Loading...
FY2025-54 Chiniak School Painting Design With Jensen Yorba WallCONTRACTS TRANSMITTAL FORM RETENTION SCHEDULE: CL -09 CONTRACTS Records related to obligations under contracts, leases, and other agreements between the Borough and outside parties, successful bids, and proposals. Active records are kept by the corresponding department. Apply retention (plus 4 years) once contract or agreement expires, or once product is procured. Apply retention (plus 25 years) for agreements that involve real property. DATE: 04/10/25 TRANSMITTED BY: Patricia Valerlo DEPT: Engineering & Facilitie CONTRACT NO.: FY 2025-54 VENDOR OR CONTRACTOR: Jensen Yorba Wall CONTRACT TITLE(Please provide details that are available such as purpose and/or the amount): Chiniak School Painting Design With Jensen Yorba Wall Administrative contracts are contracts approved by the manager that are within the spending authority allowed by code. Assembly approved contracts are beyond the manager's spending authority and require approval by the Assembly during a meeting. APPROVED BY: Administrator DATE OF APPROVAL: 04/10/25 TYPE OF CONTRACT: Contract PROVIDE DETAILS FOR ANY AUTOMATIC RENEWALS OR EXTENSIONS BELOW: N/A Once Project is complete EXPIRATION OR REVIEW DATE: 04/10/2029 PURGE DATE: 04/10/9999 If there's no expiration date or the contract is open-ended, enter 9999 in the date field and explain when it should be flagged for review: This is the start of a project - not sure when it will be completed. Are all relevant attachments, exhibits, referenced documents attached? ❑1 Are the successful bids and proposals incorporated in the attachments? ONLY COMPLETE THIS SECTION IF THE RECORD AMENDS, EXTENDS, IS A CHANGE ORDER, OR AN ADDENDUM TO AN EXISTING CONTRACT m7_r N Z CONTRACT NO.: FY REQUESTED BY: CATEGORY: Select One APPROVED BY: Select One TYPE OF CONTRACT: Select One PROVIDE DETAILS FOR ANY AUTOMATIC RENEWALS OR EXTENSIONS BELOW: EXPIRATION DATE: PURGE DATE: If there is no expiration/purge date, enter 9999 as the year for open-ended contracts AND explain the process below on how or when it should be flagged for review. Rev. 04/09/2025 Jensen Contract No. FY2025-54 Yorba Wall Inc. 522 West 10th Street, Juneau, Alaska 99801 907.586.1070 jensenyorbawall.com Designing Community Since 1935 Date: April 3, 2025 To: Codi Allen From: Corey Wall Re: KIB Chiniak School Painting (JYW No. 25014) Design Fee Proposal & Scope Please find attached a fee proposal for design documents for the Chiniak School Painting Project. The project will consist of preparation and repainting of the existing Chiniak School, including wood siding and metal mechanical hoods and louvers. The design documents will include new notations on the existing, scaled PDF drawings of the school. Exclusions & Notes: • Replacement of any architectural items, including doors, flashings, roofings, etc., is not anticipated. • Painting of pre -finished items, including doors, windows, flashings, and roofing, is not anticipated. • Replacement or treatment of rotten / deteriorated siding is not anticipated. • Painting of other buildings on the site, including the Teacherage and Water Treatment Building, is not included. • The documents will be based on information gathered during the 9/2024 site visit. Additional site visits by the design team are not anticipated. • Limited CA services—including submittal review and RFI responses—are included on a Time & Materials basis. On-site observations and inspections are not included with the assumption this work will be done by KIB staff. Thanks again for letting us assist you. Total Cost of $14,168.00 Corey Wall, JYW Nova M. Javier, Borough Cle _4.9.2025_ Date 10 kpr-2s Date !off Date Jensen Yorba Wall Architecture Interior Design Construction Management page 1 of 1 DESIGN SERVICES PROPOSAL SUMMARY Project: KIB Chiniak School Painting Jensen 000 Yorba ■■■ Wall ■■■ Inc. 000 Jrvv Project No.: /- Ulf+ SERVICES FEE TYPE EXPENSES TAX TOTAL Pre -Design / Site Investigation $0 Lump sum $0 $0 $0 Conceptual Design $0 Lump sum $0 $0 $0 Schematic Design $0 Lump sum $0 $0 $0 Design Development $0 Lump sum $0 $0 $0 Construction Documents $9,208 Lump sum $0 $0 $9,208 Bidding $0 TBD $0 $0 $0 Bidding / Construction Administration $4,960 T&M $0 $0 $4,960 Construction Observations $0 TBD $0 $0 $0 TOTAL $14,168 G:\—Projects\25014\0 Scope & Fee\KIB Chiniak School Painting FEES SUM 3 4/4/2025 DESIGN SERVICES PROPOSAL CONSTRUCTION DOCUMENTS SERVICES Project: KIB Chiniak School Painting JYW Project No.: 25014 Jensen Yorba Wall Inc. STAFF: Architect Interior Design Construction Manage Drafter Exec A Cler A ACC TOTAL PMgr A -III A-11 A -I Int III Int II ID -III ID -11 ID -1 CM -III CM -II CM -1 D-11 D -I EA CA 1 A $199 $147 $131 $125 $100 $90 $153 $121 $90 $165 $131 $100 $104 $70 $84 $42 $85 AKLHI I ILLI UKt: Project Management Research Drawings Base Plans, Elevations Final Drawings Specifications Meetings / Review QC Subtotal Ho Subtotal Dollar CONSULTANTS: Civil Engineering Structural Engineering Mechanical Engineering Electrical Engineering Hazardous Materials Engineering Landscape Architecture Cost Estimating Subtotal $0 Overhead/Profit 10% $0 Consultants Total Labor $0 Subtotal Design Development Services LABOR $9,208 Subtotal Design Development Services REIMBURSABLES (see attached) $0 TOTAL CONSTRUCTION DOCUMENTS SERVICES FEE (Time & Expense) $9,208 KIB Chiniak School Painting FEES -50 CD 10 4/4/2025 DESIGN SERVICES PROPOSAL CONSTRUCTION ADMINISTRATION SERVICES Project: KIB Chiniak School Painting JYW Project No.: 25014 Jensen ■■■ Yorba 000 Wall ■■■ Inc. O■■ STAFF: Architect Interior Design Construction Manage Drafter Exec A Cler A ACC TOTAL PMgr A -III A -II A-1 Int III Int II ID -III ID -II ID -1 CM -III CM -II CM -1 D-11 D -I EA CA 1 A $199 $147 $131 $125 1 $100 $90 $153 $121 $90 $165 1 $131 $100 $104 $70 $84 $42 $85 AKLH1 I tC I UKt: Bidding Pre -Bid Conference Clarifications Construction Admin RFIs/RFPs/CO'S Submittal Review Close-out Subtotal Hours Subtotal Dollars $ CONSULTANTS: Civil Engineering Structural Engineering Mechanical Engineering Electrical Engineering Hazardous Materials Engineering Landscape Architecture Subtotal $0 Overhead/Profit 10% $0 Consultants Total Labor $0 Subtotal Construction Administration Services LABOR $4,960 Subtotal Construction Administration Services REIMBURSABLES (see attached) $0 TOTAL CONSTRUCTION ADMINISTRATION SERVICES FEE $4,960 KIB Chiniak School Painting FEES -70 CA 12 4/4/2025