POWELL ESTATES LT 3 - ZCP 3/14/2013Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form
11
Submit by Email
IllIlIilIl I 1
21567
Permit No. CZ2013 -071
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
Og Youn (Diane) Hwang
3514 Sharatin Rd., Kodiak, AK 99615
907.942.5006
Subdv: Powell Est
3514 Sharatin Rd.
Block: Lot: 3
Tri -plx
Description of Proposed Action: Establish home occupation (Unit A —1,473 sqft gross)
1,473 sqft x 25% =338 sqft allowance : ground level location = —192 sqft : 192 < 338 = OK
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Lot Area: 8,925 square feet
Current Zoning: R3 KIBC 17.85
PROP_ID 21567
Lot Width: 60' Bld'g Height: 35'
Front Yard: 25' Rear Yard: 10' Side Yard: 5'
Prk'g Plan Rvw? Yes # of Req'd Spaces: 6
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
NO
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KlB"
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Mar 14, 2013
List Other:
Signature: Hiroyuki Ikawa (for Diane)
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
** EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 780 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
706.4.4 Expiration. 7997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Mar 14, 2013 CDD Staff: Martin Lydick
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room # 104- Main floor of Borough Building
Aker - the -Fact 2X the published amount
Not Applicable
r
$0.00
r
$0.00
Less than 1.75 acres:
r
$30.00
r
$60.00
1.76 to 5.00 acres:
(—
$60.00
F
$120.00
5.01 to 40.00 acres:
r
$90.00
F
$180.00
40.01 acres or more:
r'
$120.00
r
$240.00
Vv�
NJ
3