02/28/2012 Regular Meeting Architectural /Engineering Review Board � Regular Meeting-28-29 February 2012 -5:30 PM 1 _ I I JUL 8 2012 I � 1v' KFRC Conference Room BOROUGH CLERK'S OFFICE A. Call to Order Chair Hacker called the meeting to order at 5:30 pm. B. Roll Call Board members present were Gregg Hacker (GH), Scott Bonney (SB), Jerrol Friend (JF), Sonny Vinberg (SV). KIB Staff Present were Woody Koning (WK), Ken Smith (KS), and Jessica Wolfe (JW). Also present were Tony Yorba, Jensen Yorba Lott; Chris Gianotti and Brian Neilson, PND. A QUORUM WAS ESTABLISHED. JF MOVED TO EXCUSE Mike Brechan, Ray Nordgulen and Cliff Ford due to previous commitments. MOTION PASSED UNANIMOUSLY. C. Approval of Agenda JF MOVED TO CHANGE THE AGENDA: Presentation of 65% Design Development Documents before approval of 65% DD. MOTION PASSED UNANIMOUSLY D. Approval of 12/14/11 minutes JF MOVED TO APPROVE THE ABOVE MENTIONED MINUTES MOTION PASSED UNANIMOUSLY E. Tony Yorba KHS Addition & Renovation 65% Design Development Presentation Chair Hacker turned the meeting over to YORBA for presentation and discussion of progress to date. Structural and Architectural design staff were present. 7:55 PM MEETING WAS RECESSED UNTIL FOLLOWING DAY 2/29/2012 F. Roll Call Chair Hacker called the meeting to order 5:06 pm. Board members present were Gregg Hacker (GH), Scott Bonney (SB), Jerrol Friend (JF), Sonny Vinberg (SV), Mike Brcchan (MB), Cliff Ford (CF); KIB Staff Present were Woody Koning (WK), Ken Smith (KS), and Jessica Wolfe (J W). Also present were Tony Yorba, Jensen Yorba Lott; Roger Full, Robert Posma and Paul Kendall, PDC. G. Election of Officers Hacker nominated for Chair. Friend nominated for Vice Chair. VOTE WAS UNANIMOUS H. Tony Yorba continued the 65% Design Development presentation. Civil, Electrical and Mechanical design staff were present. Design issue tracker spreadsheet with ARB comments /concerns attached. I. Approval of 65% Design Development documents SB MOVED TO APPROVE THE 65% DESIGN DEVELOPMENT DOCUMENTS AS NOTED. MOTION PASSED UNANIMOUSLY J. Public Comments None K. Staff Comments WK thanks to Board, Staff and Design team for all their effort. The 80% design review is a great idea. L. Board Member Comments CF thanks Design Team for presentation. M. Adjournment FRIEND MOTIONED FOR AJOURNMENT MOTION PASSED UNANIMOUSLY MEETING AJOURNED AT 9:47 PM Respectfully submitted: arda_ 1 ( Date: / Je sica p olf•, Projects,' sistant 41/ / i- 7 �l t -71 Z Date: S�"5 /Z-d Gregg H c 'ha Architectural76ngineering Review Board Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. Item No. Issue By To Date Action Comments Issued Required 001 verify the code requirements for ARR A 12 13 1 1 1' Will review- we may have to use a perforated screen in guardrails- we may have to omit the the lower portion of the rails. horizontal rails at the running track. 002 Provide for roof deflection at the wall ARB A Y between the gym and weight room. 003 AI213 A Y allow for roof deflection at the running track 004 air rises unchecked through the void ARI3 A Y between the interior CMU wall and outside wall assembly at the gym area. This causes significant heat loss. Wall void should be closed off. 005 AIiB A S design team is still developing reliable images from the wind and solar study has been accomplished "beta" software. using "versari ", an Autodesk software program. Graphic images of the study will be forwarded for review 006 The metal siding and insulation ARR M Y Will adjust load calculations. Ventilation is greatest factor. improvements to the Voc Ed and Single Story Classroom Buildings are alternate bids. If the alt. bid. is not selected, heating load on boilers will increase. Mech should verify. 007 include in specifications to ensure that ARB A Y no longer considering Rhinobond roof attachment membrane and fastener plates are clean system. prior to welding membrane to rhinobond plates. _ 009 Revisit window flashing detailing- ARB A Y sealant as shown on drawings will block flow of moisture through the weeps in the frames. Page 1 Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. Item No. Issue By To Dote Action Comments Issued Required o t o Include additional SSG joints- minimize ARI; A Y the need to rely on metal flashing and fishing sealants o 1 1 Cap interior sides of window sills with ARB A Y extruded aluminum or bent aluminum cap- have cap rovided by window manufacturer. 01 2 ARB A.I' 1' Electrical rooms in the tower are tight at DD level, but believe we are conservative at this point. Will continue to monitor when circuiting begins after DD. Verify sizes of all electrical rooms o t 3 Revise window detail so that sill pan ARR A Y dam rised higher than 1.5 inches to minimize the potential for wind driven rain to blow up past the dam. This relates particularly to window detail 4/A10.2 01 4 ARB advises that vapor barriers be ARB A Y adhered with acoustical sealant. o 1 5 Cap raw ends of all drywall with "L" ARR A Y metal- see detail 2/A10.3 o i 6 Provide sealant and backer rod at ARB A Y window head in line with 1/2" dens glass underlayment, detail 2/A10.3. 