FY2024-32 Landfill/Leachate Treatment Plant Surface Water Monitoring Report With Jacobs EngineeringCONTRACTS TRANSMITTAL FORM
RETENTION SCHEDULE: CL -09 CONTRACTS
Records related to obligations under contracts, leases, and other agreements between the Borough and outside parties,
successful bids, and proposals. Active records are kept by the corresponding department. Apply retention (plus 4 years) once
contract or agreement expires, or once product is procured. Apply retention (plus 25 years) for agreements that involve
real property.
DATE: 07/07/25 TRANSMITTED BY: Patricia Valeri0
DEPT: Engineering & Facilitie
CONTRACT NO.: FY 2024-32 VENDOR OR CONTRACTOR: Jacobs Engineering
CONTRACT TITLE(Please provide details that are available such as purpose and/or the amount):
2025 Surface Water Monitoring Support
Administrative contracts are contracts approved by the manager that are within the spending
authority allowed by code. Assembly approved contracts are beyond the manager's spending
authority and require approval by the Assembly during a meeting.
APPROVED BY: Administrator DATE OF APPROVAL: 04/09/24
TYPE OF CONTRACT: Contract
PROVIDE DETAILS FOR ANY AUTOMATIC RENEWALS OR EXTENSIONS BELOW:
Completion of Sampling and Reporting
EXPIRATION OR REVIEW DATE:
PURGE DATE: 06/30/2033
If there's no expiration date or the contract is open-ended, enter 9999 in the date field and explain when
it should be flagged for review:
Are all relevant attachments, exhibits, referenced documents attached? ❑1
Are the successful bids and proposals incorporated in the attachments? ❑
ONLY COMPLETE THIS SECTION IF THE RECORD AMENDS, EXTENDS, IS A
CHANGE ORDER, OR AN ADDENDUM TO AN EXISTING CONTRACT
DATE: 07/07/25 REQUESTED BY: Patricia Valerio
CONTRACT NO.: FY 2024-32 C01
APPROVED BY: Assembly
CATEGORY: Change Order
TYPE OF CONTRACT: Contract
PROVIDE DETAILS FOR ANY AUTOMATIC RENEWALS OR EXTENSIONS BELOW:
N/A
EXPIRATION DATE: PURGE DATE: 06/30/2033
If there is no expiration/purge date, enter 9999 as the year for open-ended contracts AND explain the
process below on how or when it should be flagged for review.
Completion of Sampling and Reporting
Rev. 04/09/2025
KODIAK ISLAND BOROUGH
Contractor Change Order Form
Contractor Name
Jacobs Engineering
Contract No.
FY2024-32
Change Order No.
01
Project Title
2025 Surface Water Monitoring Support
Funding No.
530.731.702.430.140 — Contracted Services
Financial Impact
Original Contract Award
$13,746.00
Amount
Current PO Amount
$4,949.25 *One of the invoices was paid via check request —
Remaining
that is why we have a PO amount that is slightly more than what
is stated on the project by the contractor.
Proposed Change Order
$5,604.00
Amount
Percentage (%) Contract
40.76%
Change
New PO Total Amount
$10,553.25
New Total Contract Amount
$199350.00
Reason for Change Order:
This work is a continuation of Surface Water Monitoring Reporting Services carried from the fall of 2024
into the spring of 2025. The additional work is outlined by the following:
a) Reviewing the analytical data from the lab, supporting coordination of any necessary corrections with KIB's
laboratory, and providing a Data Quality Evaluation and ADEC data review checklist.
b) Providing minor figure updates, if necessary.
c) Review of Mann -Kendall analysis results (analysis conducted by Jena Hassinger, using tool provided by Jacobs).
d) Maintaining the data warehouse by updating with spring 2025 electronic data and using the warehouse to provide
current and historical data tables for the report. Any updates to surface water quality standards can also be
incorporated in the warehouse for accurate identification of"exceedances."
Deliverables:
Data Quality Review (draft and final)
Revised Figure 1 (if needed), in pdf format (up to 2 revisions per report)
Comprehensive historical tables and/or current data tables in Excel, formatted for print to
Approval Signatures
Contractor Representative
C41—
ProjoLft Manager Cod l A41fn
alWAA,
Borough Manager K1 we' w ` a S
TTEST.
