93-51 Coastal Management Program - Phase IIITEM NO. 12.A.1.
Kodiak Island Borough
AGENDA STATEMENT
Meeting of: October 7, 1993 Contract No. 93- 51
ITEM TITLE: Award of a Contract for the revision of the
Kodiak Island Borough Coastal Management Program - Phase II.
SUMMARY STATEMENT: In February of 1993, the Kodiak Island
Borough Assembly approved the advertisement of a request for
proposals (RFP) for the revision of the Kodiak Island Borough
Coastal Management Program (KIBCMP). Two proposals were received
in response to the solicitation. The Planning and Zoning
Commission recommended award of the contract to Jon Isaacs and
Associates.
The revision project was separated into two (2) phases, to
reflect the two fiscal years over which the project would be
completed. Phase I of the project is complete and the Phase I
project report has been distributed to the Assembly, the Planning
and Zoning Commission and some members of the public.
The purpose of this action is to award the Phase II contract to
Jon Isaacs and Associates. Resolution 93-10A authorized the
receipt of grant funds of $32,000 from the State of Alaska to
fund Phase II of the revision project.
Attached for the Assembly's information is the proposed work
program and budget for the Phase II project.
FISCAL NOTES
[ ] N/A Expenditure Account
Required $32,000 General Fund 230-252
APPROVAL FOR AGENDA: ^ /
Mayor:
ACTION:
Move to award a contract for the revision of the Kodiak Island
Borough Coastal Management Program - Phase II to Jon Isaacs and
Associates in an amount not to exceed $32,000.00.
AUG 26 199 13 07 907 276-6117
Draft 71271W
KODIAK ISLAND BOROUGH COASTAL MANAGEMENT PROGRAM
PHASE 2 REVISIONS
1.0 tNTRODUCTION
1.1 BACKGROUND
P.2/9
In Mardi of 1993, the Kodiak Island Bo%initiatedgh changes have occurred that nd cafe
revision of its ooQGtQI management
program. Since the program was Prepaud severai
a need for program revisions:
The Borough increased in area with the 1989 annexation of lands on the Alaskan
Peninsula and islands south of the archipelago in the Gulf of Alaska
• Many portions of the KIBCMP are out of date and should be revisod
• Current land use issues and use of the KIBCMP as an informal comprehensive
plan indicate a need to update the KIBCMP
The Phase 1 effort focussed on revising the issues, goals and objectives; initiating
changes to the resource inventory and analysis; making boundary recommendations; and
making preliminary recommendations for changes to the policies and implomontation.
1.2 PHASE 2 OBJECTIVES
The proposal to continue revisions to the KIBCMP in phase 2 has the following objectives:
• revise the KIBCMP to provide effective coastal management and long range
planning in the Kodiak Island Borough
complete revisions to the resource inventory and analysis
e review, evaluate, and revise the classification areas, subject uses, and policies
of the KIBCMP
• review, evaluate, and revise the implementation chapter of the KIBCMP
1
AUG 26 193 13:07 907 276-6117
Drab 7/27/93
P. 3B
• review, evaluate, and revise Area Meriting Special Attention (AMSA)
recommendations for the KIBCMP
• complete an adequate public participation program with a Citizens Advisory
Committee and Borough rooldents
• prepare a Public Hearing Draft (PHO) of the revised KIBCMP, and hold
appropriate public and agency meetings
• incorporate comments on the PHD into a Concept Approved Draft for approval
by the Borough Planning Commission, Assembly, and subinitial to the Alaska
Coastal Policy Council for approval
• assist the Borough with evaluation of state Findings and Conclusions on the
Concept Approved Draft and presentation of the plan to tho Alaska Coastal Policy
Council for approval
2.0 PHASE 2 WORK PLAN
As indicated in the introduction, preparation of the Public Hearing and Concept Approved
Draft will take place in Phase 2. The following tasks are scheduled for Phase 2:
Task 1 Completion of Resource Inventory and Analysis
Using information obtained from the Minerals Management Service, Petromarine, the
1980 census, and U.S. Fish and Wildlife Service, updating the resource inventory and
analysis. The update will focus on topics 1) identified in the issues, goals, and objectives,
and 2) pertinent to providing support to land use regulations.
Task 2 Review, evaluate and revise the classification areas subiect uses and
oolloies of the K180101f
Based on the revised issues, goals, and objectives, and revised inventory and analysis,
the nature and boundaries of the resource classifications areas will be reviewed and
revised. Land use and zoning will also be taken into consideration.
F
AUG 26 '93 13:08 907 276-6117
Draft 7/27/93
KIBCMP policies will be evaluated and revised based on several factors:
P.4/8
• enforceable and administrative policy language from more recent coastal
management pians
• the focus of the revised issues, goals, and objectives
• land use and zoning considerations
Special management or other area -specific policy schemes have been useful in other
coastal management plans, and may be used if necessary. These more specific policies
can be applied to geographically limited areas that have common problems, avoiding the
use of unnecessarily strict policies on a Borough wide basis. They could be linked to the
individual classification areas, or other areas based on identification of common
environmental or land use concerns.
Task 3 Review Evaluate and Revise the Implementation Chanter of the KIBCMP
There several consideration in revising the implementation chapter of the Kodiak Island
Borough coastal management program. First, because It Is an older coastal management
plan, the Chapter needs to be revised to ref ecr current federal/state consistency review
requirements and procedures. Second, the Kodiak Island Borough has modified some
of its local land use regulations, and developed procedures for using the coastal
management program during review and approval of Title 29 land uee requirements.
these need to be incorporated into the implementation chapter. Finally, a major intent of
the program revisions is to focus on current land use issues, and use the coastal
management plan as a comprehensive plan to support Borough land use regulations.
