92-005 Main Elementary Roof Repair Project(�k
;KODIAK ISLAN6 HOIROUGH ,
CONTRACT CHANGE ORDER
1710 MILL BAY ROAD
XODIAK, ALASKA 99815
Contract No. 92
-(] Change order No — 2
iP;mj"t Name, Numbitr & Lmtion
j 'mount of Contract & Change Orders
MAIN ELEMENZARY' ROOF REPAIR, KIS 410-447
Original Contract $504,$51.00 ;
KODIAK . ALAHKA
Previous Changes 18,870.00
Contractor
This Change 22,134.00
AdiustedContract
RAIN PROOF nOOFING CO, INC., 2201 E 84TH_ COURT
$545,955.00
ANCHORAGE AK 99507
Description of Change
cost I
SLALING & ;NSUPATING OF SIEERWALL/ROOF DETAIL DEFECT
$2,432.00
INSTALLATIQN OF A34 CONNECTORS TO STABILIZE
2"X4" BETWEEN
GLUP-•LAM SEAM AND ROOF SHEATHING
2,$51.00
ABATEMENT TREATMENT OF DRY ROT
2,085.00
RIDGE STRAP BLOCKING INSTALLATION
3,522.00',
ADDITIONAL URETHANE FOAM INSTALLATION
3s217.00
GABLE LaYEBROW SHEER TRANSFER DETAIL CHANGF
622.001.
ADDITIONAL'CI;ILING TILE REPLACEMENT
7,405.0011
NEW COMPLETION DATE 10-10-92
The time prolddad for mmpteffon of Mo eoetrset is f@} 4QIp1(t ((4aWWJ kW"&y 51 catendw dan > ns aacuownrvlr
bw*on mirowm a to the contrast ow$#Pm wt o(dre oantim will
tdaato
Accepted 6Y: A a: , d� vQe��
Data. �1�. 9 a --
C ntractor's Represtritatift
i
Remmmendedr
Dat
Facility o d natdr
' APprouad Bv+ ... IL Date
ntracting Officer
Original to Faicillty roord
Canary to 0ontractor
Pink to Froieofnapector
KODIAK 1S1.AND BORDUt
110 MILL 8AY ROAD
KODIAK, ALASKA 99615
FIELD CONTRACT C14ANGE ORDER
Contract 92-005 Change
Order No 1
proJaat Name, NUMIAr & 1-pcation
MAIN ELILMENTAR'1'ROOF REPAIRr KIB-410-447
KODIAKr AK
Connector
RAIN PROOF ROOFING CO INC. 2201 D BATS COURT
ANCIiORAGE AK 99507
peseription or Change
ROOF JO.T,ST REPAIR 1897 L.P. Q $10.00/LF
Amount of Contract & Change Orders
original Contract $504.851.00
-0-
previous CharWes
This Change 18,970-00
AdjUinadCuntract $523,821.00
Cost
818,970.00
THE ABOVE FIELD CHANGE ORDER I5 TO RECOGNIZE THE ADDITIONAL
QUANTITY OF 2X12 ROOF JOISTS REQUIRED TO REPAIR THE ROOF ABOVE
INITIAL
EXTBNT OF
POT L�
nMAGL WAS NOT ABL
TOBEDETiRMINED UNDER THEORIGINALSURVEY
«me Provided
rs
6eaeme en eme mens to the can:ract Nro m: v.w.=�•:• �• •••- --•
Atwted BY: -
ntrador's Repra ta[Iva
�1
Facility
Approved
Cppaa: Original
Canary
Pink to
F calendar days This docwment shall
Data
pate..-----r/Z-7
Rain Proof Roofing Co., Inc.
