USS 2538A LOT 2 ARMORY - ZCP 3/18/2013Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
Submit by Email
II
ilia
16190
111
IIu
Permit No. CZ2013 -050
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
State of Alaska
2200 East 42nd Avenue, Anchorage AK 99508
907 - 269 -0813
ericka.moore@alaska.gov
Subdv: USS 2538A
125 Powel Avenue, Kodiak AK 99615
Block: Lot: 2
Training. Building is 9,908 SF.
Description of Proposed Action: Re roofing of the facility, Upgrading the mechanical room, replacing the existing fuel tank, minor
siding repairs, door and window replacement
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Current Zoning: Public Use
KIBC 17.130 PROPID 16190
Lot Area: Lot Width:
Front Yard: Rear Yard:
Prk'g Plan Rvw? No # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
Bld'g Height:
Side Yard:
YES
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KIB"
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Other List Other: Heating Upgrades Drawings Cru l z G I ni r, v
Date: Oct 8, 2012 Signature: J Ericka Moore,,
J OIX
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Oct 8, 2012 COD Staff: Martin Lydick
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Rdbm # 104- Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable
F
$0.00 F
$0.00
Less than 1.75 acres:
r
$30.00 I, 1 r
$60.00
1.76 to 5.00 acres:
F
$60.00 V 1 F
$120.00
5.01 to 40.00 acres:
F
$90.00 D r
$180.00
40.01 acres or more:
$120.00 r
$240.00
MAR 18 2013
9/V
(00 .a - -- , 301104,
cingfl o 0 ypri5rt mAn+
POWELL AVE
n
Vicinity Map
)JECT
A ION
Street Map
�20(�s -Of �
��g13 Gqjo