KODIAK ISLAND BOROUGH
RESOLUTION NO. FY2025-16
A RESOLUTION OF THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH ADOPTING A
STATE LEGISLATIVE CAPITAL IMPROVEMENT PROJECTS PRIORITY LIST FOR THE 2025
LEGISLATIVE SESSION
WHEREAS, the Kodiak Island Borough represents approximately 12,721 residents of the
Kodiak Island Archipelago living in six incorporated cities and one community governed by a tribal
council government per the Alaska Department of Labor and Work Force Development; and
WHEREAS, a Borough —wide capital improvement program has been adopted by the Kodiak
Island Borough Planning and Zoning Commission which identifies major needs of the island
community for the next five years; and
WHEREAS, the Kodiak Island Borough Assembly has reviewed the borough -wide capital
improvement program adopted by the Planning and Zoning Commission and identified major
projects to submit to the Alaska Governor, State Legislative Delegation, and Federal Legislative
Delegation for funding consideration.
NOW, THEREFORE, BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND
BOROUGH that:
Section 1: The Kodiak Island Borough's State Legislative capital improvement project
priorities (unranked) for the 2025 legislative session are as follows:
• Kodiak Wastewater Treatment Plant Facility
Estimated Project Cost $1,900,000
Funding Acquired $100,000
Needed Funds $1,800,000
The City of Kodiak provides water and sewer services to the Kodiak Island Borough
residences and businesses that are located adjacent to City of Kodiak boundaries. The City
of Kodiak treatment plant operates under an Alaskan Department of Environmental
Conservation (ADEC) APDES permits. The first phase of a larger project to upgrade the City
of Kodiak Wastewater Treatment Plant to evaluate the facility for immediate system's needs.
The last major maintenance upgrades to the facility was in 1999. The condition and evaluation
assessment included all major components within the plant interior and exterior, the
outbuildings and three aeration basins; including all mechanical equipment needs. Alaska
Pollutant Discharge Elimination System (APDES) permitting requirements were included
during this assessment. Included in the facility rebuild assessment is the supervisory control
and data acquisition (SCADA) system to interface with the 34 sewer lift station pumps and
waste treatment at the facility. This facility, with its labyrinth of connecting sewer lines, directly
Resolution No. FY2025-16 Page 1 of 8
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
serves 2667 City of Kodiak and Kodiak Borough households including commercial
businesses. The treatment plant also serves the U.S. Kodiak Coast Guard Base and the
Pacific Spaceport Complex indirectly with our certified laboratory testing and waste disposal;
not to mention NOAA vessels, the Alaska Marine Highway vessels and the expanding cruise
ship industry stopovers in our Kodiak Harbors.
The Kodiak Island Borough supports the City of Kodiak request for Federal funding in the
amount of $1.9M to begin design efforts leading to the construction of this critical infrastructure
Wastewater Treatment Plant project that will support the wastewater needs of the community
for the next twenty years.
• St. Herman Harbor Infrastructure Replacement
Phase 1 $10,000,000
St. Herman Harbor (SHH) was built by the State of Alaska in 1982 and has been a vital facility
for Kodiak's large and diverse commercial fishing, logistics, and subsistence fleet for over 40
years. The State of Alaska turned over all state owned facilities in St. Herman Harbor to the
City of Kodiak in 1999. The facility provides safe moorage for more than 400 vessels from
local, other Alaskan communities and the West Coast. With the exception of a few minor
upgrades over the years, and annual maintenance the original float system is beyond its useful
life and is in need of replacement.
The proposed project would result in the reconstruction of St. Herman Harbor with the
replacement of most of its float system in two phases. Currently, the harbor has been losing
use of multiple floats per year due to aging and the saltwater elements, and increased storm
activity, both in frequency and severity. Any float loss results in 2 vessel berths along with the
revenue generated for the harbor. This rate of failure has increased exponentially in recent
years as the existing docks further deteriorate. The latest inspection report shows many
portions of the facility are in very poor condition. The forty -year -old float systems suffer from
failing pilings, broken concrete decking, rotting walers and bull rails, and an outdated electrical
system. These floats contain non -compliant electrical pedestals, failed fire suppression lines,
no blackwater services and inconsistent potable water availability.
In 202Z the City contracted with PND Engineers, Inc. (PND) to prepare a St. Herman Harbor
Planning and Scoping Report that includes concept harbor layouts, cost estimates and
construction phasing recommendations. The harbor replacement is scheduled in two phases,
with the City funding of $1,900,000 to begin the project. Total estimated cost is at $73-99
million.
