Loading...
12/30/2008 Special MeetingFIRE PROTECTION AREA NO.1 BOARD SPECIAL MEETING DECEMBER 30, 2008 @ 7:30 p.m. BAYSIDE FIRE HALL CALL TO ORDER CHAIR DOLPH, called the meeting to order at 7:31 p.m. ROLL CALL ., r ~_ r, is Members present were C. Davidson, M. Dolph, R. Nelson, J. Pickett and D. Canavan. A quorum was established. Also present were Chief Himes and M. Barber, recording Secretary, Kodiak Island Borough. APPROVAL OF AGENDA It was MOVED, R. Nelson and seconded to approve the Agenda. Motion Carried by a unanimous voice vote. VISITOR COMMENT None BUSINESS ITEMS a. Architectural Designs -Review & Recommendation to ARB Chair Dolph told the Board that Borough staff did a stellar job getting the drawings ready for the meeting. The Borough received the drawings electronically at 5:45pm that evening, K. Smith and M. Barber worked hard at making copies for the Board. Chair Dolph told the Board what they had before them were the 95% drawings. He said the intent of the review is to forward any comments to the ARB at their regular meeting January 6`h, 7pm at KFRC Large Conference Room. It was Moved, C. Davidson and seconded to approve recommendations and forward to the ARB. See Attached Board Action Memo to the ARB. VISITOR COMMENT None BOARD MEMBER COMMENT D. Canavan -None R. Nelson -None J. Pickett told the Board he hoped everyone had a great Christmas. Big thank you to M. Barber and the people at the Borough for getting the 95% drawings to the Board and hope they keep pushing forward and keep it going and hopefully they can get some work done this next year. He also wished everyone a Happy New Year. He told the Board he will be out of town February 3 through February 20, 2009. C. Davidson said that he would agree with what J. Pickett said and he asked that the Board get a reminder of the ARB meeting on Tuesday by email. He thanked M. Barber for doing an excellent job of keeping track of the changes the Board suggested for the drawings. Chair Dolph echoed the season's sentiments of best wishes for a New Year to everyone and also reiterate thanks to K. Smith and M. Barber for getting the drawings to them on really short notice. He hoped that once the huge ball was moving they could keep it going and get on with life. MEETING SCHEDULE -Consideration of Work Session Schedule for Jan-09 Chair Dolph told the Board their next regular scheduled meeting falls on the same date as the ARB's meeting and he felt the Board needed representation at that meeting. He asked the Board what they thought about going to the ARB meeting and postponing or cancelling their work session. It was Moved, R. Nelson and seconded to combine the work session and regular meeting scheduled for January 20, 2009. Discussion followed re: preplanning for the strategic plan effort, facility, capability and support to the community. Motion Carried by a unanimous voice vote. ADJOURNMENT Meeting adjourned at 9:SSp.m. SUBMITTED BY: •~ Mary J. B e KIB Engi /Facilities Department APPROVED BY: Mike Dolph, hair Fire Protection Area No. 1 Board Date: ~ °-( a~ Date: ! 7- ~~ -D `J Memo ro: Architectural Review Board from: Mike Dolph, Board Chair ~~'' cc: oats: December 30, 2008 Re: Board action on Bayside Fire Station Addition 95% Drawings This memo is to advise you that -during business at a special meeting of Fire Protection Area No. 1 Board held on Tuesday, December 30, 2008: • A MOTION was made by Board Member Cliff Davidson to forward the following recommendations and/or questions to the Architectural Review Board at their meeting scheduled for Tuesday, January 6, 2008. There was a second to the motion, and opportunity for discussion. • Action was taken on the motion by a unanimous voice vote of the board; the MOTION PASSED. A201-1ST Floor Plan • Oil & Water Separator South side of building -eliminate. • ST2B Pass through Doors on North side of building -eliminate. A202 - Meaanine Floor Plan • Window in office is on West wall - originally on North. Okay to leave on W wall, but needs to be eliminated from A301 Exterior Elevations drawing. A301 -Exterior Elevations • Eliminate Window from Office -see above. • Would like canopies over main doors on East & West elevations. A501 -Interior Elevation & Wall Section • Eliminate Pass through Door 1 C102 -Storm Drain & Sewer Plan • What the logic and/or need for the Storm Drain Catch Basin on the East side of the Building? M101 -Mechanical Site Plan & Details • Fuel Tank -Supply Modification (Eliminate the line running to the existing Service District bldg. Install new fuel tank at S.D. Building and run existing fire station and new apparatus addition off the existing big tank.) M201 -Under Floor Plumbing Plan • SI-1 Sand Interceptor (Explain?) M301 -Heating Plan • Would like Radiator in the Tum Out Room #104 • Would like Heater in Toilet #103 M401 -Ventilation Plan (#2 Garage & Mezzanine) • Are South Side Louvre Fans tied into the Carbon Monoxide System? • Hydrogen Sulfide Detection for Diesel? M601 -Mechanical Details (#1) • Is the Heat Recovery Ventilator necessary with an opening window? What's the advantage? E002 -Panel Schedule and Electrical Detail • Need to consider the Global Reconfiguration of Telecommunications for the entire complex. E202 -Mezzanine Lighting Plan • How Many Emergency Lights are Necessary? (21) E302 -Mezzanine Power & Signal Plan • Special Purpose Outlets -Need 10 total...5 Across Front Bays & 5 Across Rear Bays with them being 20 AMP instead of 5 AMP. [Plan presently reflects 4 outlets across the front of the apparatus bay - 5amp each]. (Need Smoke Detectors in Occupiable Spaces and Heat Detectors In Garage & Mechanical Areas) • Page 2