` r
Nova M. Javier, MMC
Boroughrr,Cler
DATE: V 0
June 7, 2025
Date
`z 5—
Date Date
O- I JUL- 25
Date VNN D e®�
D C%
O _
�gSKA
Fax 907.257.2000
Dave Conrad
Director, Engineering and Facilities Department
Kodiak Island Borough
710 Mill Bay Road
Kodiak, AK 99615
April 30, 2025
Subject: 2025 Spring Surface Water Monitoring Support
Dear Dave:
Jacobs Engineering Group Inc. (Jacobs), is pleased to submit this proposal for Kodiak Island Borough (KIB) landfill -
related services in support of the spring surface water monitoring report. This effort will support completion of
surface water monitoring reporting services for fiscal year 2025 (Kodiak PO 2025-11). Below is a more detailed
description of the task:
1) Support of 2025 Spring Surface Water Monitoring Report: Jacobs will provide support for surface water
monitoring reporting for the spring surface water sampling event by:
a) Reviewing the analytical data from the lab, supporting coordination of any necessary corrections with
KIB's laboratory, and providing a Data Quality Evaluation and ADEC data review checklist.
b) Providing minor figure updates, if necessary.
c) Review of Mann -Kendall analysis results (analysis conducted by Jena Hassinger, using tool provided by
Jacobs).
d) Maintaining the data warehouse by updating with spring 2025 electronic data and using the warehouse to
provide current and historical data tables for the report. Any updates to surface water quality standards
can also be incorporated in the warehouse for accurate identification of "exceed ances."
Assumptions:
KIB will be the primary author of the main text, and will manage editing, final assembly, and delivery of the
monitoring reports to ADEC. KIB will also incorporate new data into the Mann -Kendall excel tool.
Deliverables:
• Data Quality Review (draft and final)
• Revised Figure 1 (if needed), in pdf format (up to 2 revisions per report)
• Comprehensive historical tables and/or current data tables in Excel, formatted for print to pdf
We propose to complete this work on a time and materials basis, in accordance with the previously provided terms
and conditions in the Agreement for Professional Services, dated March 29, 2024 in place for current purchase
order (PO) 2025-11. Rates for Jacobs staff categories who will support the above tasks will also be consistent with
those provided on March 29, 2024 with the surface water proposal for Spring and Fall 2024 events. The estimated
total price for these tasks is $5,604 (to be added to the remaining fee of $4,289 on PO 2025-11, see Table 1 below).
For clarification purposes, Jacobs Engineering Group Inc. (an affiliate of CH21VI HILL Engineers, Inc.) is the applicable
Jacobs legal entity to receive the award based on this proposal.
JACOBS ENGINEERING GROUP INC. - CONFIDENTIAL AND PROPRIETARY INFORMATION
Contract FY2024-32, CO#1 Jacobs
7
949 E. 36th Avenue, Suite 500
acobs
Anchorarage, AK 99508
Tel 907.762.1500
Fax 907.257.2000
Dave Conrad
Director, Engineering and Facilities Department
Kodiak Island Borough
710 Mill Bay Road
Kodiak, AK 99615
April 30, 2025
Subject: 2025 Spring Surface Water Monitoring Support
Dear Dave:
Jacobs Engineering Group Inc. (Jacobs), is pleased to submit this proposal for Kodiak Island Borough (KIB) landfill -
related services in support of the spring surface water monitoring report. This effort will support completion of
surface water monitoring reporting services for fiscal year 2025 (Kodiak PO 2025-11). Below is a more detailed
description of the task:
1) Support of 2025 Spring Surface Water Monitoring Report: Jacobs will provide support for surface water
monitoring reporting for the spring surface water sampling event by:
a) Reviewing the analytical data from the lab, supporting coordination of any necessary corrections with
KIB's laboratory, and providing a Data Quality Evaluation and ADEC data review checklist.
b) Providing minor figure updates, if necessary.
c) Review of Mann -Kendall analysis results (analysis conducted by Jena Hassinger, using tool provided by
Jacobs).
d) Maintaining the data warehouse by updating with spring 2025 electronic data and using the warehouse to
provide current and historical data tables for the report. Any updates to surface water quality standards
can also be incorporated in the warehouse for accurate identification of "exceed ances."
