Loading...
MILLER PT 1ST BK 9 LT 6B - ZCP 6/20/2013Submit by Email 1 Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form 1 21873 Permit No. BZ2013 -068 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: Dayna Ferguson // Bernie Bros PO Box 8612, Kodiak, AK. 99615 907.512.0683 // 907.481.3900 Subdv: Miller Point 1st Addition 3435 Antone Way Block: 9 Lot: 6B SFR Description of Proposed Action: Interior remodel: Family room to bedroom Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Lot Area: 20,037 Current Zoning: RR1 Front Yard: 25 ' Prk'g Plan Rvw? No KIBC 17.70 Lot Width: Rear Yard: 80' PROP_ID 21873 Bld'g Height: 35' 20' Side Yard: 10' # of Req'd Spaces: 3 Staff Compliance Review Notes: Plat / Subdivision Requirements? No changes /reduction to existing parking Subd Case No. Plat No. Bld'g Permit No. Does the project involve an EPA defined facility? Driveway Permit? Septic Plan Approval: Fire Marshall: If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Not Applicable List Other: Date: Jun 20, 2013 Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. "EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 706.4.4 Expiration. 1997 UBC) per KIBC 77.15.060A.** CDD Staff Certification Date: Jun 20, 2013 CDD Staff: Martin Lydick Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104 - Main floor of Borough Building After the -Fact 2X the published amount Not Applicable F $0.00 i( ��r,_, r /// /v`�p "}J'� $0.00 Less than 1.75 acres: FT $30.00 l $60.00 1.76 to 5.00 acres: F ^"(�wr R.I l _ A E"C ■ f w� +� iii���r $120.00 5.01 to 40.00 acres: r $90.00 $180.00 40.01 acres or more: r $120.00 JUN 20 2013 r $240.00 KODIAK ISLAND BOROUGH 710 Mill Bay Rd Kodiak AK 99615