1987-05 Amending Contract Arctic Engineers, Inc.A RESOLUTION OF THE KODIAK ISLAND BOROUGH APPROVING AN INCREASE
AMENDING CONTRACT NO. 135 WITH ARCTIC ENGINEERS, INC.
WHEREAS, the Kodiak Island Borough Assembly has directed changes
not covered in the original scope of services of this contract to be added
to the scope of services of this contract due to the relocation of the
facility from Smokies to the Landfill location, and
WHEREAS, Department of Environmental Conservation has changed soma
of the conditions of the Landfill Closeout requirements, and
WHEREAS, Arctic Engineers, Inc. caused delay in the Bucon
construction contract, and
WHEREAS, the cost of the above changes have been evaluated as
follows;
1. Printing and site inspection not
included in original contract
Baler $ 16,300.00
Landfill Closeout 16,060.00
2. Rs-design due to DEC permit
changed conditions 10,000.00
3. Waterline Design 8,700.00
4. Landfill site design 20,000.00
5. Soils and survey work 2,068.00
6. Changes to Baler Building 13,630.00
7. Cost of Acceleration of Bucon (10.313.00)
caused by slow review of shop
drawings by Arctic Engineers, Inc.
RESOLUTION NO. 87 -05 -R
Page 1 of 2
KODIAK ISLAND BOROUGH
RESOLUTION NO. 87 -05 -R
$ 76.445.00
ATTEST:
By .-Lv A t iu%
Borough9rk
NOW, THEREFORE, BE IT RESOLVED by the Kodiak Island Borough that
the Mayor be instructed to execute the amendment to Arctic Engineers, Inc.
in the amount of $76,445.00.
1987.
PASSED AND APPROVED this 6 day of January
RESOLUTION NO. 87 -05 -R
Page 2 of 2
KODIAK IS?'.ND BOROUGH
By
A . C Yl ia 1
Bar Mayor
By
Pr sid9ng Officer