' 2201 EAST 84th COURT 2308 STANDARD AVENUE
ANCHORAGE, ALASKA 98507 FAIRBANK.& AI ASKA 99701
(907) 344.5545 (807) 458-5545
FAX (907) 349-3388 FAX (907) 452-2�3 {
March 17, 1992
Kodiak Island Borough
Office of the Maynr
710 Mill Bay road
Kodiak, Alaska 49615-6398
RF: Main Umftntary Roof Rcpsis Project
Project No. KI$ -410-447
Kodiak, Alaska
SUBJECT, Bid Modification
Gentlemen:
Please modify our bid by deducting the sun of Two Hundred Ninety
rive T_:)Lsaal, one Hundred Forty Nine Lc.L]A s ($295,149.00) from the
base bid.
Thank you for yo rr momration.
BCS Y'
atrl Rez11y
Pain Proof Roofing Co.,Inc.
��p�EtiG�lFACV+
KC 90AOS�11 C
OWNER - GENERAL CONTRACTOR
C O N T R A C T
THIS CONTRACT, made this 8th day of April A.D., 1992, between
the Kodiak Island Borough, acting by and through its Borough
Mayor, party of the first part, and Rain Proof Roofingof Anchorage,
• Alaska. Co.,Inc.
A CORPORATION, incorporated under the laws of the State of Alaska
its successors and assigns, party of the second part, hereinafter
called the Contractor.
WITNESSETH: That the Contractor, for and in consideration of the
payment or payments herein specified and agreed to by the party
of the first part, hereby covenants and agrees to furnish and
install all the materials and to do and perform all the work and
labor required in the construction of the Main Elementary Roof
Repair Project, Project RIB - 410 - 447 in the Kodiak Island
Borough, Kodiak, Alaska, for the sum of Five hundred four thousand
Dollars ($ 504,851.00 ) • Eight hundred fifty-ona
The Contractor further covenants and agrees that the entire
construction shall be done under the administration and to the
complete satisfaction of the Kodiak Island Borough subject to
inspection at all time and approval by any participating agency
of the Government of the United States of America, and in
accordance with the laws of the State of Alaska and rules and
regulation of said Federal Agency.
The Contractor further covenants and agrees that all of said work
and labor shall be done and performed in the best and most
workmanlike manner and that all and every of said materials and
labor shall be in strict and entire conformity in every respect
with the Contract documents: that he will abide by and perform
all stipulations, covenants, and agreements specified in said
Contract documents, all of which are by reference hereby made a
part of this Contract, as to all premises therein: and in case
any of said materials or labor shall be rejected by the Borough
Mayor or his assistant or authorized representative, as defective
or unsuitable, then the said materials shall be removed or
replaced with other approved materials and the said labor shall
be done anew, to the satisfaction and the approval of the Borough
Mayor or his representatives, at the cost and expense of the
Contractor.
The Contractor further covenants and agrees that all of said
materials shall be furnished and delivered and all and every of
the said labor shall be done and performed, in every respect, to
the satisfaction of the herein aforementioned Borough Mayor, on
or before August 20, 1992. It is expressly understood and
agreed that in case of the failure on the part of the Contractor
for any reason, except with the written consent of the Borough
Mayor, to complete the furnishing and delivery of said materials
32SP
age 1 of 3
KODIAK ISLAND BOROUGH
PROPOSAL
of
NAME OF
CONTRACTOR RAIN PROOF ROOFING CO., INC.
ADDRESS
2201 EAST 84TH COURT ANCHORAGE, ALASKA 99507
To the Borough Mayor of the Kodiak Island Borough:
The Undersigned proposes to furnish and install all materials required
in the construction of the Main Elementary Roof Repair Project,
Project No. RIB - 410 - 447, located within Kodiak Island Borough,
Alaska, according to the contract documents therefore and for the
amount and prices named herein as indicated on the Bid Schedule herein
contained which is made a part of this Proposal.
The Undersigned declares the only person or parties interested in the
proposal as principals are those named herein; and the proposal is
made without collusion with any person, firm or corporation; that he
has carefully examined the specifications; and General Provisions and
that he has made a personal examination of the site of the work and
that he is to furnish and install all the materials specified in the
manner and the time prescribed.