01 7 Instead of tapered insulation, consider ARB A Y shaped nailers to connect the underlayment panel below the membrane on detail 2/A10.3 o t a Consider using large steel braces in lieu of ARB S Y concrete shear walls. Page 2 Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. o 9 Granite quarry will be opening in Kodiak ARR A,I. Y soon. Consideration should be given to incorporating granite into the landscape design. Page 3 Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. Item No. Issue By To Date Action Comments Issued Required 020 An addional exterior stair is required in the ARP A,E,:vt,S Y viscinity of the cafeteria in order to have code compliant egress. It is not yet shown on the drawings. 021 ARR F Y Life Cycle cost analysis was completed and forwarded under separate cover. Final mix includes linear fluorescents and LED fixtures. Linear fixtures still provide Design team is still looking at the possible cost advantages when dimming (daylight) or significant use of LED light fixtures. Decision will be light levels (Gym), in lieu of compact fluorescents for made on a life cycle cost basis. longer life. 022 ARB NL,L,C,A Y Mechanical: This has been picked up on DD drawing set. Propane tanks will be placed at the rear of the building, away from the main entry area. Eact location to be determined but likely between the gym and Voc Ed building. Gas supply piping will be routed in areas that are easily accessible for maintenance. 023 JYL was asked to provide a checklist of ARB A Y deliverables for 65% and 95% documents. We will provide a list based on the AIA contract requirements 024 ARR r1 Y Design team will coordinate exterior openings with original documents- it is reported that a number of original openings have been covered over by subsequent renovations, especially at the voc ed and one story classroom building. They may affect how the layouts occur on sheet A1.4. Overhead door openings not shown occur along grid 9 and HH and likely other areas as well. Page 4 Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. Item No. Issue By To Date Action Comments Issued Required 025 It was reported by KEA that service to the ARB B Y The agreed course of action is shown on the DD drawings mental health buildings, Borough Building which includes leaving a portion of the learning center, and other campus buildings is tied to a and refeeding the service transformer and distribution transformer to the south of the eissting equipment, and reconnecting 480V feed to the mental learning center. Removal of the transformer health buildings. will require relocating these feeds. Electrical engineers are to work with KEA to determine the best option for these services. 026 ARTS E Y Fixtures have been selected (full cut -off type) and There is concern about the number of oriented to minimize lighting outside of the site except parking lot lights- a balance will need to be where we are lighting along Egan way in non - residential found between the amount of light leaving area. the site and the number of fitures provided. Page 5 Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. 027 ARB E T We agree that if the NEC calculated service sizes for the facility had to be provided by KEA, the transformers would be significantly undersized. KEA will provide transformers and feeders to match estimated demand load. For instance the existing facilities were both served by 2000A 208Y /120V equipment or equivalent of 1100 MVA of capactiy, but KEA is serving them with two 300 KVA transformers. The actual loading on the transformers has been about 60% of the installed capacity. From current estimated NEC loads, 208Y /120V services would result too large to manage, so 480Y/277V is recommended. With major equipment loads obtained at the end of DD, well be able to assess the loading. A full report will be prepared with possible recommendations to reduce number of services. The advantage of maintaining separate services allows for continued service of existing electrical systems during construction with short outages during non - school sessions. We will continued to monitor the service sizes and will take every opportunity to reduce equipment Design team was asked to justify the sizes. electrical entrances- there is concern that they may be over served. 02B Landscape scheme was not accepted. ARB Preference is to simplify the design to facilitate snow removal from walks and around plant bed areas. It was also requested to simplify parking lot areas so that snow plows are less inclined to strike projecting curbs. Page 6 Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. 