Modifications to the implementation chapter should reflect this orientation and provide
adequate linkage to municipal regulations and ordinances.
Task 4 Review. Evaluate and Reviae Area Meriting Saecial Attention (AMSA)
Recommendations for the KIBCMP
At this poem In time, It Is envisioned that changes to this chapter will be minor. The
Borough should consider whether, after 10 years, it wishes to drop or add any potential
AMSA's. In particular, the resource inventory/analysis and evaluation of current land use
issues may indicate a need for new AMSA's.
3
P.5/8
AUG 26 '93 13:09 907 276-6117
Draft 7/27/93
Task 5 Prepare
a Public
Hearing
Draft
(PHO) of the revised KIBCMP, and Hold
Aoprooriate
Public
and Aoency.
Msetinos
Upon completion of the live previous tasks, a Public Hearing Draft (PHD) of the revised
KIBCMP Will be prepared for approval by the Planning Commission and subsequent
distribution. The consultant team will assist the Borough in setting up and conducting a
public hearing in Kodiak and agency meetings in Anchorage.
Task 7 Preare a Concept Approved Draft for
Commission, Assembly, and submittal to the AlalkaQoastal Policy Council
for • r
Public testimony and written comments received on the PHD will be evaluated, using
direction from Borough staff. Appropriate changes will be made in the PMD to prepare
a Concept Approved Draft (CAD). Tho CAD will be submitted to the Borough Planning
Commission and Assembly for approval. Upon approval is will be submitted to the State
for review and approval by the Alaska Coastal Policy Council. The consultant team will
assist the Borough in reviewing preliminary and final Findings and conclusions prepared
by the Division of Governmental Coordination.
1 _ eublic Participa .. Advisory
Committee _._n,:
The consultant team will support Borough staff in designing and conducting a public
participation program associated program revisions. This will include attendance at
selected public meetings, and possible use of newsletters and other tools.
4
AUG 26 '93 13:09 907 276-6117
DMft 7/27,W
3.0 PROJECT BUDGET
P.6/8
Table 4-1 presents the proposed budget for Phase 2, which totals $32,020. This amount
includes eight trips to Kodiak.
Table 4-2 is a preliminary budget estimate for Phase 2 funding. it Includes staffing and
air fare/per diem costa to Kodiak, but assumes that any village travel will be picked up
by the Borough. In addition, it does not include report printing estimates, since current
DGC/DCRA practice is to fund printing from a separate source of funding.
4.0 PROJECT SCHEDULE
The project schedule for Phase 2 revisions to the KIBCMP are presented below. It
assumes an September 1 Start-up.
Task
Continue Revision of Inventory and Analysis
Task 1: Revise Management Classification
System
Task 2: Revise Subject Uses and Policies
Task 3: Revise Implementation Chapter
Task 4: Revise AMSA Chapter
Task 5: Prepare Public Hearing Draft
Task 5: Public Hearings and Agency Meetings
Task 7: Prepare Concept Approved Draft
Date
September -October
September
November - Planning Commission meeting
subject to Borough sohodulc
November -December
December
January (Planning Commission Meoting)
February (Planning Commission Meeting)
March
Task 9: Assistance with State Approval April - Juno
AUG 26 193 13:10 907 276-6117
KODIAK ISLAND BOROUGH COASTAL MANAGEMENT PROGRAM
PHASE 2 PROGRAM REVISIONS
PHASE 2
TASK/STAFF HOURS RATE COST TOTAL
TASK?: REVISt MANAGEMENT CLASSIFICATION SYSTEM
J.ISAACS 16 $86.00 $1,040.00
G. LEWIS 8 $65.00 $520.00
J. CLASPFI I S 586.00 $620.00
TASK P: REVISE SUBJECT USES AND POLICIES
J.ISAACS
40
$65.00
$2,600.00
G. LEWIS
24
$66.00
$1,580.00
J. GLASPELL
24
$65.00
$1.580.00
J. RICHARDSO
8
$80.00
$640.00
TASKS. REVISE IMPLEMENTATION CHAPTER
J.ISAACS
40
$66.00
$20U.00
0. LEWIS
32
$85.00
$2,080.00
TASK 4: RFVISF. AMSA CHAPTER
J.ISAACS
8
$65.00
$620.00
4 LEWIS
2
$06.00
$130.00
J. GLASPELL
2
$86.00
$130.00
TASK S. PREPARE PUBLIC HEARING DRAFT
J.ISAACS
24
$66.00
$1,560.00
G. LEWIS
8
686.00
$620.00
J. GLASPELL
8
$66.00
$520.00
TASK 8: PUBLIC HEARINGS AND AGENCY MEETINGS
J.ISAACS
24
$85.00
$1,660.00
G. LEWIS
8
585.00
5620.00
J. GLASPELL
8
$66.00
$620.00
TASK 7: REVIEW
COMMENTS, PREPARE CONCEPT APPROVED DRAF
J.ISAACS
40
$85.00
$2,600.00
0. LEWIS
16
$65.00
$1,040.00
J. GLASPELL
16
$65.00
$1,040.00
TASK 8: PUBLIC PARTICIPATION'
J.ISAAGS
24
$85.00
$1,580.00
G. LEWIS
8
$86.00
$620.00
TASK 9- ASSISTANCE WITH STATE APPROVAL
J.ISAACS 24 $65.00 $1,660.04
P.7i8
AUG 26 193 13:10 907 276-6117
airfare 8'200 $1,600.00
per diem 8'100'3 $1,600.00
mapping (autocad) $1,000.00
phone $200.00
Xerox $200.00
TOTAL ESTIMATE $32,020.00
P. 8/e