Loading...
02/28/2013 Special Meeting KODIAK ISLAND BOROUGH Assembly Special Meeting February 28, 2013 A special meeting of the Kodiak Island Borough Assembly was held on February 28, 2013 in the Borough Conference Room of the Kodiak Island Borough Building, 710 Mill Bay Road. The meeting was called to order at 7:30 p.m. Present were Mayor Jerome Selby, Assembly members Carol Austerman, Tuck Bonney, Dave Kaplan, Chris Lynch, and Mel Stephens. Staff members present were Borough Manager Bud Cassidy, Engineering and Facilities Director Woody Koning, Projects Manager /Inspector Matt Gandel, and Clerk Nova Javier. KAPLAN moved to excuse Assembly members Griffin and Stutes who were absent due to personal leave. VOICE VOTE ON MOTION CARRIED UNANIMOUSLY. CITIZENS' COMMENTS Bob Stanford spoke on tourism development in Kodiak and advocated for additional funding for Discover Kodiak. CONSIDERATION OF MATTERS IN THE CALL FOR THE SPECIAL MEETING A. Contract No. FY2013 -19 Approving a Professional Services Agreement for Code Compliance Review of the Long Term Care Facility Project Design Documents. KAPLAN moved to authorize the Manager to Execute Contract No. FY2013 -19 with PC Associates for Code Compliance Review Services for the Long Term Care Facility design documents in an Amount Not to Exceed $36,382. The Code Compliance Review of construction documents was normally outsourced by the local building official to verify that the building would meet all structural and Americans with Disabilities Act (ADA) code requirements. In addition, Engineering /Facilities staff discussed the need for a review of the construction documents for compliance with National Fire Protection Association 101 Life Safety Code (NFPA 101). Due to the Long Term Care Facility being a healthcare facility that was subject to Medicare and Medicaid requirements, the State Fire Marshal would inspect the facility for compliance with NFPA 101 code prior to granting a Certificate of Occupancy. Determining any possible code concerns prior to construction was a crucial step to ensuring on- time completion of the project. The cost to submit the plans to the local building official for structural and ADA compliance review, and to the State Fire Marshal for NFPA 101 compliance review, was slightly more than the cost for PC Associates to perform both reviews. Having PC Associates perform both reviews would provide a cost . savings and would allow them to perform both reviews concurrently, meaning final drawings ready for permitting would be available sooner. Kodiak Island Borough Assembly Minutes February 28, 2013 Page 1173 PC Associates recently completed a Code Compliance Review as well as a Coordination /Constructability Review for the Kodiak High School Addition and Renovation project, and both Engineering /Facilities staff and the local building official were very pleased with the result. PC Associates specialized in plan review and had performed their services throughout the west since 1989. In accordance with KIB 3.30.070.A Exception to bidding requirements which allowed for the exception to the procurement rules for contracts for professional or unique services, staff recommended authorizing the Manager to enter into a professional services agreement with PC Associates for the services outlined in the proposal provided in an amount not to exceed $36,382. ROLL CALL VOTE ON MOTION CARRIED FOUR TO ONE: Austerman, Bonney, Kaplan, and Lynch (Ayes); Stephens (No). ADJOURNMENT KAPLAN moved to adjourn the meeting. ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY: Austerman, Bonney, Kaplan, Lynch, and Stephens. The meeting was adjourned at 7:45 p.m. KODIAK ISLAND BOROUGH l.. I ATTEST: Je t.me M. Selby, .,r / • 1 Nova M. Javier, MMC, ;trough Clerk Approved on: March 21, 2013 Kodiak Island Borough Assembly Minutes February 28, 2013 Page 1174