SEAVIEW LT 11 - ZCP 8/15/2025Kodiak Island Borough
Community Development Department
710 Mill Bay Road Room 202
Kodiak, Alaska 99615
Phone (907) 486-9363 Fax (907) 486-9396
bcutrie@kodiakak.us
Zoning Compliance Permit Permit No.
The following information is to be supplied by the Applicant
Property Owner/Applicant: KODtAK 00�k �,aRIA)ees 14C.lx�"Aao '-n4"JAJEP_
Mailing Address: P,o_ Box 73 t 5 _ ActGSON toy o q3 3 0o Z.
Phone Number: 3D 7 - 46 96- ze sa
Other Contact Email, etc..: W tf 5 L L C e N o %ihfl rL, Co 1,1
FA tt
Legal Description: Subdv: 6EA ✓el uJ Lot:
Street Address: EZ66
Use & Size of Existing Structures: /- �u ✓kc e Sao ea z soo
/- Mr 7,,44 BK✓�c(�PNg 3Z (� y/
Description of Proposed Action: /-3s/'x = E1✓C1050a wie1-4e eaArI7-2al A
-5fo4A5", No /.JucJc.e, c.Jz/�-2, ;Sec,.fe.2 �Peycc/Fle,�je�t�
0
A)O pLC f-S1D3 '0'4/ZA/
Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code
and that I have the authority to certify this as the Property owner. or as a representative of the property owner. I
agree to have identifiable corner markers in place for verification of building setback (yard) requirements.
Title: Print Name: eclWAA 4 eg /Y/ 92 fig✓
Date: Signature:,
Site Plan to include lot boundaries and existing easements and buildings, proposed location of new construction
access points, and vehicular parking area, As -Built required with all improvements changes.
This permit is only for the proposed project as described by the applicant. If there are any
changes to the proposed project, including its intended use, prior to or during its siting,
construction, operation, contact this office immediately to determine if further review and
approval of the revised project is necessary.
THIS FORM DOES NOT AUTHORIZE CONSTRUCTION WHEN A BUILDING
PERMIT IS REQUIRED.
Staff Compliance Review
Does the Project involve EP Proof of EPA notification provi d (if required)?
Defined Facility? Tom rical Buildings, 'Required for all demos, renovation sturbing at least UO sq
Installations, institutions nd residences feet, 260 lineafeel, or 35 cubic Regulated Asbestos Containing
With more than fo (4) dwelling unites' Material (RACM) and for renovatio at remove load supporting structure'
Expiration: Any Zoning Compliance Permit issued is subject to the same expiration, suspension, and revocation
provisions as a building permit issued far the same construction permit.
Current Zoning: \ - 1-I, 106
Lot Area: 20,00b(V Lot Width: 7.
Front Yard: `J(7 Side Yard: ZO
Parking Plan: / Parking Spaces:
Staff Notes:
Date:
Payment Verification
Waived:
Less than 1.75 Acres
1.76 to 5.00 Acres:
5.01 to 40.00 Acres:
40.01 Acres or more:
-A /n \4
Staff Certification
CDD Staff Signature:
Prop. ID: 1-1
Building Height: 1L1136 1-1. 105. 05D
Rear Yard: ZL7
As -Built:
NL�
After the Fact 2X the published amount
$0.00 ❑
$0.00
❑
$30.00 ❑
$60.00
❑
$60.00 d
$120.00
❑
$90.00 ❑
$180.00
❑
$120.00 ❑
$240.00
❑