FY2014-22 Adopting a 2014 Communities State Legislative Capital Improvements Projects Priority List 1 Introduced by: Borough Manager
2 Requested by: Borough Assembly
3 Drafted by: Special Projects Support
Introduced on: 01/02/2014
4 Adopted on: 01/02/2014
5
6 KODIAK ISLAND BOROUGH
7 RESOLUTION NO. FY 2014-22
8
9 A RESOLUTION OF THE KODIAK ISLAND BOROUGH ASSEMBLY
10 ADOPTING A 2014 KODIAK ISLAND BOROUGH COMMUNITIES
11 STATE LEGISLATIVE CAPITAL IMPROVEMENT PROJECTS
12 PRIORITY LIST
13
14 WHEREAS, the Kodiak Island Borough is a regional government representing the citizens
15 and communities of the Kodiak Island Archipelago; and
16
17 WHEREAS, these communities have developed a list of improvement and infrastructure
18 needs for their citizens and visitors; and
19
20 WHEREAS, these communities include the home rule city of Kodiak, the second class
21 cities of Akhiok, Larsen Bay, Old Harbor, Ouzinkie, and Port Lions; and the unincorporated
22 community of Karluk; and
23
24 WHEREAS, Community Capital Improvement Project (CIP) needs are identified and
25 prioritized by each of the communities and forwarded to the Kodiak Island Borough for
26 inclusion into an island wide list to be considered by the Alaska Legislature.
27
28 NOW, THEREFORE BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND
29 BOROUGH THAT the Kodiak Island Borough Communities 2014 State Legislative Capital
30 Improvement Projects Priority Lists are as follows:
31
32 City of Kodiak
33 1. Monashka Pumphouse Replacement $2,500,000
34 2. E911 Replacement Equipment $400,000
35 3. Shelikof Street Bulkhead Parking $1,650,000
36 4. Shelikof Street Pedestrian Improvements $3,800.000
37 Total $8,350,000
38
39 City of Akhiok
40 1. Completion of Sewer Upgrades $1,000,000
41 2. Design & Construction of New Landfill $1,000,000
42 3. New Playground Equipment for School $100,000
43 Total $2,100,000
44
45 City of Larsen Bay
46 1. Deepwater Dock/Moorage and Piping for Fuel Delivery $550,000
47 2. Replacement Aggregate for Roads $400,000
48 3. Upgrade and Deepen Water Reservoir and Dam $1,250,000
Kodiak Island Borough, Alaska Resolution No. FY2014-22
Page 1 of 3
49 4. Replace Machine Shop Building/Garage $650,000
50 5. Upgrade City/Senior/Teen Center Municipal Building $750,000
51 6. Install Streetlights & Replace underground power lines $650,000
52 Total $4,250,000
53
54 City of Old Harbor
55 1. Hydroelectric Power Project $8,000
56 2. Airport Improvements $10,000,000
57 3. Bear Proof Dumpsters/Dumper Repair $20,000
58 4. City Shop $120,000
59 5. Emergency Response skiff with outboard motor and trailer $75,000
60 6. Landfill Building $80,000
61 Total $10,303,000
62
63 City of Ouzinkie
64 1. Water Transmission Line Dame to Water Treatment Plant $1,000,000
65 2. Electrical Infrastructure Upgrade $1,000,000
66 3. Alternative Energy Development Projects $250,000
67 4. Anton Larsen Bay Road Extension $8,000,000
68 5. Electrical Upgrade to Boat Harbor $20,000
69 6. Equipment Upgrades $225,000
70 7. Community Roads Resurfacing $3,600,000
71 8. Ouzinkie Municipal Building $1,400,000
72 9. Heavy Equipment Storage building/Shop $250,000
73 10. Fire Hall Roof Replacement $15,000
74 11. Fire Hall Furnace Replacement $10,000
75 12. Tourism Development $827,500
76 Total $16,597,500
77
78 City of Port Lions
79 1. Small Boat Harbor Stub Breakwater $1,700,000
80 2. Sludge Lagoon $370,000
81 3. City Maintenance Building Replacement $200,000
82 4. Heavy Equipment/Rock Screen Crusher & Conveyor $375,000
83 5. New Subdivision Development $800,000
84 6. Harbor Water Main $1,000,000
85 7. Municipal Building Repair $75,000
86 8. Road Upgrades $1,200,000
87 Total $5,720,000
88
89 Community of Karluk
90 1. Purchase 120 KW Generator $200,000
91 2. Community Water Tank & Distribution System $250,000
92 3. Plan & Design Water Treatment Plant $200,000
93 4. Community Hall/Clinic Renovation $300,000
94 5. Landfill Relocation $400,000
95 6. Education Assistance for Karluk School $20,000
Kodiak Island Borough, Alaska Resolution No. FY2014-22
Page 2 of 3
96 Total $1,370,000
97
98 BE IT FURTHER RESOLVED that the Kodiak Island Borough administration is hereby
99 instructed to advise the Governor and our Legislative Representatives of the State of
100 Alaska of the Kodiak Island Borough Communities 2014 State Legislative Capital
101 Improvements Project Priority List adopted by the Kodiak Island Borough Assembly.
102
103 ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH
104 THIS SECOND DAY OF JANUARY, 2014
105
106 KODIAK ISLAND BOROUGH
107
108
1/7' /109 N /, i�,% ti,
110 J&rol Friend, Borough Mayor
111
112 ATTEST:
113
114
115 i 1 / �i
116 Nova M. Javier, MMC, Borough Clerk
117
Kodiak Island Borough, Alaska Resolution No. FY2014-22
Page 3 of 3