Loading...
1987-05 Amending Contract Arctic Engineers, Inc.A RESOLUTION OF THE KODIAK ISLAND BOROUGH APPROVING AN INCREASE AMENDING CONTRACT NO. 135 WITH ARCTIC ENGINEERS, INC. WHEREAS, the Kodiak Island Borough Assembly has directed changes not covered in the original scope of services of this contract to be added to the scope of services of this contract due to the relocation of the facility from Smokies to the Landfill location, and WHEREAS, Department of Environmental Conservation has changed soma of the conditions of the Landfill Closeout requirements, and WHEREAS, Arctic Engineers, Inc. caused delay in the Bucon construction contract, and WHEREAS, the cost of the above changes have been evaluated as follows; 1. Printing and site inspection not included in original contract Baler $ 16,300.00 Landfill Closeout 16,060.00 2. Rs-design due to DEC permit changed conditions 10,000.00 3. Waterline Design 8,700.00 4. Landfill site design 20,000.00 5. Soils and survey work 2,068.00 6. Changes to Baler Building 13,630.00 7. Cost of Acceleration of Bucon (10.313.00) caused by slow review of shop drawings by Arctic Engineers, Inc. RESOLUTION NO. 87 -05 -R Page 1 of 2 KODIAK ISLAND BOROUGH RESOLUTION NO. 87 -05 -R $ 76.445.00 ATTEST: By .-Lv A t iu% Borough9rk NOW, THEREFORE, BE IT RESOLVED by the Kodiak Island Borough that the Mayor be instructed to execute the amendment to Arctic Engineers, Inc. in the amount of $76,445.00. 1987. PASSED AND APPROVED this 6 day of January RESOLUTION NO. 87 -05 -R Page 2 of 2 KODIAK IS?'.ND BOROUGH By A . C Yl ia 1 Bar Mayor By Pr sid9ng Officer