The Undersigned hereby agrees to execute all documents required by the
Instruction to Bidders within 5 days or such further time as may be
allowed in writing by the Borough Mayor after receiving written
notification of the Intent to Award, and it is hereby mutually under-
stood and agreed that in case we do not, we forfeit the accompanying
check or bid bond to the Kodiak Island Borough as liquidated damages,
and the said Borough Mayor may proceed to award the contract to
others.
Written notice of Intent to Award, will be mailed, or otherwise
furnished, within 10 calendar days after receipt of bids.
We hereby agree to commence the work on or after June 6, 1992, or such
time as may be allowed in writing by the Borough Mayor, after Receipt
of Award and Notice to Proceed, and to complete the work on or before
August 20, 1992.
The Undersigned shall sign a Contract containing a liquidated damage
clause and other requirements as stated by law, the liquidated damage
clause shall be Three Hundred Dollars ($300.00) per each calendar day
after contract completion.
The Undersigned proposes to furnish a 50% of the contractE�Eay�nent Bond
in the amount of R-
`' , 17 1aa�
$ Fifty Percent (50%) Of Attached Bid Ait
and a 50 % of the contract Performance Bond in the amoulgroN.
eS22SP
'age 1 of 2
Addendum #2
Attachment "A"
ATTACHMENT A
BID SCHEDULE
Rain Proof Roofing Co.,Inc. , in strict conformance with the
Contract Documents, will perform all of the work for the lump sum
price of:
Eight Hundred Thousand Dollars ----00/100 dollars $ 800,000.00
For the purpose of the lump sum bid above 500 LF of repair of 2 x
12 joist by detail 7/A4 is included.
In the event that the quantity of 2x12 joist repair required by
detail 7/A4 is higher or lower than the 500 IF contained in the
lump sum bid, the contract price will be adjusted at a unit price
per linear foot of joist as follows:
Unit Price 1. For repair of 2x12 joist required by detail 7/A4
Add/Deduct $ 10.00 (Ten Dollars)
Date:
March 17, 1992
(Seal - if by Corporation)
Respectfully submitted:
By: Rai roof Roof• g Co.,Inc.
C ntr or
Signature
President
Title
2201 East 84th Court
Anchorage Alaska 99507
Business Address
t 17
HL'DIAK .St np; :
EOHO(IGa `
OWNER - GENERAL CONTRACTOR
C O N T R A C T
THIS CONTRACT, made this 8th day of April A.D., 1992, between
the Kodiak Island Borough, acting by and through its Borough
Mayor, party of the first part, and Rain Proof Roof ingof Anchorage,
. Alaska, Co., Inc.
A CORPORATION, incorporated under the laws of the State of Alaska
its successors and assigns, party of the second part, hereinafter
called the Contractor.
WITNESSETH: That the Contractor, for and in consideration of the
payment or payments herein specified and agreed to by the party
of the first part, hereby covenants and agrees to furnish and
install all the materials and to do and perform all the work and
labor required in the construction of the Main Elementary Roof
Repair Project, Project RIB - 410 - 447 in the Kodiak Island
Borough, Kodiak, Alaska, for the sum of Five hundred four thousand
Dollars ($504,851.00)• Eight hundred fifty-one
The Contractor further covenants and agrees that the entire
construction shall be done under the administration and to the
complete satisfaction of the Kodiak Island Borough subject to
inspection at all time and approval by any participating agency
of -the Government of the United States of America, and in
accordance with the laws of the State of Alaska and rules and
regulation of said Federal Agency.
