Loading...
2003-06-06 Minutes• ' SCANNED , DateClign: f`v:~ Minutes for the Mission Lake Tide gate Board 6-6-03 Chairman Norman Sutliff called the meeting to order at 4 pm, Friday in'tht--- Borough conference room. Present were secretary Marian Johnson and Chief of Engineering Bud Cassidy. Bill Hinkle was absent. Norman asked where are. we on the' project of installing the tide gate on Mission Lake? 1. Need an easement 2. Hori~n Surveying is working on the project. They are done with the surveying work, , nd the drafting of the survey is about 60% completed. 3. Mr. Campbell, the en~ineer, will create the preliminary plan after the surveying work is complete. i Norman reviewed the Board's minutes for the past year. He wants an easement from Dr. Bob Johnson for placement of the tide gate. He had a survey done by Horizon, and~felt he should be paid by the Borough. He said he has paid repairs on the tide gate for 30 years. He said the KIB has been doing a good job of keeping the tide gate clean. He reviewed Mr. Campbell's correspondence, and after Bud sent a contract to the engineer the project slowed, as more information was needed. Bud reviewed Marian's minutes and letters saved. Bud viewed the Mission Lake photographs of before and after the earthquake/tsunami of 3-27-64. Bud would like to scan the pictures for his files. • i Hated a rivate lake b Norman voiced his concerns of Mission Lake being des g p y Kodiak Island chairman Mr. Jensen, and the finances of repairing the tide gate falls on the owners of property around the lake. The meeting will be continued. ~~~o~~ ~ NOV 1 5 7A04 L BOROUGH CLERK'S OFFICE •