Loading...
NEW KODIAK BK 8 LT 5-7 - ZCP 4/1/2013Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form 15520 Submit by Email Permit No. CZ2013 -074 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: Bishop, R.C. 420 W marine Way, Kodiak, AK. 99615 486 -3708 Subdv: New Kodiak Subdivision 402 Marine Way Block: 8 Lot: 5 - 7 Business Building Description of Proposed Action: Replace windows in 2nd storey apts Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: Business KIBC 17.90 PROP ID 15520 Lot Area: 5,200 sqft Lot Width: Not Applicable Bldg Height: 50' Front Yard: Not Applicable Rear Yard: Not Applicable Side Yard: Not Applicable Prk'g Plan Rvw? No # of Req'd Spaces: Staff Compliance Review Notes: Plat / Subdivision Requirements? Does the project involve If YES, do you have an EPA Return Receipt of Notification? an EPA defined facility? "Permit will not be issued until receipt is submitted to K18" Subd Case No. Plat No. Bld'g Permit No. Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? List Other: Date: Apr 1, 2013 Signature: Randall C. Bishop L , 3 AJ . This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 780 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 780 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBQ per KIBC 17.75.060 A. ** CDD Staff Certification Date: Apr 1, 2013 CDD Staff: Martin c Payment Verification Zoning Compliance-Permit Fee Payable in Cashier's NotAp lic } ,401 $0.00 L ess S:� i A $30.00 1.76 to 5.00 acres: FX $60.00 5.01 to 40.00 acres: F $90.00 40.01 acres or more: F $120.00 # 104- Main floor of Borough Building After - the -Fact 2X the published amount $0.00 ( $60.00 F $120.00 F $180.00 F $240.00