2005-01-10 Special MeetingKodiak Island Borough
January 10, 2005 - 12:00 p.m. (Noon)
Mr. Jerome Selby
Borough Mayor
Term Expires 2007
Mr. Tom Abell
Assemblymember
Term Expires 2005
Mr. Mike Anderson
Assemblymember
Term Expires 2006
Mr. Tuck Bonney
Deputy Presiding Officer
Assemblymember
Term Expires 2005
Ms. Pat Branson
Assemblymember
Term Expires 2007
Mr. Cecil Bonney
Assemblymember
Term Expires 2006
Ms. Nancy Wells
Assemblymember
Term Expires 2005
Ms. Barbara Williams
Assemblymember
Term Expires 2007
Ms. Nancy Galstad
Interim Borough
Manager
Ms. Judi. Nielsen, CMC
Borough Clerk
1. ROLL CALL
2. CITIZENS' COMMENTS - Limited to three minutes per speaker.
3. CONSIDERATION OF MATTERS IN THE CALL FOR THE SPECIAL MEETING
A. EXECUTIVE SESSION
Dawn Black d /b /a Erdman Rentals, LLC vs. KIB Litigation.
B. Contract No. 2005 -01 Sole Source Contract for Reconstruction and
Operation of the Community Swimming Pool.
4. ADJOURNMENT
Assembly Agenda
Special Meeting Borough Conference Room
This special meeting was called by Mayor Selby.
Kodiak Island Borough Assembly Agenda
January 10, 2005 Page 1
Kodiak Island Borough
AGENDA STATEMENT
Special Meeting of: January 10, 2005
ITEM NO. 3.B
Contract No. 2005- 01
Sole Source Contract for Reconstruction and Operation of
the Community Swimming Pool.
Kodiak Island Borough Code 3.16.020 "Limitation on Manager'8 Authority" states that a
contract exceeding $25,000 requires Assembly approval. This contract is a sole source
award for labor and equipment associated with the demolition of existing pool filters and
miscellaneous pipes, valves, controllers etc. as well as the installation of new pool filters,
piping, valves etc. to get the community's pool back in operation.
The Assembly has already approved purchase of new pumps, media, chemical controller
etc. This contract would provide the labor and equipment needed to remove the old items
in preparation for delivery of the new filters in late January/early February. There is
significant preparation work identified. By performing the work now, we will be ready to
react when the new pool filters arrive in town. KIBSD maintenance staff will also perform
some work to the mechanical room once the failed filters are removed.
Staff is recommending a sole source contract with Tundra Plumbing and Heating for a
number of reasons. We have a good working experience with Tundra Plumbing and they
have a good reputation in performing this type of work. Getting the pool back in operating
condition is an overriding need. Tundra has a working history with the company providing
the filters. It is expected that Tundra Plumbing can provide some of the filter operational
training needs of pool staff that was identified in the proposal for new filter purchase by
W.M. Smith and Associates. That contract can be reduced in scope.
Staff is recommending a time and materials contract with Tundra Plumbing in an amount
not to exceed $40,000 to perform the above work. This means that we will only pay for the
work performed by Tundra Plumbing on an actual per hour basis and based on a cost of
materials basis plus overhead. But the overall contract will not exceed $40,000.
FISCAL NOTES ACCOUNT NO. 430 - 545 - 452 -160
[D] N/A
Expenditure $40,000 Amount
Required $
Budgeted
RECOMMENDED MOTION: Move to award Contract No. 2005 -01 to Tundra ' • bing
and Heating, Inc. of Kodiak, Alaska for time and materials in an amount not to exceed
$40,000.
12/09/2004 15:28 9074871955
December 9, 2004
Kodiak Island Borough
Atten: Bud Cassidy
TUNDRA PLUMBING /HTGw
TUNDRA PLUMBING & HEATING, INC
859 Panamarofl Creek Dr
Kodiak Alaska 99615
907-487-1991 Ph
907-487-1955 Fx
tundra1egc %net
'Per Deans review of the swimming pool project, we have come up with
a brief scope of work and a quote. Please note this is only for
budgetary purposes and not a firm quote, due to the fact that Bob is
out of town and could not estimate this project.
Per attached scope of work, we will add pipe and fittings for all owner
supplied equipment that we will be hooking up, demo as directed, haul
demo materials to KIB landfill.
Estimated Quote: FOURTY THOUSAND DOLLARS AND 00 /00
Note: This scope of work does not include WM Smith quote.
PAGE 02
Status
Date
KIBSD Maint task
Done
12/6/04
Get quote for equipment
Done
12/8/04
Provide plans to DEC for review /approval
Done
12/9/04
Get plans approved by DEC
Deep clean pool/deck
Inspect deck/grates /sikaflex
Repair deck/grates /sikaflex as required
Remove old acid barrels
Clean -up loose items in mech room
Clear pool deck (dive end)
Demo old Chemtrol
Re- attach electrical to sump pumps
Seal Sump pump enclosure (top conduit fittings leak)
Install new coils in sump pump controller
Clean and paint walls and floor
?? ?Tanks and new pump arrive ? ??
Remove doors and handrails to pool mech room
Install new Chemtrol
Maint hook up elec to new pump and Chemtrol
Install and fill new Acid barrels
Fill pool to 60%
Calibrate Chemtrol
Fill pool to 100%
Bring pool water /air temps /water chemistry to spec
Clean pool mech room
Final touch -up cleaning of pool deck (Dive end)
?? ?Pool chem/temps /water chemistry up to spec ? ??
