91-046 Brechan Enterprises Sheratin Road ConstructionKODIAK ISLAND BOROUGH FIELD CHANGE ORDER un 9 contractor: BRECHAN ENTERPRISES INC. Contract No. (91—naC Address: 2705 Mill Bay Road Date: (1r+ 1701989 City/State/zip: Kodiak AK 99615 RE: Sharatin Road & Carroll Way Road Water & Sewer Prn3act Gentlemen: This Change Order, when executed by the parties to the Contract, shall constitute an amendment of the referenced Contract. Except as provided herein, all terms and conditions of the Contract remain unchanged and in full force and effect. Payment provided for in this Change Order set forth herein, if any, are full and complete compensation to the Contractor for the change(s) to the work, deleted work, modified work, direct or indirect impact on the Contractor's schedule, and for any equitable adjustment to which the Contractor may be entitled, pursuant to the Contract between the Owner and Contractor or any other basis whatsoever. Contract Item Estimated Revision in Contract Quantities Number Description (-) Decrease (+) Increase 1.06 6" Minus Rock Fill 4,461 c.y. +$4,461.00) 1.14 Borrow, Type B 2,378 c.y. +$28,536.00) The bove additional quantities in reases the contra :t value from $7 6,107.00 to $789,104.00 The idditional fill & Borrow is du to there being m re overburden thin was originally estimated an as a result more fill & borrow wa3 required to replace the wast d organic soils. This Change Order is approved with the understanding that: (1) the total contract price may decrease or increase by the actual quantity of materials deleted or installed as requested above and as paid for at extablished unit contract prices, (2) no additional cost except as described in (1) will be borne by the Owner due to these revisions. Actual net decrease or increase in the total contract price wilt .b,�e l�reflected in the monthly and/or final pay estimates to the Contractor, (3) the contract time is not changed. c�/r APPROVED: KODIAK ISLAND BOROUGH APPROVED: CONTRACTOR: �V-EN �NT�7r�'/?JS�� C, _..-J DATE: 10 119 ' 4 Z. BY: PREPARED BY: KIS E: KODIAi ISLA OR UGH ASSEMBLY KODIAK ISLAND BOROUGH $ FIELD CHANGE ORDER NO. Contractor: Brechan Enterprises Inc. contract No.C91-046 Address: 2705 Mill Bay Road Date: Oct 17. 1992 City/State/Zip: Kodiak AK 9961 RE: Sharatin Road & Carroll Way Road Water & Sewer Project Gentlemen: This Change order, when executed by the parties to the Contract, shall constitute an amendment of the referenced Contract. Except as provided herein, aLL terms and conditions of the Contract remain unchanged and in full force and effect. Payment provided for in this Change Order set forth herein, if any, are full and complete compensation to the Contractor for the change(s) to the work, deleted work, modified work, direct or indirect impact on the Contractor's schedule, and for any equitable adjustment to which the Contractor may be entitled, pursuant to the Contract between the Owner and Contractor or any other basis whatsoever. Contract Item Estimated Revision in Contract Quantities Number Description (-) Decrease (+) Increase 1.10 Beam Type Guardrail 5 LF This adjustment is to document the actual guardraiL length of 225 LF instead of the 220 LF Plan Estimate which is he result of the actual guard rail panel lengthE. This increases the contract amount by $225 for a total contract adjusted cost of $756,107 This is also to document the relocation of the gua drail on Sharati R ad at Sta. 33+10 - 34+10 rig tside to leftside from 34+70 - 3 +70. This was done because of the concern of lot 8, USS 3101 owner's fear of vehicles failing to negotiate th turn on to S aratin from Spruce Cape Road and due to the fa(t that Lot 7 has been filled in. This Change Order is approved with the understanding that: (1) the total contract price may decrease or increase by the actual quantity of materials deleted or installed as requested above and as paid for at extabLished unit contract prices, (2) no additional cost except as