T29S R28W TL 601 SPIRIDON BAY - ZCP 3/8/2013Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
rint Form
11111
22631
Submit by Email
11
Permit No. BZ2013 -034
Property Owner/ Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
Robert C. Wolfe
36430 Wake Forest Ct., Soldotna, AK.99669
(907) 262 -1646 cell: (907) 252 -5472
rcwolfe3 @gmail.com
Subdv: T295 R28W TL 601 - Spiridon Bay
nhn
Block: Lot:
Vacant
Description of Proposed Action: 16' x 28' recreational cabin, 12' x 20' accessory bldg; 4' x 4' privy
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review:
Lot Area: 16.27 ac
Current Zoning: Conservation KIBC 17.50
Front Yard: Not Applicable
PROP_ID 22631
Lot Width: 250' Bld'g Height: 35'
Rear Yard: 25 ' Side Yard: 25 '
Prk'g Plan Rvw? No # of Req'd Spaces:
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
Marine water frontage
NO
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KIB"
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Appl icant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Mar 4, 2013
List Other:
e
Signature: Robert C. Wolfe (by Martin Lydick)
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Mar 4, 2013 CDD Staff: Martin Lydick
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office RocK # 104 - Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable
r
$0.00 I ^F� „I ,` "X"( F
UU
$0.00
Less than 1.75 acres:
r
W
$30.00 �y'I/� !Jjt,r
r
$60.00
1.76 to 0
� f-
F-
$120.00
5.01 to 40.00 acres:
40. acre
r
$90.00
1A AI
$180.00
40.01 acres or more:
.00 F
MAR i 12013
$240.00
Kd1' J►vu
�irf9�flf �' i ��4°rrwfryrOn"
MISM
Area proposed for development w/ application.
Ref: Zoning Compliance Permit # BZ2013 -034 3/4/13
Goo le earth feet 900
meters 200
.�� Kodiak Island Borough
4 A 'n „ Community Development Department
`' 710 Mill Bay Rd. Rm 205
o Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
ftttr)Wwww.kod iakak.us
Zoning Compliance Permit Permit No. - o
The following information is to be supplied by the Applicant:
Property Owner /Applicant: ' R"j ... l . C. Wolve.
Mailing Address: �ALr No Watt Fofc&4 Snjdb&cs AK i c iiu i f
Phone Number: 9o"7 - a(eg-- KPLAILe ,cl:lj 90'J. 45a- 5r-l7oQ,
Other Contact email, etc.: `moo{ -pe 3Q 4Mar Cbrv�
Legal Description: Subdv: Jags Block: Lot:
Street Address: `
Use & Size of Existing Structures: 1 f�
Description of Proposed Action: 10 Ar f cC �i List 4 lfokz8' Qwbi�) w h
0, I X u2,a 5644 uAld S Y - yW 0W4A0%4Se-
Site Plan to include: Cot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review: current zoning:
Lot Area
Front Yard:
Prk'g Plan Rvw?
Plat / Subdivision
Requirements?
Does the project involve
an EPA defined facility?
Lot Width:
Rear Yard:
4 of Req'd Spaces:
Bld'g Height:
Side Yard:
PROP_ID ' °G3 I
If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to K18'
I