Provide sample to City of Kodiak for testing
DEC inspection
DEC Approval to operate
Pool re- opening
Touch -up paint on mech floor
ac /22 t k /Bi
Status
Date
Contractor task
Remove old and re -pipe heat circ pump to provide 36'4 access to mech room
Make a settling basin in alley to prevent sand from going down drain
Pump sand out of sand tanks to alley
Repair sump pump discharge piping
Demo sand tank pipe (keep scrap in old chem storage room until job is completed)
Demo sand tank and remove scrap (KIB landfill)
Demo existing pump pad
?? ?Tanks and new pump arrive ? ??
Move filter media to old chem room
Move tanks to pool mech and locate as per drawing
Install new pump pad
Install new pump /strainer
Install new Chemtrol
Install sand tanks - connect all piping (backflush/pump /strainer /Chemtrol flow
cell /flow meter /flow switch/pressure gauges /sample line /tank vents and drains) Install
pipe hangers and secure tanks to floor.
Test system for proper operation - correct if required
Remove scrap pipe in old chem storage room (KIB landfill)
ScQ/t e 7 64;44 - ✓pia /J/f.)- h.✓
TO: Assembly Members and Staff
FROM: Walt Mason and Matt Jamin
DATE: January 10, 2005
RE: Erdman Appeal, 4702 -855
Memorandum
The decision was distributed on December 13, 2004. Under Appellate Rule 204(a)(1), the
notice of appeal must be filed within 30 days from the date shown on the clerk's certificate of
distribution, which means that the appeal would have to be filed by January 12. We are not
recommending an appeal. Whatever standard the supreme court says it uses in such cases, it in fact
confers a great deal of discretion on a superior court ruling. Judge Bolger's decision is well
reasoned, and we believe would withstand an appellate challenge.
Assuming no appeal is to be taken, Judge Bolger remanded the case to the Board of
Adjustment for further proceedings consistent with his opinion. His opinion finds that a landowner
may make ordinary repairs to a structure that contains a nonconforming use and that Ms. Black's
removal of the porch does not necessarily extinguish her right to rebuild it. Thus, under Judge
Bolger's opinion, the porch may be replaced if it is an "ordinary repair" as defined in the Borough
Code. It is that issue that has been remanded for further consideration.
The Board of Adjustment is strictly an appellate body under KIBC 17.100.020. It would
therefore be appropriate for it to remand the matter to the Planning and Zoning Commission for an
initial determination of whether Ms. Black's replacement of the arctic entry is an "ordinary repair."
The Commission, likewise, is entitled to seek staff input on that question if it so desires.
We believe that a thorough review of section 17.36 of the Borough Code may help to
eliminate some of the concerns that were present in the Erdman matter. We believe the important
policy choices that are implicit in any decisions about non - conforming uses can be made clearer than
they are in the current code. We understand staff are currently working up some recommendations
in this regard, and would be pleased to work with staff on the project if requested.
Please let us know if there is any further information that we can provide.
Kodiak Island Borough
January 10, 2005 During Work Session (Noon)
1. ROLL CALL
Assembly Guidelines
Special Meeting Borough Conference Room
Clerk's note: Assemblymembers Branson may be out and asked to be excused.
Recommended motion: Move to specifically excuse any Assemblymembers that are
absent.
VOICE VOTE ON MOTION
2. CITIZENS' COMMENTS - Limited to three minutes per speaker.
3. CONSIDERATION OF MATTERS FOR THE SPECIAL MEETING
A. EXECUTIVE SESSION
1. Dawn Black d /b /a Erdman Rentals, LLC vs. MB Litigation.
Recommended motion: Move to convene into executive session to discuss
Dawn Black d /b /a Erdman Rentals, LLC vs. KIB Litigation, a matter that
qualifies for executive session under confidential attorney- client
communications.
ROLL CALL VOTE ON MOT /ON
Please invite the Manager and the Clerk's Office staff to join you in executive
session.
(Upon returning from the executive session, Mayor Selby reconvenes the
special meeting and announces there is no action to be taken as a result of the
executive session.)
B. Contract No. 2005 -01 Sole Source Contract for Reconstruction and Operation of
the Community Swimming Pool.
Recommended motion: Move to award Contract No. 2005 -01 to Tundra
Plumbing and Heating, Inc. Of Kodiak, Alaska for time and materials in an
amount not to exceed $40,000.
Kodiak Island Borough Assembly Guidelines
January 10, 2005 Page 1
Staff report - Manager.
Assembly discussion.
ROLL CALL VOTE ON MOT /ON
3. ADJOURNMENT
Recommended motion: Move to adjourn the special meeting.
ROLL CALL VOTE
Kodiak Island Borough Assembly Guidelines
January 10, 2005 Page 2
a TOTAL
II Ms. Williams I
Ms. Wells 1
I Mr. Ranney
Ms. Branson
Mr. Bonney
I Mr. Anderson
Mr. Abell
tb
0 i
0
a
Z
TOTAL I
Ms. Williams
Ms. Wells
Ms. Branson
Mr. Bonney
Mr. Anderson
Mr. Abell
up rb
0
0
`
Z
TOTAL
Ms. Williams
Ms. Wells
Mr. Ramey
Ms. Branson
Mr. Bonney
Mr. Anderson
Mr. Abell
CA
o
N t
0
Ott Z y
0
Z
TOTAL
Ms. Williams
Ms. Wells
Mr. Ranney /j :/o,
Ms. Branson
Mr. Bonney
Mr. Anderson Ak
Mr. Abell
ro
n `<
0
A" T
w
6
IVi
z
TOTAL
Ms. Williams I
Ms. Wells
Mr. Ramey
Ms. Branson
Mr. Bonney 7�
Mr. Anderson
Mr. Abell
C W
8 `...
0
z
0 DD
o '
ci
Ett
cri g.
0
0
0
0
0
go
0
0
0
t