Loading...
05/22/2012 Regular Meeting Architectural /Engineering Review Board ' I Regular Meeting -22 -23 May 2012 -5:30 PM Ij JUL 1 8 2012 I KFRC Conference Room --� BOROUGH CLERK'S OFFICE A. Call to Order Chair Hacker called the meeting to order at 5:30 pm. B. Roll Call Board members present were Gregg Hacker (GH), Scott Bonney (SB), Cliff Ford (CF), Sonny Vinberg (SV). KIB Staff Present were Woody Koning (WK), Kelsea Kearns (KK) and Jessica Wolfe (JW). Also present was Tony Yorba, Jensen Yorba Lott; Matt Glassman, DLR Group; Chris Gianotti, Brian Nielson, PND Engineers; Chris Lynch, Kodiak Construction Services A QUORUM WAS ESTABLISHED. SV MOVED TO EXCUSE Jerrol Friend, Mike Brechan and Ray Nordgulen due to previous commitments. MOTION PASSED UNANIMOULLY C. Approval of Agenda SV MOVED TO CHANGE AGENDA: Approval of 80% Design Development Documents after Board Member comments. MOTION PASSED UNANIMOUSLY D. Approval of 2/28- 29/2012 minutes CF MOVED TO APPROVE THE ABOVE MENTIONED MINUTES. MOTION PASSED UNANIMOUSLY E. Tony Yorba KISS Addition & Renovation 80% Design Development Presentation Chair Hacker turned the meeting over to YORBA for presentation and discussion of' progress to date. Structural and Architectural design staff were present. 7:53 PM MEETING WAS RECESSED UNTIL FOLLOWING DAY 5/23/2012 F. Roll Call Chair Hacker called the meeting to order 5:30 pm. Board members present were Gregg Hacker (GH), Cliff Ford (CF), Sonny Vinberg (SV) A QOURUM WAS NOT ESTABLISHED. Board members present decided to continue on with meeting as a work session. No voting will be conducted. G. Tony Yorba continued the 80% Design Development presentation. Civil Engineer, Paul Kendall, Electrical Engineer, Robert Posma and Mechanical Engineer, Roger Full, PDC Engineers design staff were present. Design issue tracker spreadsheet with ARB comments /concerns attached. H. Public Comments None I. Staff Comments WK thanked everyone for all their hard work and dedication. He also reported that KIB had hired PC & Associates to conduct a peer review and code review for the design documents. J. Board Member Comments GH thanked everyone for their time and effort. K. Adjournment GH closed the work session at 9:50 pm Respectfully submitted: AO a., ,.L Late, Date: Jes c. Wolfe, Projects_Assi. , n / Lam:% Date:I /6 2-0/ "z Gregg `ack•r hair ArchitecturafEn_ineering Review Board Kodiak Island Borough 7/9/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Item Ni,ensen Yorba Lott, Inc. Issue By To Date Action Rogers Comments Issued Required 001 Phasing should show chain link requirements of temporary AI213 A 5/ Y circulation and construction protection. 002 Additional touch up of BB court refinish should be included in ARI3 A 5/23/12 Y project as temporary student circulation will be routed through the court. 003 Lay down area should be shown on site phasing plan. Other ARB A 5/23/12 1' burrow properties should be considered. 004 Need to remove roof hatch by stair at auditorium and provide ARB A 5/23/12 Y side wall access to roof. 005 Roof harness points should be included in the project. ARB A 5/23/12 V 006 Method and location for roof drain overflow day lighting AR11 M 5/23/12 Y lets discuss. Overflow needs to should be reviewed. be visible and is intermittent unless a problem exists • 007 Replacement Voc Ed Siding and main AHU need to be ARR A +M 5/23/12 Y Main AHU can be installed coordinate with phasing. through existing access, before or after renovations to existing boiler room. loos Ability to remove existing concrete siding panels at gym S S 5/23/12 Y should be reviewed to potentially mitigate the need for new shear walls at gym. 009 Exterior window details need to show vapor barrier Al213 A 5/23/12 Y continuing around rigid insulation. 010 Wall base details need to add screen material at base shims A A 5/23/12 Y for Bat protection. 01 1 Parapet at metal siding needs to be revised and avoid bat nest A A 5/23/12 Y potential. 012 Rolled curbs need to be provided at snow storage area ARB C 5/23/12 - perimeters, ensure rebar is sized for weight of front loaders. 013 Green House to be relocated directly North of its current ARR C,S,L,P. 5/23/12 Y Will update our electrical site location, pad and power to be provided. plan to show this. 014 Grass areas need mower access. ARR C 5/24/12 Y Page 1 Kodiak Island Borough 7/9/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments ensen Yorba Lott, Inc. Issue Date Action Item Nd. By To Issued Required Roger's Comments o15 State owned Dish needs to be removed, Tony to send e -mail AR ii Tony 5/24/12 Y to Woody indicating such. o i 6 UST south of learning center needs removal, replacement ARE A,M,C 3/24/12 Y FO Tank addressed on drawings, tank works, needs to be tracked as separate line item needs notation about cost (division 1) for DEED funding purposes. tracking. 017 New sidewalk to be provided for pedestrian traffic along Egan ARE C, Ii, L. 3/24/12 Y Lighting in this area is covered in Way, sidewalk along parking side, lighting will need update. current design. Will review any City lighting requirements should be reviewed. specific city lighting requirements for this sidewalk. O1 Civil will meet with "Construction Group" and provide C 5/24/12 Y technical memo for utility pole relocations. 019 ADA access at North West corner of doughnut should be ARE C 5/24/1) V reviewed. May be able to avoid need for railings by angling ramp for longer run and less slope. 