described in (1) wi LL be borne by the Owner due to these revisions. Actual net decrease or increase in the totaL contract price wiLL be reflected in the monthly and/or final pay estimates to the Contractor, (3) the contract time is not changed. APPROVED: KODIAK ISLAND BOROUGH DATE: I1=_>1 1�1 J f Z. PREPARED BY: KIB APPROVED: CONTRACTOR:BY��N_ `t4�NitEAY/'��.CS�S 4rNC-• BY. s v D E : 'D -ZIP ^� � KODIAK ISLAND BOROUGH CQNTRArT CHANGE ORDER BOX 1246 KODIAK, ALASKA 99615 Contract No. _ Change Order No. 7 Project Name, Number & Location Amount of Contract & Change Orders Original Contract Previous Changes Contractor This Change " Adjusted Contract Description of Change Cost lu U;; Ui 7 _._3.. k r.-_ __+�U ._., _..,.. .i e:.1 L .. �..Ic . The time provided for completion of the contract is (unchanged) iiircrean dffdetita?M by calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply thereto Accepted By:-r— Date �= Co ntraetor'rRepresentative Recommended: r�,_-` �� 1_� Date V �} Facilitylcobrdinator I Approved By:. Date ": .. r Contracting .Dff icer Copies: Original to Facility Coordinator Canary to Contractor Pink to Project Inspector KODIAK ISLAND BOROUGH t CONTRACT CHANGE ORDER 710 MILL BAY ROAD KODIAK, ALASKA 99615 Contract No. - - - `-- ' - Change Order No Project Name, Number & Location Amount of Contract & Change Orders Original Contract ;, ` •, 4 f r t - - Previous Changes -J Contractor This Change Adjusted Contract Description of Change Cost 1 The time provided for completion of the contract is (unchanged) (fALtYWw-d fV'PVV9WfiY ;; calendar days. This document shall become an amendment to the contract and all provisions of the contract will apply thereto w- Accepted By: Date i Contractor's Representative ,1 Recommended: -" '` Dat _ -� Facility C o �d inaltor' i Approved a—_,.�_� I 'A�--�. Date on ractiR ff er - Copies: Original to Facility Coordinator Canary to Contractor Pink to Project Inspector KODIAK ISLAND BOROUGH ! CONTRACT CHANGE ORDER 710 MILL BAY ROAD KODIAK, ALASKA 99615 Contract No.: ` Change Order No Project Name, Number & Location Amount of Contract & Change Orders Original Contract -- - Previous Changes Contractor This Change Adjusted Contract _ - - Description of Change Cost al, Y L � The time for completion of the contract is (unchanged) fby calendar days This document shall provided become an amendment to the contract and all provisions of the contiac J wdl`a/Stifyf'flf o Accepted By: - Date ' - Contractor's Representative Recommended:y t >' 1 Date Facility C dmator Approved By: Date Contracting Officer Copies: Original to Facility Coordinator Canary to Contractor Pink to Project Inspector ISLAND BOROUGH COI*TRh�;T CHANGE ORDER KODIAK 710 MILL BAY ROAD KODIAK, ALASKA 99615 Contract No. - _—re Change Order No _ Project Name, Number & Location Amount of Contract & Change Orders Original Contract - Previous Changes Contractor This Change Adjusted Contract - - Description of Change Cost 3 The time provided for completion of the contract is (unchanged/ y calendar days. This document shall become an amendment to the contract and all provisions of the cbnirdsi wilYapply tWiiieto Accepted By: .. .� .. _.._.. Date - Contractor's Reprefentative Recommended: Date Facility Coordinator Approved By: 4.", �. Date ... - Contracting officer Copies: Original to Facility Coordinator Canary to Contractor Pink to Project Inspector KODIAK ISLAND BOROUGH I -. CONTRACT E-HANGE ORDER 710 MILL BAY ROAD KODIAK, ALASKA 99615 Contract No. Change Order No Project Name, Number & Location Amount of Contract & Change Orders Original Contract .. _.. .-� _ _ '.—.. ;... ._. _........ .,:...: .. .:. :. ...... :: . .. .. .. - Previous Changes Contractor This Change Adjusted Contract _ Description of Change Cost W The time provided for completion of the contract is jpn f erp.0) (increased) fdec�e;� W by calendar days. This document shall , become an amendment to the contract and all provisions of the contract will apply thereto Accepted By: Date Contractor's Representative Recommended: Date . Facility Coordinator Approved By: Date Contracting Officer _ Copies: Original to Facility Coordinator Canary to Contractor Pink to Project Inspector i AGREEMENT y THIS AGREEMENT made this 2ND day of JANUARY 19 92 by KODIAK ISLAND BOROUGH herein called the Owner, and BRECHAN ENTERPRISES INC. hereinafter called the Contractor. ARTICLE I. SCOPE OF WORK. The Contractor shalt perform, within the time stipulated the Contract as herein defined, of which this agreement is a component part, and everything required to be performed and shall provide and furnish any and ail utility and transportation services necessary to perform the contract and complete in a workmanlike manner all of the CONSTRUCTION work covered by the contract in connection with the Owner's SHARATIN ROAD — CARROLL SEWER WATER Project in strict conformity with the plans and specifications, including any and all Addenda issued by the Owner, with the other contract documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and the contract performed and completed subject to the approval of the Owner or its authorized represen• tative. ARTICLE II. LUMP SUM PRICES. The Owner shall pay to the Contractor as full consideration for the performance of the contract, an amount equal to the Lump Sum amounts as set forth in the bid. ARTICLE Ill. UNIT PRICES. The Owner shall pay to the Contractor as full consideration for the performance of the contract, an amount computed upon the basis of the quantity of work actually performed at the unit prices as set forth in the bid. It is understood that the quantities stated are approximate only and are subject to either increase or decrease, and should the quantities of any of the items of work be increased, the contractor shall perform the additional work at the unit prices set forth in the bid and should the quantities be decreased, payment will be made on actuai quantities insmiled at the unit prices set forth in the bid and the Contractor will make no claim for anticipated profits for any increase or decrease in the quantities. Actual quantities will be determined upon completion of the work. ARTICLE IV. COMPONENT PARTS OF THIS CONTRACT. The Contract entered into by the acceptance of the Contractor's bid and the signing of this agreement consists of the following documents all of which are component parts of said Contract and as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached. 1. This Agreement 2. Change Orders 3. Addenda No. 1 s 2 4. Supplementary Conditions 5. Specifications (Division 1 through 16 of Project Manual) 6. Contract Drawings 00211.1 7. General Conditions 8. Standard Specifir' --insIncorporatedby Reference 9. Information for bwders'• 3 , n 10. Advertisement for Bids 11. Bid Form 12. Performance and Payment Bond 13. Notice of Award 14. Notice to Proceed In the event of any conflict or inconsistency between any of the foregoing documents, the conflict or inconsistency shall be resolved upon the basis of the numerical order. The document or documents assigned the small number or numbers being controlling over any document having a larger number in the numerical order set forth above. Provided, however, although the supplemental condi- tions incorporates standard specifications by reference, in case of conflict or inconsistency, these standard specifications have a numerical order as shown above. IN WITNESS WHEREOF,three identical counterparts of this Agreement, each of which shall for all purposes be deemed an original thereof, have been duly executed by the parties hereinabove named, on this day and year first above written. RODIAK ISLAND BOROUGH OWNER Corporate Seal: ATTEST: Title By: -2 ,/[2anur, CL • x Title BRECHAN ENTERPRISES, INC. CO OR By: Michael C. Brechan President Title WITNESS, if individual or partnership By: 00211.2 DIRECTOR Corporate Seal: ATTEST (If Corporation) By: 4j'19"" William E. Oliver Secretary/Treasure Title