Assumptions:
KIB will be the primary author of the main text, and will manage editing, final assembly, and delivery of the
monitoring reports to ADEC. KIB will also incorporate new data into the Mann -Kendall excel tool.
Deliverables:
• Data Quality Review (draft and final)
• Revised Figure 1 (if needed), in pdf format (up to 2 revisions per report)
• Comprehensive historical tables and/or current data tables in Excel, formatted for print to pdf
We propose to complete this work on a time and materials basis, in accordance with the previously provided terms
and conditions in the Agreement for Professional Services, dated March 29, 2024 in place for current purchase
order (PO) 2025-11. Rates for Jacobs staff categories who will support the above tasks will also be consistent with
those provided on March 29, 2024 with the surface water proposal for Spring and Fall 2024 events. The estimated
total price for these tasks is $5,604 (to be added to the remaining fee of $4,289 on PO 2025-11, see Table 1 below).
For clarification purposes, Jacobs Engineering Group Inc. (an affiliate of CH21VI HILL Engineers, Inc.) is the applicable
Jacobs legal entity to receive the award based on this proposal.
JACOBS ENGINEERING GROUP INC. - CONFIDENTIAL AND PROPRIETARY INFORMATION
:,acobs
Table 1 Proposed update to PO 2025-11
Jacobs
949 E. 36th Avenue, Suite 500
Anchorage, AK 99508
Tel 907.762.1500
Fax 907.257.2000
Description
Amount
Notes
Original PO 2024-109 Value
$13,746
For support of two monitoring events and "miscellaneous support)
Current Fee Remaining on
$4,289
Includes limited hours to help address potential regulatory
2025-11
comments on 2024 reports, and "miscellaneous support" to be used
on an "as -needed" basis.
Proposed Additional Fee
$5,604
New, for support of the 2025 spring surface water monitoring
reporting effort.
Revised PO 2025-11 Value
$19,350
Original PO 2024-109 value plus the proposed additional fee.
Revised Fee Remaining for
$9,893
Fee remaining with proposed additional and remaining balance on
PO 2025-11
PO 2025-11
This proposal is valid for 60 days. If you have any questions about this, please contact me at (907) 440-7662.
Sincerely,
Jacobs Engineering Group, Inc.
Stacey Kehne
Project Manager
duA", 1�'�VVNI�WVO
Aimee Williams,
Borough Manager
Nova M. Javier
Borough Clerk NND &®
Mary Beth Baxter
Manager of Projects
6-7,1Kl.2S
Date
b (?� loTe61--
Date
JACOBS ENGINEERING GROUP INC. - CONFIDENTIAL AND PROPRIETARY INFORMATION
Kodiak Island Borough
Assembly Newsletter
Vol. FY2026, No. 01 July 04, 2025
At Its Regular Meeting Of July 3, 2025, The Kodiak Island Borough Assembly Took The Following
Actions. The Next Regular Meeting Of The Borough Assembly Is Scheduled On Thursday, July 17, 2025,
At 6:30 p.m. In The Borough Assembly Chambers.
AUTHORIZED The Borough Manager To Execute Contract No. FY2024-32, Change Order #1, With
Jacobs Engineering For The Spring 2025 Surface Water Monitoring Support In An Amount Not To Exceed
$19,350
ADOPTED Resolution No. FY2025-21A, Amending The Membership Of The North Star School Facility
Work Group
ADOPTED Resolution No. FY2025-26, Authorizing The Borough Manager To Accept The Alaska
Community Foundation Grant For The Fire Protection Area No. 1 (Bayside Volunteer Fire Department)
Kids Fire Camp
ADOPTED Resolution No. FY2026-02A, Amending Resolution No. FY2026-02 To Clarify The Oil and
Liquid Waste Descriptions On The Kodiak Island Borough Fee Schedule
ADOPTED Resolution No. FY2026-03, A Joint Resolution Of The Kodiak Island Borough Assembly And
City Council Appointing Two Members To The Kodiak Fisheries Development Association's Board Of
Directors
ADVANCED Ordinance No. FY2026-03, Amending Various Sections of Kodiak Island Borough Code
Title 17 Zoning To Define Pet -Related Uses And To Locate These Uses In Specific Zoning Districts As
Either Permitted Uses Or Conditional Uses To Public Hearing At The Next Regular Meeting Of The
Assembly
View our website: Visit our Facebook page:
www.kodiakak.us www.facebook.com/KodiakislandBorough
CONTRACT TRANSMITTAL FORM
RETENTION SCHEDULE: CL -09 CONTRACTS
Records related to obligations under contracts, leases, and other agreements between the borough and
outside parties, successful bids, and proposals. Each department maintains the file while the contract is active.
