Loading...
FY2026-38 Port Lions School Painting Design & CA Services with Jensen Yorba WallJensen Contract FY2026-38 Yorba Wall Inc. 522 West 10th Street, Juneau, Alaska 99801 907.586.1070 jensenyorbawall.com Designing Community Since 1935 Date: November 12, 2025 To: Codi Allen From: Corey Wall Re: KIB Port Lions School Painting (JYW No. 25041) Design Fee Proposal & Scope Please find attached a fee proposal for design documents for the Port Lions School Painting Project. The project will consist of preparation and repainting of the existing Port Lions School, including wood siding and trim as well as misc. metal mechanical hoods, louvers and equipment. The design documents will include new notations on the existing, scaled PDF drawings of the school. Exclusions & Notes: • Replacement of any architectural items, including doors, flashings, roofings, etc., is not anticipated. Some flashing will be added to deflect water at the roof valleys. • Painting of pre -finished items, including doors, windows, flashings, and roofing, is not anticipated. • Replacement or treatment of rotten / deteriorated siding is not anticipated. The rotten wood trim at grade will be replaced. • Painting of other buildings on the site, is not included. • The documents will be based on information gathered by KIB. Site visits by the design team are not anticipated. • Limited CA services—including submittal review and RFI responses—are included on a Time & Materials basis. On-site observations and inspections are not included with the assumption this work will be done by KIB staff. Thanks again for letting us assist you. Total Proposed Design Cost: $14,934 ;VY wa-al, Ai ee Williams, ugh Manager Nova M. Javier, Borou h Clerk, Attest ds Date Y . Date Jensen Yorba Wall Architecture Interior Design Construction Management page 1 of 1 DESIGN SERVICES PROPOSAL Jensen SUMMARY Yorba Wall Project: KIB Port Lions School Painting Inc. JYW Project No.: 15041 — -- SERVICES FEE TYPE EXPENSES TAX TOTAL Pre -Design / Site Investigation $0 Lump sum $0 $0 $0 Conceptual Design $0 Lump sum $0 $0 $0 Schematic Design $0 Lump sum $0 $0 $0 Design Development $0 Lump sum $0 $0 $0 Construction Documents $13,740 Lump sum $0 $0 $13,740 Bidding $0 TBD $0 $0 $0 Bidding/ Construction Administration $1,194 T&M $0 $0 $1,194 Construction Observations $0 TBD $0 $0 $0 TOTAL $14,934 G:\–Projects\25041\0 Scope & Fee\KIB Port Lions School Painting FEES SUM 1 11/12/2025 DESIGN SERVICES PROPOSAL CONSTRUCTION DOCUMENTS SERVICES Project: KIB Port Lions School Painting JYW Project No.: 25041 Jensen Yorba Wall Inc. ARCHITECTURE: Project Management Research Drawings Base Plans, Elevatior Final Drawings Details Specifications Meetings / Review QC Subtotal Subtotal Do CONSULTANTS: Civil Engineering Structural Engineering Mechanical Engineering Electrical Engineering Hazardous Materials Engineering Landscape Architecture Cost Estimating Subtotal $0 Overhead/Profit 10% $0 Consultants Total Labor $0 Subtotal Design Development Services LABOR $13,740 Subtotal Design Development Services REIMBURSABLES (see attached) $0 TOTAL CONSTRUCTION DOCUMENTS SERVICES FEE (Time & Expense) $13,740 KIB Port Lions School Painting FEES -50 CD 1 11/12/2025 Architect Interior Design Construction Manage Drafter Exec A Cler A ACC STAFF: PMgr A -III A -II I A -I I Int III Int 11 ID -111 ID -11 ID -1 1 CM -III I CM -11 CM -1 D -II I D -I EA CA A TOTAL $199 $147 $131 1 $125 1 $100 1 $90 $153 1 $121 $90 $165 $131 $100 $104 $70 $84 1 $42 $85 ARCHITECTURE: Project Management Research Drawings Base Plans, Elevatior Final Drawings Details Specifications Meetings / Review QC Subtotal Subtotal Do CONSULTANTS: Civil Engineering Structural Engineering Mechanical Engineering Electrical Engineering Hazardous Materials Engineering Landscape Architecture Cost Estimating Subtotal $0 Overhead/Profit 10% $0 Consultants Total Labor $0 Subtotal Design Development Services LABOR $13,740 Subtotal Design Development Services REIMBURSABLES (see attached) $0 TOTAL CONSTRUCTION DOCUMENTS SERVICES FEE (Time & Expense) $13,740 KIB Port Lions School Painting FEES -50 CD 1 11/12/2025 DESIGN SERVICES PROPOSAL CONSTRUCTION ADMINISTRATION SERVICES Project: KIB Port Lions School Painting JYW Project No.: 25041 Jensen Yorba Wall Inc. ARCHITECTURE: Bidding Pre -Bid Conference Clarifications Construction Admin RFIs/RFPs/CO'S Submittal Review Close-out Subtotal Hours Subtotal Dollars $ CONSULTANTS: Civil Engineering Structural Engineering Mechanical Engineering Electrical Engineering Hazardous Materials Engineering Landscape Architecture Subtotal $0 Overhead/Profit 10% $0 Consultants Total Labor $0 Subtotal Construction Administration Services LABOR $1,194 Subtotal Construction Administration Services REIMBURSABLES (see attached) $0 TOTAL CONSTRUCTION ADMINISTRATION SERVICES FEE $1,194 KIB Port Lions School Painting FEES -70 CA 1 11/12/2025 Architect Interior Design Construction Manage Drafter Exec A Cler A ACC STAFF: PMgr A -III A -II A -I Int III Int 11 ID -III ID -11 ID -1 CM -III CM -11 CM -1 D-11 D-1 EA CA I A TOTAL 1 $199 1 $147 1 $131 1 $125 1 $100 $90 $153 $121 $90 $165 1 $131 1 $100 $104 $70 $84 $42 $85 ARCHITECTURE: Bidding Pre -Bid Conference Clarifications Construction Admin RFIs/RFPs/CO'S Submittal Review Close-out Subtotal Hours Subtotal Dollars $ CONSULTANTS: Civil Engineering Structural Engineering Mechanical Engineering Electrical Engineering Hazardous Materials Engineering Landscape Architecture Subtotal $0 Overhead/Profit 10% $0 Consultants Total Labor $0 Subtotal Construction Administration Services LABOR $1,194 Subtotal Construction Administration Services REIMBURSABLES (see attached) $0 TOTAL CONSTRUCTION ADMINISTRATION SERVICES FEE $1,194 KIB Port Lions School Painting FEES -70 CA 1 11/12/2025