The Contractor further covenants and agrees that all of said work
and labor shall be done and performed in the best and most
workmanlike manner and that all and every of said materials and
labor shall be in strict and entire conformity in every respect
with the Contract documents: that he will abide by and perform
all stipulations, covenants, and agreements specified in said
Contract documents, all of which are by reference hereby made a
part of this Contract, as to all premises therein: and in case
any of said materials or labor shall be rejected by the Borough
Mayor or his assistant or authorized representative, as defective
or unsuitable, then the said materials shall be removed or
replaced with other approved materials and the said labor shall
be done anew, to the satisfaction and the approval of the Borough
Mayor or his representatives, at the cost and expense of the
Contractor.
The Contractor further covenants and agrees that all of said
materials shall be furnished and delivered and all and every of
the said labor shall be done and performed, in every respect, to
the satisfaction of the herein aforementioned Borough Mayor, on
or before August 20, 1992. It is expressly understood and
agreed that in case of the failure on the part of the Contractor
for any reason, except with the written consent of the Borough
Mayor, to complete the furnishing and delivery of said materials
32SP
'age 1 of 3
shall be final and conclusive unless determined by a court of
competent jurisdiction to have been fraudulent, or capricious, or
arbitrary, or so grossly erroneous as necessarily to imply bad
faith.
The Disputes article does not preclude consideration of questions
of law in connection with decisions provided for above. Nothing
in this contract, however, shall be construed as making final the
decisions of the Kodiak Island Borough Assembly or its
representative on a question of law.
At all times during the time that a dispute is pending and in the
process of being resolved or decided, the Contractor shall
proceed diligently with the work so as to achieve, if a all
possible, performance of the work within the contract allotted
time.
The Contractor hereby agrees to receive the prices set forth in
the proposal as full compensation for furnishing all the
materials and labor which may be required in the prosecution and
completion of the whole work to be done under this contract, and
in all respects to complete said contract to the satisfaction of
the Borough Mayor.
It is further distinctly agreed that the said Contractor shall
not assign this contract, nor any part thereof, nor any right to
any of the monies to be paid him hereunder, nor shall any part of
the work be done or materials furnished under this contract.
The bonds given by the Contractor in the sum of 50% Payment Bond,
and 50%, Performance Bond, to secure the proper compliance with
the terms and provisions of this contract, are hereto attached
and made part thereof.
IN WITNESS WHEREOF, The Kodiak Island Borough Mayor, by authority
in him vested, has executed this contract on behalf of the Kodiak
Island Borough, and the said has hereunto set
their hands and seals, the day and year first above written.
KODIAK ISLAND BOROUGH
BY - 1 rv- 9.Z
ough Mayor
By
Facilities Coordinator
ATTEST:
Borough Clerk
32SP
age 3 of 3
CONTRACTOR
Rain Proof Roofing Co.,Inc.
2201 Court
Anc age, asl 5
104
By
resident
APy SFO
*0&Vl 1982
B6�O 4410
ITEM NO
Kodiak /s/and Borough
AGENDA STATEMENT
Meeting of: April 2, 1992
12.A.1.
ITEM TITLE: Contract Award - Main Elementary
Roof Repair Project, KIB 410 - 447
SUMMARY STATEMENT
Bids were advertised & publicly opened on March 17, 1992 at
3:00 p.m. in the Borough Conference Room. A bid tabulation
sheet is attached for review. Recommend award of the Main
Elementary Roof Repair Project, KIB 410 - 447 to Rain Proof
Roofing, Inc. of Anchorage, Alaska, in an amount not to
exceed $ 504,851.
FISCAL NOTES
I ] N/A Expenditure Account
Required $504,851 No 410-447-452-150-034-005
APPROVAL FOR AGENDA:
Mayor
KtUU1V11VItIVUtU At; I IUIV:
Move to award Contract No. 92-410-447 Main Elementary
School Roof Repair Project to Rain Proof Roofing, Inc.
of Anchorage, Alaska, in an amount not to exceed $504.851.
MAIN ELEMENTARY ROOF REPAIR, KIB 410 - 447
BID TABULATION
March 17, 1992 3:00 p.m.
