Loading...
MILLER PT BK 2 LT 1B-2 - ZCP 5/14/2013Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form u 11 Submit by Email 21667 Permit No. BZ2013 -061 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: Chris Kostelecky PO Box 2383, Kodiak, AK. 99615 907.486.9446 Subdv: Miller Pt 1161 Abercrombie Block: 2 Lot: 1B -2 Detc'd garage (1,440sgft) mhr - removed Description of Proposed Action: NSFR Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: RR1 KIBC 17.70 PROP_ID 21667 Lot Area: 23,306 Lot Width: 120' Bldg Height: 35' Front Yard: 25' Rear Yard: 20' Side Yard: Prk'g Plan Rvw? Yes # of Req'd Spaces: 3 Staff Compliance Review Notes: Plat / Subdivision Requirements? Corner, 10' lot side yard Monashka Bay Rd Subd Case No. Plat No. Bld'g Permit No. Does the project involve an EPA defined facility? Driveway Permit? Septic Plan Approval: Fire Marshall: If YES, do you have an EPA Return Receipt of Notification? "Permit will not be issued until receipt is submitted to KIB" Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: May 14, 2013 List Other: Signature: This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, fora period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification � y Date: May 14, 2013 CDD Staff: Martin Ly i NJ V Payment Verification Zoning Compliance Permit Fee Payable in Cashier's0 e Room # 104 -Main floorof Borough Building After - the -Fact 2X the published amount Not Applicable r $0.00 I , F $0.00 Less than 1.75 acres: r $30.00 I `/ (- $60.00 1.76 to 5.00 acres: r $60.00 PAID F- $120.00 5.01 to 40.00 acres: F- $90.00 �\ F- $180.00 40.01 acres or more: F- $120.00 MAY 14 2013 F- $240.00 KODIAK ISLAND BOROUGH I�FINANCE DEPARTMENT u I I I