once inactive, retain procurements for another 4 years and retain contracts, leases, or agreements involving
real property for another 11 years.
DEPARTMENT: Engineering and Facilities
CONTRACT NO.: FY2024-32
CONTRACT TITLE:
CONTACT PERSON: Patricia Valerlo
2024 Landfill/LTP Surface Water Monitoring Report
VENDOR OR SERVICE PROVIDER: Jacobs Engineering
Administrative contracts are contracts approved by the manager within the spending authority allowed by
code. Assembly approved contracts are beyond the manager's spending authority and require approval by
the Assembly during a meeting.
APPROVED BY: MANAGERO ASSEMBLY O
TYPE OF CONTRACT: Procurement
EXTENSION OPTIONS: N/A
EXPIRATION DATE:
DATE OF APPROVAL: 4/9/24
PURGE DATE FOR PROCUREMENT (Exp. + 4 yrs): 4/9/2028
OR
PURGE DATE FOR INVOLVING REAL PROPERTY (Exp. +11 yrs):
If there's no expiration date, give the process on how or when this record should be purged or flagged
for review. Added Purge Date - Its a procurement of a report.
FILL OUT BELOW IF THE RECORD AMENDS, EXTENDS, OR IS A CHANGE ORDER TO A CONTRACT
CATEGORY: Select Category
APPROVED BY: MANAGER O ASSEMBLY O DATE OF APPROVAL:
TYPE OF CONTRACT: Procurement
EXTENSION OPTIONS:
EXPIRATION DATE:
PURGE DATE FOR PROCUREMENT (Exp. + 4 yrs):
OR
PURGE DATE FOR INVOLVING REAL PROPERTY (Exp. +11 yrs):
If there's no expiration date, give the process on how or when this record should be purged or
flagged for review.
\\dove\borough\CL\U - RECORDS\FORMS\contract transmittal form NJ.docx Rev. 12/23
Contract FY2024-32
:
,acobs
Dave Conrad
Director, Engineering and Facilities Department
Kodiak Island Borough
710 Mill Bay Road
Kodiak, AK 99615
March 29, 2024
Subject: 2024 Surface Water Monitoring Support
Dear Dave:
Jacobs
949 E. 36th Avenue, Suite 500
Anchorage, AK 99508
Tel 907.762.1500
Fax 907.257.2000
Jacobs Engineering Group Inc. (Jacobs), is pleased to submit this proposal for Kodiak Island Borough (KIB) landfill -
related services in support of surface water monitoring reports and ongoing compliance support. Below is a more
detailed description of the tasks:
1) Support of Surface Water Monitoring Reports (Spring and Fall events, 2024): Jacobs will provide support for
surface water monitoring reporting for both spring and fall surface water sampling events by:
a) Reviewing the analytical data from the lab, supporting coordination of any necessary corrections with
KIB's laboratory, and providing a Data Quality Evaluation and ADEC data review checklist.
b) Providing minor figure updates, if necessary.
c) Review of Mann -Kendall analysis results (analysis conducted by Jena Hassinger, using tool provided by
Jacobs).
d) Maintaining the data warehouse by updating with 2024 electronic data and using the warehouse to
provide current and historical data tables for the report. Any updates to surface water quality standards
can also be incorporated in the warehouse for accurate identification of "exceed ances."
Assumptions:
KIB will be the primary author of the main text, and will manage editing, final assembly, and delivery of the
monitoring reports to ADEC. KIB will also incorporate new data into the Mann -Kendall excel tool.
