Loading...
USS 3066AB BK 2 LT 9 - ZCP 5/18/2012y Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax(907)486 -9396 —httr)://www.kodiakak.us Zoning Compliance Permit Print Form Submit by Email I I IIIIIIIIIIIIIIIIIIIIII 20780 Permit No. 622012 -54 The following information is to be supplied by the Applicant: Property Owner /Applicant:• Orthodox Mission Mailing Address: P.O. Box 1517 Phone Number: 486 -4376 Other Contact email, etc.: Legal Description: Subdv: USS 3066 AB Street Address: 1895 Mission Road Use & Size of Existing Structures: St. Innocent's Academy Block: 2 Lot:9 Description of Proposed Action: Removal of existing fireplace and installing a window in the same area. Installing a wood stove nearby. Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Business KIBC 17.90 Lot Area: N/A Front Yard: Not Applicable Prk'g Plan Rvw? Not Applicable Plat / Subdivision Requirements? Lot Width: Not Applicable Rear Yard: Not Applicable # of Req'd Spaces: PROP -0 20780 Bld'g Height: Not Applicable Side Yard: Not Applicable Does the project involve N/A If YES, do you have an EPA Return Receipt of Notification? N/A an EPA defined facility? "Permit will not be issued until receipt is submitted to K18" Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan List Other: Date: May 18, 2012 Signature: �/ Z /� , This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: May 18, 2012 CDD Staff: Bud Cassidy &', T Payment Verifica compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building g''Z,,OVVVVVVt ■�� Kodiaki00080100 RnJfRTPPP"nt F $0.00 Less than 1.75 acres: FX_ $30.00 1.76 to 5.00 acres: r $60.00 5.01 to 40.00 acres: F $90.00 40.01 acres or more: r' $120.00 After the -Fact 2X the published amount F- $0.00 F_ $60.00 F_ $120.00 F_ $180.00 F_ $240.00