91-046 Brechan Enterprises Sheratin Road ConstructionKODIAK ISLAND BOROUGH
FIELD CHANGE ORDER un 9
contractor: BRECHAN ENTERPRISES INC. Contract No. (91—naC
Address: 2705 Mill Bay Road Date: (1r+ 1701989
City/State/zip: Kodiak AK 99615
RE: Sharatin Road & Carroll Way Road Water & Sewer Prn3act
Gentlemen:
This Change Order, when executed by the parties to the Contract, shall constitute an amendment of the referenced
Contract. Except as provided herein, all terms and conditions of the Contract remain unchanged and in full force and
effect. Payment provided for in this Change Order set forth herein, if any, are full and complete compensation to the
Contractor for the change(s) to the work, deleted work, modified work, direct or indirect impact on the Contractor's
schedule, and for any equitable adjustment to which the Contractor may be entitled, pursuant to the Contract between
the Owner and Contractor or any other basis whatsoever.
Contract Item
Estimated Revision in Contract Quantities
Number
Description
(-) Decrease
(+) Increase
1.06
6" Minus Rock Fill
4,461 c.y.
+$4,461.00)
1.14
Borrow, Type B
2,378 c.y.
+$28,536.00)
The
bove additional quantities in
reases the contra
:t value from
$7
6,107.00 to $789,104.00
The
idditional fill & Borrow is du
to there being m
re overburden
thin
was originally estimated an
as a result more
fill & borrow
wa3
required to replace the wast
d organic soils.
This Change Order is approved with the understanding that: (1) the total contract price may decrease or increase by the
actual quantity of materials deleted or installed as requested above and as paid for at extablished unit contract prices,
(2) no additional cost except as described in (1) will be borne by the Owner due to these revisions. Actual net decrease
or increase in the total contract price wilt .b,�e l�reflected in the monthly and/or final pay estimates to the Contractor,
(3) the contract time is not changed. c�/r
APPROVED: KODIAK ISLAND BOROUGH APPROVED:
CONTRACTOR: �V-EN �NT�7r�'/?JS�� C,
_..-J
DATE: 10 119 ' 4 Z. BY:
PREPARED BY: KIS E:
KODIAi ISLA OR UGH ASSEMBLY
KODIAK ISLAND BOROUGH $
FIELD CHANGE ORDER NO.
Contractor: Brechan Enterprises Inc. contract No.C91-046
Address: 2705 Mill Bay Road Date: Oct 17. 1992
City/State/Zip: Kodiak AK 9961
RE: Sharatin Road & Carroll Way Road Water & Sewer Project
Gentlemen:
This Change order, when executed by the parties to the Contract, shall constitute an amendment of the referenced
Contract. Except as provided herein, aLL terms and conditions of the Contract remain unchanged and in full force and
effect. Payment provided for in this Change Order set forth herein, if any, are full and complete compensation to the
Contractor for the change(s) to the work, deleted work, modified work, direct or indirect impact on the Contractor's
schedule, and for any equitable adjustment to which the Contractor may be entitled, pursuant to the Contract between
the Owner and Contractor or any other basis whatsoever.
Contract Item
Estimated Revision in Contract Quantities
Number
Description
(-) Decrease
(+) Increase
1.10
Beam Type Guardrail
5 LF
This
adjustment is to document the
actual guardraiL
length of 225
LF
instead of the 220 LF Plan Estimate
which is
he result of the
actual
guard rail panel lengthE.
This
increases the contract amount
by $225 for a
total contract
adjusted
cost of $756,107
This
is also to document the relocation
of the gua
drail on Sharati
R
ad at Sta. 33+10 - 34+10 rig
tside to leftside
from 34+70 -
3
+70. This was done because of
the concern of lot
8, USS 3101
owner's
fear of vehicles failing
to negotiate th
turn on to
S
aratin from Spruce Cape Road
and due to the fa(t
that Lot 7
has
been filled in.
This Change Order is approved with the understanding that: (1) the total contract price may decrease or increase by the
actual quantity of materials deleted or installed as requested above and as paid for at extabLished unit contract prices,
(2) no additional cost except as described in (1) wi LL be borne by the Owner due to these revisions. Actual net decrease
or increase in the totaL contract price wiLL be reflected in the monthly and/or final pay estimates to the Contractor,
(3) the contract time is not changed.