Deliverables:
• Data Quality Review (draft and final)
• Revised Figure 1 (if needed), in pdf format (up to 2 revisions per report)
• Comprehensive historical tables and/or current data tables in Excel, formatted for print to pdf
2) Ongoing Compliance Support Jacobs proposes this budget to respond to minor compliance questions and
issues related to landfill monitoring, design, and operations as they may arise. Support tasks may include
responding to KIB's (or ADEC's) questions by locating and providing information from historical KIB documents
(historical data in the data warehouse, plans, reports, meeting notes, and correspondence) and regulatory
codes and guidance. This task may include meetings with KIB, ADEC, laboratory (for issues not directly related
to surface water monitoring under Task 1), and Jacobs staff (via teleconference, no travel is expected). This
task is not intended to provide funding for new, independent tasks, but may support limited, high-level
scoping of new tasks.
JACOBS ENGINEERING GROUP INC. - CONFIDENTIAL AND PROPRIETARY INFORMATION
Jacobs
Jacobs
949 E. 36th Avenue, Suite 500
Anchorage, AK 99508
Tel 907.762.1500
Fax 907.257.2000
Assumoltions: Rough estimate of two hours total for Cory Hinds, six for Berney Kidd and one hour per month
for Stacey Kehne for remainder of 2024. Actual support hours per month will vary based on KIB needs. Any
budget remaining after task 1 is completed may also be used for ongoing compliance support.
Deliverables: If meetings are held (with KIB and/or ADEC or others), Jacobs will provide electronic meeting
notes (email or Word format) to document discussions and action items.
We propose to complete this work on a time and materials basis, in accordance with the terms and conditions in
the attached Agreement for Professional Services, dated March 29, 2024 (Attachment 1). Rates for Jacobs staff
categories who will support the above tasks is provided in Attachment 2. The estimated total price for these tasks
is $13,746. For clarification purposes, Jacobs Engineering Group Inc. (an affiliate of CH2M HILL Engineers, Inc.) is
the applicable Jacobs legal entity to receive the award based on this proposal. This proposal is valid for 60 days. If
you have any questions about this, please contact me at (907) 440-7662.
Sincerely,
Jacobs Engineering Group, Inc.
Stacey Kehne Josh Lawson
Project Manager Manager of Projects
JACOBS ENGINEERING GROUP INC. - CONFIDENTIAL AND PROPRIETARY INFORMATION
Jacobs
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
JACOB'S OFFICE ADDRESS:
949 E. 36th Avenue, Suite 500, Anchorage, AK 99517
JACOB'S PROJECT NO.:
TBD
PROJECT NAME:
2024 Surface Water Monitoring Support
CLIENT:
Kodiak Island Borough
CLIENT'S ADDRESS:
710 Mill Bay Road, Kodiak, AK 99615
CLIENT requests and authorizes Jacobs Engineering Group Inc.. (hereinafter "CONSULTANT") to perform the following
Services:
CONSULTANT in support of the Client shall provide Engineering/Consulting services at the request of the Client and in
accordance with CONSULTANT's Proposal dated March 29, 2024 , attached hereto.
Compensation
Compensation by CLIENT to CONSULTANT will be on the basis of time and materials. It is not expected that
subcontractors or expenses will be needed for this support, but in case they are, markup on subcontracts and direct
expenses will be as proposed in the attached Provisions. The total estimated cost shall not exceed the amount shown in
the attached letter proposal without agreement and authorization by both parties. Invoices will be provided monthly.
CONSULTANT agrees not to incur costs in excess any Not to Exceed value set forth in the proposal without prior approval
of the Client.
As outlined in the attached Proposal.
Other Terms
The CONSULTANT Technical Point of Contact for this Agreement shall be: Stacey Kehne
The Client Technical Point(s) of Contact for this Agreement shall be: Jena Hassinger
Services covered by this AGREEMENT will be performed in accordance with the Provisions and any attachments or
schedules. This AGREEMENT supersedes all prior agreements and understandings and may only be changed by written
amendment executed by both parties.
CLIENT: (`v� t �.iL �Sla �d tRb`(t%U
Signature
Name (printed) A,�vv�e-e- \-\j t l (,c
Titley ctic�Z
Date �� VZ -
FORM 124
REVISED: 11/09
Jacobs Engineering Group Inc.
