat/Subdivision Requirements? No change in req'd parking associated w/this permit Subd Case No. Plat No. Bldg Permit No. Does the project involve NO If YES,do you have an EPA Return Receipt of an EPA defined facility? Notification? "Permit will not be issued until receipt is submitted to Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that 1 will comply with the provisions of the Kodiak island Borough Code and that I have the authority to certify this as the property owner,or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback(yard)requirements. Attachments? List Other: Date: Apr 3,2014 Signature: Robt Smith(for Hope Community) � This permit is only for the proposed project as described by the applicant. if there are any changes to the proposed project,including its intended use,prior to or during its siting,construction,or operation,contact this office immediately to determine if further review and approval of the revised project is necessary. THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED. **EXPIRATION:A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance,or if the building construction or use is abandoned at any time,after the work is commenced,for a period of 180 days. Before such work can be recommenced,a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC)per KIBC 17.15.060 A.** CDD Staff Certification . )14Date: Apr 3,2014 CDD Staff: Martin Lydic Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room#104-Main floor of Borough Building After-the-Fact 2X the published amount Not Applicable r; $0.00 �J 7 $0.00 Less than 1.75 acres: $30.00 �(J(fJ 7 $60.00 1.76 to 5.00 acres: IT $60.00 r $120.00 5.01 to 40.00 acres: r $90.00 7 $180.00 40.01 acres or more: 7; $120.00 1-, $240.x0 APR KODIAK ISLAND BOROUGH FINANCE DEPARTMENT