Zoning Compliance Permit Permit No. CZ2014-033
The following information is to be supplied by the Applicant:
Property Owner/Applicant: Threshhold Services, Inc
Mailing Address: PO Box 8709, Kodiak,AK.99615
Phone Number: 907 486-6551
Other Contact email,etc.: 907 539-8280
Legal Description:
Subdv: Lakeside 2ND Block: Lot: 1B-2
Street Address: 380 Von Scheele
Use&Size of Existing Structures: Metal processing(recycling) BI'dg&misc
Description of Proposed Action: Install handicap access ramp&relocate parking
Site Plan to include: Lot boundaries and existing easements,existing buildings,proposed location of new construction,access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning: Industrial KIBC 17.105 PROP ID 16405
Lot Area: 27,521 Lot Width: 75' Bldg Height: Unlimited
Front Yard: 30' Rear Yard: 20' Side Yard: 20'
Prk'g Plan Rvw? Yes #of Req'd Spaces:
Staff Compliance Review Notes:
Plat/Subdivision Requirements? Bldg hgt may be limited by airport restrictions
Subd Case No. Plat No. Bldg Permit No.
Does the project involve N A If YES,do you have an EPA Return Receipt of
an EPA defined facility? Notification?
"Permit will not be issued until receipt is submitted to
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner,or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback(yard)requirements.
Attachments? Site Plan List Other:
Date: Apr 1,2014 Signature: t/Ken Reinke
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project,including its intended use,prior to or during its siting, construction,or operation,contact
this office immediately to determine if further review and approval of the revised project is necessary.
THiS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING PERMIT IS REQUIRED.
**EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance,or if the building construction or use is abandoned at any time,after the
work is commenced,for a period of 180 days. Before such work can be recommenced,a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC)per KiBC 17.15.060 A.**
CDD Staff Certification
4000
f
Date: Apr 1,2014 CDD Staff: Martin Lydick
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room# 104-Main floor of Borough Building
After-the-Fact 2X the published amount
Not Applicable r $0.00
IT $0.00
Less than 1.75 acres: v $30.00` i
0'a 1 r $60.00
1.76 to 5.00 acres: r $60.00 (
�v n $120.00
5.01 to 40.00 acres: r $90.00 r, $180.00
40.01 acres or more: r $120.00 pA = r; $240.00
APR I 2014
KODIAK ISLAND DOROUG
FINANCE DEPARTMENT
--.1 ca "NI..-1 / 1 ,.
/ j,61:
44 4 hilkt,&..
. r 4.' 6F../ I v
v
�q �S -r, M / c
6-5'< I '� V, 0.111L 44
\ e'4., ‘,... k AY ..".sr P'IP i t.)
1 11 �\
o U
�. . ;1\ \ 1 11\ V<t�„� r
l' LP Ckl \ I\ \ A \ , ... , /
a-
11..1 5 0 '1 v , �• 1
' .
01 NI Q \\ ,<Ov 1 W v,
�` 1 \C''''
° v
,/ `` \\ \ o O , c.,
��\ �c i -mot
X11 1 \ A
Jb 1 \ \A \ \\ w %
s
q 1 b� V
{,�,� t� Q
/ J�-- ��\ Cry F, O �� �/:
O vyti ��, y 1 At
_ 'o � /
S� / 1 \
.O� \
'�.� .p %' `/.1 P )
i
az
R.
. r.--------7— 1
t.T ( '
57' ,,, :
... i ki., , n r) ....„,- z .‘„, _) '_V . _ :
c 6i4t, pat', — ..; irt,), _..
y
' ,-- \
r
, j . - .
. , ' : 1 ikorort., 47kiLv-- / ' 4> ''' it
,
1'. .' '-� ...._ /' ja , "yq.�J M1 a �7
C5o72,/,,--os ‘3,'
From: cache[mcacheseel @hotmail.com] ` /,
fizi
Sent: Sunday, March 30, 2014 4:24 PM
To: Ken Reinke
Subject: RE: Seel Construction wheelchair accessability project
i/z ?.
Hi Ken,
So as you can see in the drawing the landing needs to be extended out to 60 inches to meet ADA requirements
for the swing of your door. As the landing already extends 24 inches to the left of the door nothing needs to
be added there. The fall is just under four inches so I drew in a ramp extending four feet which keeps us well
within the one inch per foot drop. Also and perhaps a little less clear on the drawing is D1 gravel compacted
against the side of the ramp sloping away at the same drop.
Thanks,
Cache
Ken Reinke
From: cache[mcacheseel @hotmail.com]
Sent: Thursday, January 16, 2014 9:36 AM
To: ken.threshold @gci.net
Subject: Seel Construction wheelchair accessability project
Attachments: Est_21_from_Seel_Construction_2232.pdf
Hi Ken,
This is the estimate for the wheelchair accessability project. The proposal includes
extending the existing landing to meet or exceed the required turnaround radius -For a
wheelchair. From the extended landing installing a concrete ramp not to exceed 10 degrees.
Also, installing appropriate door hardware to comply with ADA standards.
The landing extension and ramp will be attached to the existing landing by #5 rebar dowels
drilled and epoxied into the existing landing and extending into the new pour by no less than
six inches and spaced no more than one foot centers. All concrete will have a minimum depth
of six inches of six sack, mesh reinforced concrete with a #5 rebar blanket on one foot
centers, which will be sufficient to protect the ramp from vehicle traffic. Edges will be
rounded over everywhere else will be broom finished. Building pad will be compacted D1
gravel.
The area surrounding the pour will have to be contained to protect it from either rain or
freezing. The air temperature in the containment must be kept at a minimum of 38 degrees for
two days following the pour to ensure proper curing.
All work will be inspected by the Kodiak Island Building Inspectors to ensure quality
control.
Thank you,
Cache Seel e ()/4/^.--Z73