Signature
Name (printed) osh Lawson
Title Manager of Projects
Date March 29, 2024
PROVISIONS
1. Authorization to Proceed
Execution of this AGREEMENT by CLIENT will be authorization
for Jacobs Engineering Group (Jacobs) to proceed with the
Services, unless otherwise provided for in this AGREEMENT.
2. Salary Costs
JACOBS's and its affiliated companies' Salary Costs, when the
basis of compensation, are the amount of wages or salaries paid
JACOBS employees for work directly performed on the Project
plus a percentage applied to all such wages or salaries to cover
all payroll -related taxes, payments, premiums, and benefits.
3. Per Diem Rates
JACOBS's and its affiliated companies' Per Diem Rates, when the
basis of compensation, are those hourly or daily rates charged for
work performed on the Project by JACOBS employees. These
rates are contained in Exhibit A and are subject to a 4% annual
calendar year escalation/adjustment.
4. Subcontracts and Direct Expenses
When Services are performed on a cost reimbursement basis, a
markup of _10_ percent will be applied to subcontracts and
outside services and a markup of _0_ percent will be applied
to Direct Expenses. For purposes of this AGREEMENT, Direct
Expenses are defined to include those necessary costs and
charges incurred for the Project including, but not limited to: (1)
the direct costs of transportation, meals, lodging, shipping,
equipment and supplies; (2) JACOBS's current standard rate
charges for direct use of JACOBS's vehicles, laboratory test and
analysis, and certain field equipment; and (3) JACOBS's standard
project charges for computing systems, and health and safety
requirements of OSHA.
All sales, use, value added, business transfer, gross receipts, or
other similar taxes will be added to JACOBS's compensation
when invoicing CLIENT.
5. Cost Opinions
Any cost opinions or Project economic evaluations provided by
JACOBS will be on a basis of experience and judgment, but,
since JACOBS has no control over market conditions or bidding
procedures, JACOBS cannot warrant that bids, ultimate
construction cost, or Project economics will not vary from these
opinions.
6. Standard of Care
The standard of care applicable to JACOBS's services will be the
degree of skill and diligence normally employed by professional
engineers or consultants performing the same or similar services
at the time JACOBS's services are performed. JACOBS will re-
perform any services not meeting this standard without additional
compensation.
7. Termination
This AGREEMENT may be terminated for convenience on 30
days written notice or if either party fails substantially to perform
through no fault of the other and does not commence correction
of such nonperformance within 5 days of written notice and
diligently complete the correction thereafter. On termination,
JACOBS will be paid for all authorized work performed up to the
termination date plus termination expenses, such as, but not
limited to, reassignment of personnel, subcontract termination
costs, and related closeout costs.
8. Payment to JACOBS
Monthly invoices will be issued by JACOBS for all Services
performed under this AGREEMENT. CLIENT shall pay each
invoice within 30 days. Interest at a rate of 1-1/2 percent per
month will be charged on all past -due amounts.
In the event of a disputed billing, only that disputed portion will be
withheld from payment, and the undisputed portion will be paid.
CLIENT will exercise reasonableness in disputing any bill or
portion thereof. No interest will accrue on any disputed portion of
the billing until mutually resolved.
FORM 124
REVISED: 11/09
9. Limitation of Liability
JACOBS's liability for CLIENT's damages will, in the aggregate,
not exceed the value of the Services. This Provision takes
precedence over any conflicting Provision of this AGREEMENT or
any document incorporated into it or referenced by it.
In no event shall JACOBS, its affiliated corporations, officers,
employees, or any of its subcontractors be liable for any incidental,
indirect, special, punitive, economic or consequential damages,
including but not limited to loss of revenue or profits, suffered or
incurred by CLIENT or any of its agents, including other contractors
engaged at the project site, as a result of this Agreement or
JACOBS's performance or non-performance of services pursuant to
this Agreement.
Limitations of liability provided herein will apply whether
JACOBS's liability arises under breach of contract or warranty;
tort, including negligence; strict liability; statutory liability; or any
other cause of action, and shall include JACOBS's officers,
affiliated corporations, employees, and subcontractors.