020 ADA ramp to be added by Auditorium entrance. A C 3/24/12 Y 021 Clearance between rails needs to be shown on civil drawings. ARE C 3/24/12 Y 022 Curb cut is needed by ADA stalls North of doughnut. A C 5/24/12 Y 023 Re -pave of South parking is to be an additive alternate. C C 5/24/12 Y 024 Existing Pool parking area light pole east of Voc Ed needs new ARE I: 5/24/12 Y Appears we can remove this location to allow fire access by new propane tank. pole and maintain desired light levels through fire lane. Building mounted lighting also being added. 025 Two new light poles and single Camera shown by learning li N 5/24/1) Y We will review the poles in this center will be deleted, pole will be added at walkway south of area and update the electrical library. site plan. 026 Utility access to building and quantity of site work over time A C 3/24/12 Y needs to be reviewed related to phasing. O Separate physical cable will be provided for camera system. Ii - 5/24/1 Y Accept Page 2 Kodiak Island Borough 7/9/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments ensen Yorba Lott, Inc. Issue Date Action Item N4. By To Issued Required Roger's Comments 02B Existing Fuel North of Voc Ed should be called out for ARR Ii 5/24/12 Y We will add a note on the relocation as directed by owner. electrical site plan to address this. 029 A stoop is needed at exterior door under exterior stair along A C 3/24/12 Y North gym wall. 030 A Camera will be added to supervise area by transformers & E Ii 5/24/12 Y We will add a camera to cover exterior stairs between voc ed & gym. this area. 031 Tony will distribute the Arctic Elevator refurb proposal. A Tony 5/24/12 1 032 Mezzanine in existing fishery room needs to be shown as ARB A 5/24/12 Y demo. 033 Exterior coiling doors need to be reviewed against MEP for A A,M,L' 5/24/12 v We will review the overhead conflicts when doors are in the open positions. door locations and shift ceiling mounted lights and devices as needed. 034 Drip line in main telecom room needs to be routed, should ARB M 5/24/12 Y can add drip trays. Will review not go over racks routing. 035 Main telecom room needs to be incorporated into phasing 1= A 5/24/12 plans. 036 Lighting scope shown in doughnut corridor needs to be A 13 5/24/12 Y We will remove new lighting in deleted. this corridor. 037 Mat light in gym room needs to be shown. A ti 5/24/12 Y This fixture has been added. 03B Up light will be provided on main entry exterior canopy to A 1: 5/24/12 V PDC to investigate solutions with avoid "cave" effect. DLR 039 Remove hair dryers from locker rooms. Maintain them in ARB A R F 5/24/12 ¥ Remove off architectural and coach shower area, electrical power plans. Page 3 Kodiak Island Borough 7/9/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Item Noensen Yorba Lott, Inc. Issue By To Date Action Roger's Comments Issued Required O Need note for outlets in classrooms to be fed from junction ARB l;. 5/24/12 Y Provide note on drawings at box in ceiling for future flexibility. each outlet on interior partitions (Address likely walls which might change in 5 years) to provide junction box in ceiling to supply wall boxes and to not run conduits horizontally to adjacent partitions. 041 Elevator controller needs to be located. ARB A & F 5/ Y 042 Transformer and room at main level tower need to be ARB fl 5/)4/1/ Y Transformer in Tower to be reviewed for overheating. relocated to Penthouse. Will also be considered in the Area B electrical room. Reviewing heat loss in basement for cooling requirement. 043 Power in dining needs to get moved to wall benches. Ceiling A F 5/24/12 Y Accept outlets need to be provided in dining. 044 Existing conduit in utilidor should be considered for re -use. ARI3 F 5/24/12 - Generator conduit may be reused as one of parallel conduits. 045 Floor finishes are primarily resilient products. Exposed A - 5/24/12 concrete with imported aggregates will be used on ground floor, linoleum most other locations. 046 Electrical should review option for reducing quantity of ARB I' 5/24/1 - meters needed. O47 Specification: Requires solid wire for #10 and smaller. ARB E 23 - May Y Will modify specification to allow Recommend allowing stranded wire for #10 and larger. the #10 wires to be stranded. 048 Specification: Grounding make sure to include requirements ARI3 e 23 Y Include listing of extent of for connecting to gas, water, fuel, etc listed in NEC. grounding systems in accordance with NEC Page 4 Kodiak Island Borough 7/9/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Item Noensen Yorba Lott, Inc. Issue By To Date Action Roger's Comments Issued Required 049 Specifications: Include rigid elbows in for PVC and similar non- ARB I: 23 - May V Expand specification for these metallic conduits. additional special considerations. 050 Exterior Lighting Controls- Need to verify voltage drop on 0- ARB E 23 -May Y Provide voltage drop calculation lOV signals to light fixtures. and possibly larger conductor size. 051 E1.1: Poles with Cameras need to be increased capacity to ARB E 23 -May Y Accept handle camera systems. 052 E1.1: Egan Way angled by drop off area. New sidewalk being ARB E 23 -May Y Accept installed on north side of street. Will require moving poles north towards parking area. Also relocate pole at exit roadway. Page 5