ALEUTIAN BK 5 LT 38A - ZCP 10/9/2013 Kodiak Island Borough L Print Form Submit by Email
Community Development Department
710 Mill Bay Rd.Rm 205
1
!
I 11111111111111 11111
' Ph.(907)486-9362 Fax(907)486-9396
http://www.kodiakak.us 19 414
Zoning Compliance Permit Permit No. CZ2014-012
The following information is to be supplied by the Applicant:
Property Owner/Applicant: Simeonoff, Ellen
Mailing Address: PO Box 1870, Kodiak,AK 99615
Phone Number: 1.907.539.2776
Other Contact email,etc.: ellensimeonoff @hotmail.com
Legal Description: Subdv: Aleutian Block: 5 Lot: 38A
Street Address: 311 Pine Crescent Lp
Use&Size of Existing Structures: SFR
Description of Proposed Action: Add stairs to rear deck
Site Plan to include: Lot boundaries and existing easements,existing buildings,proposed location of new construction,access points,
and vehicular parking areas.
Staff Compliance Review: Current Zoning: R1 KIBC 17.75 PROP ID 14414
Lot Area: 2,981 Lot Width: 60' Bld'g Height: 35'
Front Yard: 25' Rear Yard: 10' Side Yard: 5'
Prk'g Plan Rvw? No #of Req'd Spaces: 1
Staff Compliance Review Notes:
Plat/Subdivision Requirements? Grandfathered-nonconforming
Subd Case No. Plat No. Bldg Permit No.
Does the project involve NO If YES,do you have an EPA Return Receipt of
an EPA defined facility? Notification?
"Permit will not be issued until receipt is submitted to
KlB"
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: i hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that!
have the authority to certify this as the property owner,or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback(yard)requirements.
Attachments? Site Plan List Other:
Date: Oct 9,2013 Signature: Ellen Simeonoff .,'
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project,including its intended use,prior to or during its siting,construction,or operation,contact
this office immediately to determine if further review and approval of the revised project is necessary.
**EXPIRATION:A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance,or if the building construction or use is abandoned at any time,after the
work is commenced,for a period of 180 days. Before such work can be recommenced,a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC)per KIBC 17.15.060 A.**
CDD Staff Certification
tvt (
Date: Oct 9,2013 CDD Staff: Martin Ly
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office om#104-Main floor of Borough Building
After-the-Fact 2X the published amount
Not Applicable r $0.00 fl $0.00
Less than 1.75 acres: 17 $30.00.'l --= A 6$60.00
1.76 to 5.00 acres: r $60.00 120.00
5.01 to 40.00 acres: r $90.00 OCT:111EpA 9 $180.00,P1tT
40.01 acres or more: r s12o.00 KOu/AK s24o.o0
FINANCE BOROUGH
•
RTMENT
LLa V — .. W 0 C>G2=2 z v2T (�
G7 a D-D DO 1.-m0 �
-.�cn�m-iXID I r l
(�,J z of u, OW=MZmm �Dp _7
to/ X J O A —z O D 1 I
0 D I <1; 1 m Z
/ Z m
\_____
3ti
/
o I. ? Nd Q mss; °.• 4f
�J • 4g,! ° W'7`° -"1 a 'M�" d
lc) • / / is '� {.h toy u V • y
r u /
r
•r Gaiy % /
it. /P.\ jj( •?#,0.1 4P
/o. .t"VF-i /
neon
/• zzro 2
T /
// 2 Z� / C)
I • z o / 2
c,/ 0 0 c5 m 0
x LO
ps
• / O Z ��
op
mA
n 0
7
A /
\1 / \c> >,
<_,_. 9 / .
\ • \\-\
\\
\\ • NJ
\
CI:4
'\\ \ \° �� //'o n
vl� • FT //
ate •• 2o F FF a \ /
9y0\ \\ J An \ / / j Lo cGTF\\. C'q • 0-`• \ ERs `�
\P\,\ \ 'v, \ \/ �;,
O \ \ // s,
P,,,
-5, \\ \ ////
Gib' �' 0 O �� ,/64.90(1(—C42 A Pz,,x0
co\
7
0
\‹� �'4 3 � \_ /
y�
\cam , do
,____./
.. .._. .,