Loading...
LARSEN BAY TR A BK 11 LT 2 - ZCP 7/27/2012Print Form 1 Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit I Submit by Email j I JIIIIIIIIIIIIIII Iu 20099 Permit No. BZ2013 -070 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: The following information is to be supplied by the Applicant: Kodiak Island Borough 710 Mill Bay Rd., Kodiak, AK. 99615 (907) 486 -9374 Matt Gandel, Project Manager/ Inspector, 486 -9211, mgandel @kodiakak.us Subdv: Larsen Bay Street Address: nhn larsen Bay Use & Size of Existing Structures: Block: 11 Lot: 2 Larsen Bay School Description of Proposed Action: Removal of existing asphalt built -up roof assembly & intallation of new PVC membrane Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Public Use KIBC 17.130 PROP ID 20099 Lot Area: 2.26 acres Lot Width: Not Applicable Bldg Height: Not Applicable Front Yard: Not Applicable Rear Yard: Not Applicable Side Yard: Not Applicable Prk'g Plan Rvw? No # of Req'd Spaces: Staff Compliance Review Notes: Plat / Subdivision Requirements? No change in use / No change to existing parking Subd Case No. Plat No. BId'g Permit No. Does the project involve an EPA defined facility? Driveway Permit? Septic Plan Approval: Fire Marshall: If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: Jun 27, 2013 Signature: Matt Gandel (for Bud Cassidy) This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. **EXPIRATION., Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: Jun 27, 2013 CDD Staff: Martin Lydick Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After - the -Fact 2X the published amount Not Applicable F $0.00 r $0.00 Less than 1.75 acres: r $30.00 r $60.00 1.76 to 5.00 acres: r $60.00 r $120.00 5.01 to 40.00 acres: r $90.00 r $180.00 40.01 acres or more: r $120.00 r $240.00 NINE wr. ag O" €ujlgl m 00 ENO*;'" 0 0 0 0 0 0 e>fseltl'>le.PON palol3 lua\ua0eldag 30013 'p � loogas Ara uas"j }3IAscp loogas g2noang puelsI )jelpox yg44 _ a A3��13- c7 Al c,-- H 3l'Plol9al 'E.d'4 LX" JGd aq.pV 1p..q Wtl OY :ZKg ELomz1c , woAa I 'BmP'LOZM4mb10p\Pep \OlOERSpafad \'J 0 0 0 0 0 0 0 0 0 0 0 e>fseltl'>le.PON palol3 lua\ua0eldag 30013 'p � loogas Ara uas"j }3IAscp loogas g2noang puelsI )jelpox yg44 _ a A3��13- c7 Al c,-- H 3l'Plol9al 'E.d'4 LX" JGd aq.pV 1p..q Wtl OY :ZKg ELomz1c , woAa I 'BmP'LOZM4mb10p\Pep \OlOERSpafad \'J \� Rf }\ \\ \\ L \ ( � ( /§ »� � } � / \ \ \ \ ( l ! [ [\ | ) \ [ 7§ E (- ( § \! Eƒ § §( uq \ \ ( (( ( \ ) ) §{ $ ON / 7 \� Rf }\ \\ \\ L \ ( � ( /§ »� � } �