Loading...
ALEUTIAN BK 10 LT 30 - ZCP 6/5/2012 (2)Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 a Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form SubmitbyEmail I I IIIIIIIIIIIIIIIIIII III 14564 Permit No. CZ2012 -84 The following information is to be supplied by the Applicant: Property Owner /Applicant: Richard Lindholm Mailing Address: Box 474 Phone Number: 486 -8297 Other Contact email, etc.: Legal Description: Subdv: Aleutian Homes Sub. Block: 10 Lot: 30 Street Address: 412 Birch Use & Size of Existing Structures: SFR Description of Proposed Action: Reroof Site Plan to include. Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: RI KIBC 17.75 PROP ID 14564 Lot Area: .11 AC Front Yard: Not Applicable Prk'g Plan Rvw? Not Applicable Plat / Subdivision Requirements? Lot Width: Not Applicable Rear Yard: Not Applicable # of Req'd Spaces: Bld'g Height: Not Applicable Side Yard: Not Applicable Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? N/A "Permit will not be issued until receipt is submitted to KIB" N/A Subd Case No. Plat No. Bldg Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Not Applicable List Other: Date: Jun 5, 2012 Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: Jun 5, 2012 C d ff: Bud Cassidy Payment Verification Zoning ComrW &I� it , ,eePPayable in Cashier's Room # 104- Main floor of Borough Building �nngipakplsr�ngpo�ar�pupg }� Not Applicable r $0.00 Less than 1.75 acres: r $30.00 1.76 to 5.00 acres: j— $60.00 5.01 to 40.00 acres: F $90.00 40.01 acres or more: F— $120.00 After - the -Fact 2X the published amount F $0.00 F- $60.00 F— $120.00 F $180.00 F— $240.00