In the fall of 2024, the City was awarded a $11,250,000 grant from MARAD's Port
Infrastructure Development Program to be used for phase one of the project. Phase one will
see construction of a new "O" float with critically needed large vessel (100-foot plus) berthing,
and a drive down dock capability. Initially, this float will be used to provide necessary berthing
Resolution No. FY2025-16
Page 2 of 8
I
F
L
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
ill
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
to facilitate the rebuild. Phase one is estimated at between $23-33 million. In 2023, Turnagain
Marine Construction was awarded a competitive contract to complete preliminary design and
environmental permitting for the harbor reconstruction with an estimated completion of early
2026. We would like to thank the Alaska Congressional Delegation for its support for this
project with the Dept. of Transportation and MARAD.
Pending in FY 2025 appropriations is $10 million in Congressionally Directed Spending in the
Senate Transportation -Housing Urban Development Appropriations Bill for the St. Herman
Harbor project. We would like to thank Senator Murkowski for requesting these funds. The
funds would be used to fund additional design and construction costs for Phase 1.
The City of Kodiak is requesting that the $10 million in Congressionally Directed Spending be
retained in the final FY 2025 appropriations bill, or if not rolled over into FY 2026.
Service Area Roads Improvements and Paving
Estimated Project Cost $6,000,000
Local Funds $1,200,000
Needed Funds $4,800,000
This project addresses the on -going need to improve portions of the roads in the Kodiak Island
Borough's Road service areas: Service Area No. 1, Womens Bay Service Area, Bay View
Road Service Area, and Monashka Bay Road Service Area. These roads connect residential
neighborhoods with the greater Kodiak community.
Paving projects will address main thoroughfares or busy neighborhood roads. Improvements
to major drainage courses, installation of guard rails, and other identified road improvement
needs may also be addressed with this funding.
Priorities for expenditure of these funds are determined by the road service area boards. Local
contributions to road improvements may be funded through local improvement districts where
those in the district are taxed a proportion of the project cost.
Hospital Facility Sterilizer and Boiler Replacement
Estimated Project Cost $10,000,000
Funding Acquired $0
Needed Funds $10,000,000
The Kodiak Island Borough owned hospital facility boilers and associated system components
are aging along with the facility. The system components that have been identified for major
repair or replacement include the oil -fired boilers, chiller unit, reverse osmosis water system,
steam generation equipment and sterilization equipment are in consideration. The oil -fired
boilers provide the major hydronic heating component for several associated systems at the
hospital facility. They include the production of facility heat, hot water and the hot water
Resolution No. FY2025-16
Page 3 of 8
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
component for conversion to steam via a steam generator that is distributed to the sterilizers
required for the hospital operations. The sterilizer equipment has been maintained at an
operational level. Due to the age of the existing equipment, increased frequent failures
associated with the steam generator and sterilization equipment has affected the operational
capacity of the hospital to the point where operating room availability is managed at times with
the functional capacity of the facility to ensure properly sterilized equipment. All of the system
components need to be evaluated for replacement timeframes as and of the individual
component failures may lead to services being suspended at the hospital facility.
• City of Larsen Bay Reservoir Spill Way
Estimated Project Cost $1,200,000
Funding Acquired $0
Needed Funds $1,200,000
The water reservoir spill way in the community of Larsen Bay is eroding and is nearing failure.
This reservoir provides drinking water and hydroelectric power to the residents in the second-
class city on Kodiak Island's west side. The Kodiak Island Borough supports the second-class
City of Larsen Bay's request for funding assistance.
• City of Port Lions Fire Station Insulation
Estimated Project Cost $35,000
Funding Acquired $0
Needed Funds $35,000
The fire station in the second-class City of Port Lions is not insulation which necessitates that
the fire truck be left empty of water during the winter months when temperatures drop below
freezing and limits the time and ability to respond to a fire related emergency. The City of Port
Lions requests funds for purchase and installation of building insulation materials.
• Kodiak Island Borough Fire and Rescue: Phase 1 Design and Engineering Re: Fire
Station Renovation and Expansion FY25
Estimated Project Cost $312,000
The proposed project shall include the following in Phase 1: Full design and engineer workup
to include shovel ready plan set and accompanying specification documents. The scope of
the project may include renovation of certain existing areas of the original 1983 fire station
building and training facility addition. The scope may further include expanding the footprint
and square footage of the original 1983 fire station building to include additional space capable
of sustaining the current response and service delivery model in keeping with an established
30 year strategic/fiscal plan. The expansion shall include additional square footage to the rear
of the existing kitchen, lavatory, and mechanical space and second floor living space. The
expansion may include space designed to support additional/upgraded lavatories and shower
facilities along with sleeping accommodations for volunteer duty officer-Oirefighters and
Resolution No. FY2025-16
Page 4 of 8
III
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
additional living and storage space to the second floor. Necessary code compliance work to
the existing structure shall be included in this project scope.