FIRM
BASE BID
UNIT PRICE 1.
2 x 12 JOIST
REPAIR
A & E ESTIMATE
$ 670,201
Clarion Company
660,223
$ 5.00/L.F.
Gaston & Assoc., Inc.
698 000
1.75/L.F.
Lawrence Gentry Cnstn.
649,000
1.75/L.F.
Holden Company
746,458
2.94/L.F.
Criterion General,
Inc.
636,000
5.00/L.F.
Johnson Company, Inc.
528,000
3.75/L.F.
H2W Construction, Inc.
552,000
2.50/L.F.
RainProof Roofing,
Inc.
504,851
10.00/L.F.
ITEM NO. 112D. I.
Kodiak /s/and Borough
AGENDA STATEMENT
Meeting of: March 5, 1992
ITEM TITLE: New Business - other. Approval of
Main Elementary Roof Repair Construction Documents.
SUMMARY STATEMENT
The Main Elementary Roof Repair construction documents,
prepared by Kumin Associates, Inc. of Anchorage, Alaska,
were reviewed and approved by the Architectural Review Board
on February 5, 1992, and the Kodiak Island Borough School
Board during their meeting held February 24, 1991. Bids for
the project are scheduled to be opened mid-March with
construction to occur this summer. Assembly approval of the
construction documents is a requirement to request
reimbursement from the State of Alaska Department of
Education. Recommend the Assembly approve the Main
Elementary Roof Repair Project construction documents
prepared by Kumin Associates, Inc. of Anchorage, Alaska,
dated February 3, 1992.
FISCAL NOTES
[X] N/A Expenditure Account
Required No
APPROVAL FOR AGENDA:
Mayor
RECOMMENDED ACTION:
ARCHITECTURAL REVIEW BOARD
MINUTES
February 5, 1992
Attending the meeting were: Jim Wheeler, Ron Chase, Thomas
Rainey, Betty Walters, Ray Camardella, Mike Milligan, Gerry
Cloudy, Woody Koning, and William Matzell. Tom Hettich and
Kaye McClain also attended the meeting.
Following self introductions and a brief discussion of the
function of the board, the chair entertained nominations for
the chairmanship. Ron Chase nominated Jim Wheeler,seconded
by Mike Milligan, for chairman. There were no other
nominations. Mr. Wheeler was elected unanimously.
Nominations for vice chairman were then addressed. Jim
Wheeler moved Ron Chase for the position. Seconded by Woody
Koning, Mr. Chase was elected since no other nominations
were forthcoming.
Mr. Rainey moved the minutes of the meeting of December 4,
1991, be approved. Seconded by Mr. Chase, the motion passed
unanimously.
Main Elementary Roof Repair 100 % plans were reviewed by the
Board. Tom Hettich, of Kumin Associates, Inc., noted the
Fire Marshal had agreed in concept with the materials to be
used. The project is to begin the day after school is out
and completed by August 20.
Discussion included questions about the depth of the foam
since moisture only migrates 2% into foam. The venting was
mentioned as a bonus in keeping the vapor out of the roof.
The Extruded PVC ridge cap was discussed, including
notations of previous satisfactory uses. It was noted this
project will have full time inspection services. Mr.
Hettich noted they will be making sure where the vapor
barrier meets the glulam it will be made secure --making it
as tight as they can.
The architects are hopeful the joists are in good condition
for the most part. They expect to pull out the bad and then
treat the lumber to stop/prevent further growth. The
original 5/8" plywood will be replaced with 7/8" tongue and
groove plywood. Zinc will be placed on the ridge as a moss
deterrant.
Mr. Chase moved the approval of the 100 % design plans.
Seconded by Mr. Milligan, the motion passed. It was noted
that an Addendum will be issued after the pre-bid conference
to deal with the siding/facia and painting.
A brief review of the High School Alteration, Phase II
Project was detailed before looking at the plans. There
were no changes in the classroom area from the 30 % plans.