029 ARB A,C,L N The greenhouse is to remain if possible. It is an education program component, but has not been included in the cost estimate for demolition and replacement. Page 7 Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. Item No. Issue By To Date Action Comments Issued Required 030 Demolish the existing sidewalk between the ARI3 bourough building and the one story classroom building. 031 ARR L Y Rather than the formal basketball court with foursquare courts, it was suggested to provide several backboards in the courtyared area between the one story classroom building and the tower. 032 The site layout needs to be revisited for ARB .ACI. S waiting for input from school district accessibility for trash dumpsters and dumpster pick -up. 033 ARB C,L 1' Landscape Architects have coordinated tress with DOT. Numerous trees are shown in the new planter bed at the new driveway entrance to the site from Rezanof, as well as planted in the existing planter bed parallel to Rezanof. Site lines from vehicles leaving and entering the driveway are compromised by these trees. They should be removed. DOT should be consulted for landscape limitations along the Rezanof, which is a state right of way. 034 DOT will be consulted for site line ARR C,I, t' Landscape Architects have coordinated tress with DOT. limitations of street trees, particularly as shown on Sheet L4.2 Page 8 Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. Item No. Issue By To Date Action Comments Issued Required 035 ARR A committee is being formed to administer the AIPP process. Artwork will be considered that can be incorporated into the building design. One area of consideration is the possible water feature at the main entry area. Design drawings will not include the water feature until it is determined to be part of the work, and input from the AIPP obtained. 036 ARB A,M N Mechanical: Will adjust load calculations. Ventilation is Design R values used by the design team greatest factor. have increased since it was determined that ground sourced heat pumps are not cost effective on this project. Thermal resistivity goals include: walls R -32, roof R -70. 037 ARR A,S 1" • ARB prefers wall base detail 6/A10.4 rather than the alternate base shown on 4 /A10.1. 0313 Revise cut panel flashing detail, (such as ARB A shown on 2/A10.3, to include a U shaped end fishing and a hemmed flashing w/ continuous clip 039 At det 6/A10.4, consider using continuous ARR A,S Y structural recommends the grouted bars. angles installed against the existing foundation wall as a means of securing the new foundation to the existing foundation wall. 040 Place sealant behind the typical window ARR A Y flashings rather than in front of them (det 2 /A10.4) Page 9 Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. Item No. Issue By To Date Action Comments Issued Required 041 Depth of footing at 6/A10.4 may be 36" Al213 A 1' rather than 48 inches shown. 042 Al213 A l' double glazed is preferable. investigate whether spandrel panels in south facing curtain wall systems should be double glazed rather than triple glazed. There is concern that the triple glazed panels may fail due to heat build -up. 043 Consider installing rigid insulation between Al213 A 1' rigid insulation must have thermal barrier. Batts are the flanges of the perimeter beams (Det simpler to install as should be as effective as rigid. 2/A10.5) rather than the fiberglass batts shown 044 A1313 A 1' At det 4/A10.5, consider perforated steel angles to support the wood panels to facilitate drainage behind the panels. 045 Wood panels are proposed to be Ipe, a ARP A N tropical hardwood. 046 Ensure that mechanical design fully AR R $I l' Will review load calculation. considers heat build upon south side of tower. 047 Use SSG ( Silicone Structural Glazing) to the ARI3 A 1' extent possible. This would include using SSG at detail 4/A10.5 rather than the aluminum cap detail shown. 048 fl'L AR13 N Testing and life cycle cost analysis has determined that ground sourced based heat pump heating system is not cost effective at the scale achievable on this site. Page 10 Kodiak Island Borough 2/29/2012 Kodiak High School Addition and Renovation ARB Schematic Review Comments Jensen Yorba Lott, Inc. 049 Mechanical system will include a boiler JYL ARB N system including 4 boilers. Mechanical engineers are investigating a system using 110 to 120 degree water instead of the normal 180 degree heating medium. Mechanical engineers will report their findings. 050 Existing elevator is operable but in need of In ARK renovation if it is to be used daily for the food service. 051 Use high impact resistant materials for all ARK JYL Y doors. Work with KIBSD staff to select interior and exterior door types 052 ARK JYI. Y Ensure that windows can be cleaned behind exterior x braces. Leave x braces exposed. 053 ARK JYI. Y Confirm the requirement for termination bar at roof to parapet transition. 054 055 055 Page 11