APPROVED: KODIAK ISLAND BOROUGH
DATE: I1=_>1 1�1 J f Z.
PREPARED BY: KIB
APPROVED:
CONTRACTOR:BY��N_ `t4�NitEAY/'��.CS�S 4rNC-•
BY. s v
D E : 'D -ZIP ^� �
KODIAK ISLAND BOROUGH
CQNTRArT CHANGE ORDER
BOX 1246
KODIAK, ALASKA 99615
Contract No. _
Change Order No. 7
Project Name, Number & Location
Amount of Contract & Change Orders
Original Contract
Previous Changes
Contractor
This Change "
Adjusted Contract
Description of Change
Cost
lu U;; Ui 7
_._3.. k r.-_
__+�U
._., _..,.. .i e:.1 L .. �..Ic .
The time provided for completion of the contract is (unchanged) iiircrean dffdetita?M by
calendar days. This document shall
become an amendment to the contract and all provisions of the contract will apply thereto
Accepted By:-r— Date
�= Co ntraetor'rRepresentative
Recommended: r�,_-` �� 1_� Date
V �}
Facilitylcobrdinator
I
Approved By:. Date
": .. r
Contracting .Dff icer
Copies: Original to Facility Coordinator
Canary to Contractor
Pink to Project Inspector
KODIAK ISLAND BOROUGH t
CONTRACT CHANGE ORDER
710 MILL BAY ROAD
KODIAK, ALASKA 99615
Contract No. - - - `-- ' - Change Order No
Project Name, Number & Location
Amount of Contract & Change Orders
Original Contract ;, ` •,
4 f r t
- -
Previous Changes -J
Contractor
This Change
Adjusted Contract
Description of Change
Cost
1
The time provided for completion of the contract is (unchanged) (fALtYWw-d fV'PVV9WfiY ;; calendar days. This document shall
become an amendment to the contract and all provisions of the contract will apply thereto
w-
Accepted By: Date i
Contractor's Representative
,1
Recommended: -" '` Dat _
-� Facility C o �d inaltor' i
Approved a—_,.�_� I 'A�--�. Date
on ractiR ff er -
Copies: Original to Facility Coordinator
Canary to Contractor
Pink to Project Inspector
KODIAK ISLAND BOROUGH !
CONTRACT CHANGE ORDER
710 MILL BAY ROAD
KODIAK, ALASKA 99615
Contract No.: ` Change Order No
Project Name, Number & Location
Amount of Contract & Change Orders
Original Contract
--
-
Previous Changes
Contractor
This Change
Adjusted Contract
_ -
-
Description of Change
Cost
al,
Y L �
The time for completion of the contract is (unchanged) fby
calendar days This document shall
provided
become an amendment to the contract and all provisions of the contiac
J
wdl`a/Stifyf'flf o
Accepted By: -
Date '
- Contractor's Representative
Recommended:y t >' 1
Date
Facility C dmator
Approved By:
Date
Contracting Officer
Copies: Original to Facility Coordinator
Canary to Contractor
Pink to Project Inspector
ISLAND BOROUGH
COI*TRh�;T CHANGE ORDER
KODIAK
710 MILL BAY ROAD
KODIAK, ALASKA 99615
Contract No.
- _—re Change Order No _
Project Name, Number & Location
Amount of Contract & Change Orders
Original Contract
-
Previous Changes
Contractor
This Change
Adjusted Contract
- -
Description of Change
Cost
3
The time provided for completion of the contract is (unchanged/ y calendar days. This document shall
become an amendment to the contract and all provisions of the cbnirdsi wilYapply tWiiieto
Accepted By: .. .� .. _.._..
Date -
Contractor's Reprefentative
Recommended:
Date
Facility Coordinator
Approved By: 4.", �.
Date ...
- Contracting officer
Copies: Original to Facility Coordinator
Canary to Contractor
Pink to Project Inspector
KODIAK ISLAND BOROUGH I
-. CONTRACT E-HANGE ORDER
710 MILL BAY ROAD
KODIAK, ALASKA 99615
Contract No. Change Order No
Project Name, Number & Location
Amount of Contract & Change Orders
Original Contract ..