10. Severability and Survival
If any of the provisions contained in this AGREEMENT are held
illegal, invalid or unenforceable, the other provisions shall remain
in full effect. Limitations of liability shall survive termination of this
AGREEMENT for any cause.
11. No Third Party Beneficiaries
This AGREEMENT gives no rights or benefits to anyone other
than CLIENT and JACOBS and has no third party beneficiaries
except as provided in Provision 10.
12. Materials and Samples
Any items, substances, materials, or samples removed from the
Project site for testing, analysis, or other evaluation will be
returned to the Project site unless agreed to otherwise. CLIENT
recognizes and agrees that JACOBS is acting as a bailee and at
no time assumes title to said items, substances, materials, or
samples. CLIENT recognizes that JACOBS assumes no risk
and/or liability for a waste or hazardous waste site originated by
other than JACOBS.
13. Assignments
Neither party shall have the power to or will assign any of the
duties or rights or any claim arising out of or related to this
AGREEMENT, whether arising in tort, contract or otherwise,
without the written consent of the other party. Any unauthorized
assignment is void and unenforceable.
14. Integration
This AGREEMENT incorporates all previous communications and
negotiations and constitutes the entire agreement of the parties.
If CLIENT issues a Purchase Order in conjunction with
performance of the Services, general or standard terms and
conditions on the Purchase Order do not apply to this
AGREEMENT.
15. Force Majeure
If performance of the Services is affected by causes beyond
JACOBS's reasonable control, project schedule and
compensation shall be equitably adjusted.
16. Dispute Resolution
The parties will use their best efforts to resolve amicably any
dispute, including use of alternative dispute resolution options.
17. Changes
CLIENT may make or approve changes within the general Scope
of Services in this AGREEMENT. If such changes affect
JACOBS's cost of or time required for performance of the
services, an equitable adjustment will be made through an
amendment to this AGREEMENT.
18. Indemnification
JACOBS agrees to indemnify CLIENT for any claims, damages,
losses, and costs, including, but not limited to, attorney's fees and
litigation costs, arising out of claims by third parties for property
damage or bodily injury, including death, to the proportionate
extent caused by the negligence or willful misconduct of
JACOBS, JACOBS's employees, affiliated corporations, and
subcontractors in connection with the Project.
CLIENT agrees to indemnify JACOBS from any claims, damages,
losses, and costs, including, but not limited to, attorney's fees and
litigation costs, arising out of claims by third parties for property
damage or bodily injury, including death, to the proportionate
extent caused by the negligence or willful misconduct of CLIENT,
or its employees or contractors in connection with the Project.
19. Reuse of Project Documents
All reports, drawings, specifications, documents, and other
deliverables of JACOBS, whether in hard copy or in electronic
form, are instruments of service for this Project, whether the
Project is completed or not. CLIENT agrees to indemnify
JACOBS and its officers, employees, subcontractors and affiliated
corporations from all claims, damages, losses, and costs,
including, but not limited to, litigation expenses and attorney's
fees arising out of or related to the unauthorized reuse, change or
alteration of these Project documents.
20. Client -Furnished Data
CLIENT will provide to JACOBS all data in CLIENT's possession
relating to JACOBS's services on the Project. JACOBS will
reasonably rely upon the accuracy, timeliness, and completeness
of the information provided by CLIENT.
21. Ownership of Work Product and Inventions
All of the work product of JACOBS in executing the Services shall
remain the property of JACOBS. CLIENT shall receive a
perpetual, royalty -free, non -transferable, non-exclusive license to
use the deliverables for the purpose for which they were intended.
Any inventions, patents, copyrights, computer software, or other
intellectual property developed during the course of, or as a result
of, the Services shall remain the property of JACOBS.
Attachment 2 - 2024 Labor Rates
Labor Category/Description
2024 Hourly
Principal Engineer/Scientist/Specialist
$208.00
Senior Engineer/Scientist/Specialist
$204.00
Associate Engineer/Scientist/Specialist
$181.00
Staff Engineer/Scientist/Specialist
$141.00
Technician III
$113.00
Technician II
$107.00
Technician 1
$102.00
Office/Administration/Accounting
$85.00