SOUTHEAST ADD BK 2 LT 1A - ZCP 5/25/2012Kodiak Island Borough Print Form Submit by Email
\
Communi Mill De
ayRd. ntDepartment I II
710 Mill Bay Rd. Rm 205
is a Kodiak AK 99615
Ph. (907) 486 - 9362 Fax(907)486 -9396 15611
http://www.kodiakak.us
Zoning Compliance Permit Permit No. CZ2012 -076 (A
6 ZS ) z-
The following information is to be supplied by the Applicant:
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
Don Zimmerman & Carol Hult
PO Box 1157, Kodiak, AK 99615
907.486.4497 907.539.6591
dshaker @gci.net hultcraft @gmail.com
Subdv: Southeast Addition Block: 2 Lot: 1A
1213 Kouskov St.
Description of Proposed Action: New SFR w/ attached Garage & detached accessory bld'q
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access
points, and vehicular parking areas.
Staff Compliance Review: Current Zoning: R1 KIBC 17.75
Lot Area: 14,841
Front Yard: 25 '
Prk'g Plan Rvw? Yes
Plat /Subdivision f
Requirements? l
Does the project involve
an EPA defined facility?
PROP_ID 15611
Bld'g Height: 35'
Side Yard: 5'
+ 11 , of R eq'd Spaces: 3
T VevcY SQtV,aGA[ 4v AT
NO If YES, do you have an EPA Return Receipt of Notification?
"Permit will not be issued until receipt is submitted to KIB"
Lot Width: 60'
Rear Yard: 10'
Subd Case No. Plat No. Bld'g Permit No.
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
Applicant Certification: 1 hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that I
have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
List Other:
Date: May10,2012 Signature: Carol Hult
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
**EXPIRATION. Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBQ per KIBC 17.15.060 A. **
CDD Staff Certification
L
Date: May 10, 2012 CDD Staff: Martin Lydic
Payment Verification
Payable in Cashier's Office Room # 104- Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable r'tl
Less than 1.75 acres:
1.76 to 5.00 acres:
5.01 to 40.00 acres:
40.01 acres or more:
FX $30.00
r $ 60.00
F $90.00
F $ 120.00
F $0.00
F $ 60.00
F $ 120.00
F $ 180.00
F $ 240.00
e ���� aarnw�. wrerP ,ei =mro�a..vza.�.�,�.�aimueiuw w�aia�,.eo�oo<noiz a,_cop.
Q
\
L
\
a � �
\ �
k
v T op
Pains <
a m '�� "° o - ?I�,TAERMANHULTRESIDENCE S a m
N4 „ ° a DON ZIMMERMAN & CAROL HUJ
a Y KouAav Street - O
KWi 4AIWIm -Y
O