1982-11-23 Regular MeetingArchitectural Review Board - Minutes- November 23, 1982
The Architectural Review Board met at 7:30 P.M. on November 23, 1982
with the following persons present:
Wayne Coleman
Ron Chase
Lou Schneider
Art Bors
Scott Arndt
Jim Olson
John Witteveen
Ed Kozak
Dave Waldron
The three firms previously short listed for the High School Locker
Room Project were ranked in order of priority as GDM, Ellerbe and CTA.
The question of the status of legal action involving CTA was raised,
Dave Waldron explained that the Borough Assembly would make the decision
at the time of any proposed award.
Jim Olson made the motion seconded by Ed Kozak that the following list
of firms be recommended for selection for accomplishment of small
projects:
GDM (Studies $ Arch.) Paul D. Selberg (Arch. $ Parks)
Ellerbe (Full Service) Fryex,Pressley, Eng. (Mech/Elect)
ECI-Hyer (Studies $ Arch.) Shanlion $ Wilson (Soils)
Lane -Knorr -Plunkett (Full Service) R $ M (Soils)
CTA (Full Service)
Scott Arndt made the motion seconded by Ron Chase that the firms be
listed in alphabetical order as a priority listing. Passed.
CTA GDM
ECI-Hyer Lane -Knorr -Plunkett
Ellerbe R $ M
Fryer, Pressley Eng. Selberg
Shannon $ Wilson
Motion by Ron Chase seconded by Scott Arndt that the Borough Building
Residing Project colors be recommended as Fuller -O'Brien Warm-Glo
#645-11 ST with Fuller-OBrien Sierra Madre 645-06 ST as the trim. Passed.
The Facility Coordinator status report was reviewed.
Architectural Review Board
Architectural Review Board - Minutes - November 2, 1982
The Architectural Review Board
in the Borough Conference room.
attendance: David Waldron, Art
John Witteveen and Ed Kozak.
met at 7:30 p.m. on November 2,
The following persons were in
Bors, Scott Arndt, Jim Olson,
John Witteveen made a motion seconded by Jim Olson that the
Board recommend awarding the Borough Building residing job to
L.G. Schneider and Sons for $43,224. Motion passed.
John Witteveen made a motion seconded by Scott Arndt that action
be deferred on awarding the Hospital Alteration Project until we
obtain a full cost estimate. Motion passed.
Wayne oleman, hairman
Architectural Review Board