The will probably be a surplus sale of cabinetry and
appliances which will not be incorporated in the new home
economics area.
Mr. Hettich said the flooring company and the bleacher
company agree that the flooring could withstand the point
load and stress on the floor. It was brought up that there
would be another point load with people on the bleachers.
Mr. Hettich agreed to do further investigation on the
suitability of the Mondo floor covering.
Discussion then centered on the treatment of the windows
between the gym and pool. The plans called for attaching
lexan over the windows on the gym side with metal brackets.
The suitability of lexan, which can be scratched, was
questioned. Alternatives were discussed including,
replacing the glass with lexan or closing a portion of the
windows and reducing the viewing area size. It was
determined that, if possible, the glass should be replaced
with lexan, if not, it should be completed according to the
100 % design.
Mr. Milligan moved, seconded by Mr. Chase, that the 90 %
design drawings be approved. The motion carried.
Adjournment
There being no further business, the meeting was
adjourned at 11:00 p.m..
Signed,
James Wheeler
Chairman
Date
Submitted by,
Kaye cC ain
Eng/c Secretary
Da e
KODIAK ISLAND BOROUGH SCHOOL DISTRICT
Regular Meeting - February 24, 1992
S U M M A R Y
ACTION ITEMS:
APPROVED: Motion to approve the minutes of the regular meeting of
January 27, 1992, the special meeting of February 3, 1992,
and the special meeting of February 17, 1992.
APPROVED: Motion to adopt the Strategic Plan Executive Summary in the
second reading, as amended.
APPROVED: Motion to approve extra -duty contracts for the 1991/92
school year for the following: At Kodiak Junior High:
Wrestling - John Pruitt, in the amount of $1,513; Wrestling
Assistant - Pete Probasco, in the amount of $688; Volleyball
- Roxy Bringgold, in the amount of $1,376; and Volleyball
Assistant - Lisa Oliveira - $573; at Kodiak High School:
Girls Track - Elizabeth Ardinger, in the amount of $2,109;
Boys Track - Jeff Hamer, in the amount of $1,834; Girls
Track Assistant - Charlotte Mickelson, in the amount of
$1,651; and Boys Track Assistant - Sharon Harris, in the
amount of $1,513; at Old Harbor School: Volleyball - Ray
Krumrey, in the amount of $1,204; Student Council - Steve
Rounsaville, in the amount of $573; at Akhiok School -
Intramurals - Mark Voss, in the amount of $1,204; for a
total of $14,238.
APPROVED: Motion to approve leaves of absence for the 1992/93 school
year for the following certificated staff members: Dorothy
Ford-Sturdevant, Anne M. Jacobson, Dean Olsen, Frank Parker,
Christopher Provost, Rodney Sehorn, Patricia J. Smedley, and
Melissa Thompson.
FAILED: Motion to approve the sabbatical leave request for the 1992/93
school year submitted by Patricia J. Smedley.
APPROVED: Motion to approve the FY 92 Chapter I -M Summer Grant application
in the amount of $45,750.
APPROVED: Motion to approve the Chapter I -M Migrant Education Instructional
Assistant/Training Special Grant request in the amount of $8,088.
APPROVED: Motion to acknowledge receipt of the South East Regional Resource
Center Mini -Grant award in the amount of $1,000.
APPROVED: Motion to approve the Kodiak High School Remodel 1008 drawings.
APPROVED: Motion to approve Main Elementary School Roof Repair 1008
drawings.
SCHOOL BOARD REGULAR MEETING
February 24, 1992
Summary
Page 2
APPROVED: Motion to approve the applications for the Japanese School
Internship Program.
APPROVED: Motion to acknowledge receipt of the January Report of
Revenues and Expenditures.
APPROVED: Motion to enter into executive session for the purpose of
discussing negotiations, and to include members of the
negotiating team.