_.. .-� _ _ '.—.. ;... ._. _........ .,:...: .. .:. :. ...... :: . .. .. ..
-
Previous Changes
Contractor
This Change
Adjusted Contract
_
Description of Change
Cost
W
The time provided for completion of the contract is jpn f erp.0) (increased) fdec�e;� W by calendar days. This document shall
,
become an amendment to the contract and all provisions of the contract will apply thereto
Accepted By: Date
Contractor's Representative
Recommended: Date .
Facility Coordinator
Approved By: Date
Contracting Officer _
Copies: Original to Facility Coordinator
Canary to Contractor
Pink to Project Inspector
i AGREEMENT y
THIS AGREEMENT made this 2ND day of JANUARY 19 92 by
KODIAK ISLAND BOROUGH herein called the Owner,
and BRECHAN ENTERPRISES INC. hereinafter called the Contractor.
ARTICLE I. SCOPE OF WORK. The Contractor shalt perform, within the time stipulated the
Contract as herein defined, of which this agreement is a component part, and everything required to be
performed and shall provide and furnish any and ail utility and transportation services necessary to
perform the contract and complete in a workmanlike manner all of the
CONSTRUCTION work covered by the contract in connection with the Owner's
SHARATIN ROAD — CARROLL SEWER WATER
Project in strict conformity with the plans and specifications, including any and all Addenda issued by
the Owner, with the other contract documents hereinafter enumerated.
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and the
contract performed and completed subject to the approval of the Owner or its authorized represen•
tative.
ARTICLE II. LUMP SUM PRICES. The Owner shall pay to the Contractor as full consideration for
the performance of the contract, an amount equal to the Lump Sum amounts as set forth in the bid.
ARTICLE Ill. UNIT PRICES. The Owner shall pay to the Contractor as full consideration for the
performance of the contract, an amount computed upon the basis of the quantity of work actually
performed at the unit prices as set forth in the bid.
It is understood that the quantities stated are approximate only and are subject to either increase
or decrease, and should the quantities of any of the items of work be increased, the contractor shall
perform the additional work at the unit prices set forth in the bid and should the quantities be
decreased, payment will be made on actuai quantities insmiled at the unit prices set forth in the bid
and the Contractor will make no claim for anticipated profits for any increase or decrease in the
quantities. Actual quantities will be determined upon completion of the work.
ARTICLE IV. COMPONENT PARTS OF THIS CONTRACT. The Contract entered into by the
acceptance of the Contractor's bid and the signing of this agreement consists of the following
documents all of which are component parts of said Contract and as fully a part thereof as if herein set
out in full, and if not attached, as if hereto attached.
1. This Agreement
2. Change Orders
3. Addenda No. 1 s 2
4. Supplementary Conditions
5. Specifications (Division 1 through 16 of Project Manual)
6. Contract Drawings
00211.1
7. General Conditions
8. Standard Specifir' --insIncorporatedby Reference
9. Information for bwders'• 3 , n
10. Advertisement for Bids
11. Bid Form
12. Performance and Payment Bond
13. Notice of Award
14. Notice to Proceed
In the event of any conflict or inconsistency between any of the foregoing documents, the
conflict or inconsistency shall be resolved upon the basis of the numerical order. The document or
documents assigned the small number or numbers being controlling over any document having a larger
number in the numerical order set forth above. Provided, however, although the supplemental condi-
tions incorporates standard specifications by reference, in case of conflict or inconsistency, these
standard specifications have a numerical order as shown above.
IN WITNESS WHEREOF,three identical counterparts of this Agreement, each of which shall
for all purposes be deemed an original thereof, have been duly executed by the parties hereinabove
named, on this day and year first above written.
RODIAK ISLAND BOROUGH
OWNER
Corporate
Seal:
ATTEST: Title
By: -2
,/[2anur, CL • x Title
BRECHAN ENTERPRISES, INC.
CO OR
By:
Michael C. Brechan
President
Title
WITNESS, if individual or partnership
By:
00211.2
DIRECTOR
Corporate
Seal:
ATTEST (If Corporation)
By: 4j'19""
William E. Oliver
Secretary/Treasure
Title