Kodiak Community Health Center Expansion
Estimated Total Project Cost
$25,850,000
Funding acquired
$8,317,901
Estimated Design Cost
$1,200,000
Needed Funds
$1,200,000
The Kodiak Community Health Center (KCHC) is currently housed within the Kodiak Island
Borough owned hospital facility and co -located with Providence Kodiak Island Medical Center.
KCHC is in need of increasing the clinic space and is planning an expansion project. Due to
various changes in the community in the past five years, patient and provider counts have
increased and pushed this organization to the maximum of their space limitations.
Additionally, an increase in patient population is expected to coincide with a local US Coast
Guard base increase in employees and their families in the next few years.
With appropriate funding KCHC proposes to expand and improve the clinic space and
continue to provide needed services in the Kodiak community. KCHC has acquired funding in
the amount of $8.3 million toward this project, however design activities are not eligible within
this funding. KCHC is seeking design funds in order to move forward with the project and will
continue fund raising efforts for the balance needed.
• City of Old Harbor Septic Tank Replacement
Estimated Project Cost $100,000
Funding Acquired $0
Needed Funds $100,000
The Kodiak Island Borough supports the City of Old Harbor's request for funding to Install a
sewer septic tank in downtown Old Harbor which is a second-class city within the Kodiak
Island Borough.
• Community of Karluk Water Tank Installation
Estimated Project Cost $250,000
Local Funds $0
Needed Funds $250,000
The water holding tank in the community of Karluk has been condemned by the DEC. The
Karluk IRA Tribal Council has a new water tank sitting in the Native Village of Karluk. The
Kodiak Island Borough supports this request for funds to install the water tank for the water
distribution to this community that lies within the Kodiak Island Borough.
• City of Larsen Bay Equipment Repairs and Maintenance
Resolution No. FY2025-16
Page 5 of 8
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
Estimated Project Cost $157,000
The City of Larsen Bay's existing equipment are all needing major parts and pieces maintained
and/or replaced. The City currently has a 1996 Caterpillar 12G Grader, a 2001 Caterpillar416
backhoe-Ioader4WD, and a 2001 Caterpillar D-4 Dozer. These pieces of equipment are vital
to the Community for water lines, power lines, road repairs, and maintenance, and is needed
to keep our city going.
• Women's Bay Service District: South Russian Creek Road Repaving FY25
Estimated Project Cost $1,842,301.30
The roadway was originally paved circa 1985 using mostly federal financing under the
Intermodal Service Transportation Efficiency Act. Since that time the roadway has been
maintained by the Womens Bay Service District with taxes collected from the residents for
that purpose. The Service District mill rate is currently 2.5 mils which is the highest of all
service districts. The current budget has barely been sufficient to keep roads cleared of snow
and ice and also maintain the 12 miles of road in the district. Over the years the maintenance
for the South Russian Creek Road paved area has increased as the asphalt has deteriorated
and at this time maintenance attempts are becoming futile and exponentially more expensive.
The estimate from Brechan Construction, LLC to repave the roadway is $1,842,301.30. If the
road is repaved, it would reduce the overall maintenance costs and allow the service district
to re -allocate money to other needed projects.
• City of Port Lions Water Distribution System Replacement
Estimated Project Cost $8,000,000
Funding Acquired $0.00
Needed Funds $8,000,000
The original water and sewer distribution system for our community was built after the 1964
Good Friday earthquake and tsunami forced the displaced residents of Afognak to relocate in
what is now known as Port Lions. In 1964, a new system was installed. However, the
contractor did not complete the job correctly. Many homes were not connected to the new
system and many homes were connected incorrectly. The now connected system is
considered aged out because it is over twenty-five years old. The City of Port Lions Public
Works crew constantly has a list of leaks and blockages to repair. In some places the system
is beyond repair. They are consistently over budget for water and sewer utility due to the
unexpected expense of purchasing parts and paying their crew to repair and replace section
of the distribution system. The outdated system drastically hinders community expansion
efforts. The City of Port Lions is working closely with the Alaska Native Tribal Health
Consortium (ANTHC) for replacement project to be included in their funding pipeline as soon
as possible.
• City of Larsen Bay: Water Distribution Lines
Estimated Project Cost $7,000,000
The City of Larsen Bay has a problem of leaks in the distribution system. They have a loss of
40,000 gallons of water every 24 hours, 7 days a week. They have fixed all the leaks they
could find. In the summer, they have a hard time keeping up with the water usage.
Resolution No. FY2025-16
I
1
L
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
• City of Larsen Bay: Upgrade City Hall
Estimated Project Cost $700,000
The City Hall building houses the Senior Center, Teen Center, Library, City Market, and City
offices. The building was originally built in 1985 and need numerous repairs. The kitchen in
the Senior Center is outdated, and cabinets are falling off. The entire building needs to be
rewired, replace light switches, outlets, flooring, windows, and doors. The roof needs repairs
and is unstable due to water damage. The inside and outside needs to be completely
repainted. The restrooms need to be updated and redesigned. All new plumbing needs to be
installed.
• Native Village of Karluk: Karluk Community Food Security Project FY25
Estimated Project Cost $139,444
The community of Karluk is requesting to construct two community greenhouses on land
owned by the tribe. The project is clear and significant priority for Karluk as food is limited.
Global warming is changing the ocean environment and impacting subsistence. Food is flown
to the community by small plane that are often delayed by weather and the cost is prohibitively
high and the food is mostly shelf stable, meaning highly processed and not the appropriate
food for the tribe. Karluk does not have gasoline for sale so the cost of subsistence has
become prohibitively high and harvesting subsistence fish and game by ATV or boat is nearly
impossible.
The Covid-19 pandemic emphasized the importance of food sovereignty for this remote
community. During the pandemic, supply chains were interrupted and the price for many
goods increased greatly. As remote as they are with high costs already, interruptions to supply
chains and increased prices were nearly impossible for the village to handle. Because of this,
they have renewed their efforts to grow fresh vegetables and fruits as they work to provide
consistent and traditional food for the village.
The proposed project is to purchase and construct two community greenhouses on land
owned by the tribe. The proposed site is Karluk Subdivision Tract C, Plat Number 78-16. The
tribe will be responsible for the upkeep and maintenance of the greenhouses. The
greenhouses will be constructed with guidance from the Alaska Energy Authority Biomass -
Heated Greenhouses: A Handbook for Alaskan Schools and Community Organizations and
the University of Alaska Fairbanks Master Gardener program; a Master Gardener assisted
Karluk with the development of this proposal. The two greenhouses will be 25' x 48' x 12.5,
made with heavy-duty galvanized steel frame and 10 mm double -wall polycarbonate panels,
2 doors and 2double-door gates (one on each end), and an arched design allows wind, snow
and hail to slide off. The greenhouse will support a snow load of 480 kg/m (98 psf) and is
wind -resistant up to 24m/s for high stability. The greenhouse is an expandable design. The
greenhouses will use a biomass boiler to heat the interior of the greenhouse each spring when
they begin planting.
This project will also include the purchase of shelving and supplies including soil, fertilizer,
water equipment, pots and stakes. The cost of freight to Karluk from Wasilla and the cost to
assemble the greenhouse is also included in the cost estimate. Greenhouses are priced
$29, 500 each and the boilers are priced at $8432 each. Shelving and supplies is estimated at
$3,000. The total cost of materials is $78,864. Freight is estimated at 50% ($39,432) and a
contingency is included of 15% to offset any increase in cost ($11,830). Total material cost is
Resolution No. FY2025-16
Page 7 of 8
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
estimated at $130,126. The cost of assembling the greenhouse is estimated at 80 hours for
three laborers at $35 per hour ($8,400) plus fringe at 10.93% ($918). The total project cost is
$139,444. The greenhouse will provide access to fresh healthy food which is at this time either
unavailable or prohibitively expensive and will improve the quality of life for all the residents
of Karluk.
Rehabilitation of Kodiak Island Borough Park
Estimated Project Cost $300,000
Funding Acquired $150,000
Needed Funds $150,000
Kodiak Island Borough has started a multi -year project to upgrade end of life playground
equipment, benches, picnic tables, and basketball courts. This project aims to provide multiple
areas for outdoor recreation in multiple areas across the borough.
ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH
THIS TWENTIETH DAY OF FEBRUARY, 2025
KODIAK ISLAND BOROUGH
A
Scott Arndt, Mayor
VOTES:
Ayes: Johnson, LeDoux, Smiley, and Whiteside
Absent: Ames, Griffin, and Sharratt
Resolution No. FY2025-16
M. Javier, MMC, Borough Clerk
Page 8 of 8