FY2025-09 KIB Baler Slab Replacement Design & CA Services with Jensen Yorba and WallCONTRACTS TRANSMIT 'AL FORM RETENTION SCHEDULE: CL -09 CONTRACTS Records related to obligations under contracts, leases, and other agreements between the Borough and outside parties, successful bids, and proposals. Active records are kept by the corresponding department. Apply retention (plus 4 years) once contract or agreement expires, or once product is procured. Apply retention (plus 25 years) for agreements that involve real property. DATE: 11/06/2024 REQUESTED BY: P. Valerio DEPARTMENT: Engineering & Facilities CONTRACT NO.: FY2025-09 VENDOR OR SERVICE PROVIDER: Jensen Yorba Wall CONTRACT TITLE: KIB Baler Slab Replacement Design & CA Services Administrative contracts are contracts approved by the manager within the spending authority allowed by code. Assembly approved contracts are beyond the manager's spending authority and require approval by the Assembly during a meeting. APPROVED BY: Administrator DATE OF APPROVAL: 7/17/24 TYPE OF CONTRACT: Contract PROVIDE DETAILS FOR ANY AUTOMATIC RENEWALS OR EXTENSIONS BELOW: Will be complete when Project is complete. EXPIRATION DATE: PURGE DATE: 07/17/2051 If there is no expiration/purge date, enter 9999 as the year for open-ended contracts AND explain the process below on how or when it should be flagged for review. FILL OUT BELOW IF THE RECORD AMENDS, EXTENDS, IS A CHANGE ORDER TO A CONTRACT, OR IS AN ADDENDUM TO A CONTRACT DATE: CONTRACT NO.: REQUESTED BY: CATEGORY: Select One APPROVED BY: Select One TYPE OF CONTRACT: Select One PROVIDE DETAILS FOR ANY AUTOMATIC RENEWALS OR EXTENSIONS BELOW: EXPIRATION DATE: PURGE DATE: If there is no expiration/purge date, enter 9999 as the year for open-ended contracts AND explain the process below on how or when it should be flagged for review. Y:\U - RECORDS\FORMS\20240802 Contracts Transmittal Form.docx Rev. 08/02/2024 Jensen CONTRACT FY2025-09 Yorba Wall Inc. 522 West 10th Street, Juneau, Alaska 99801 907.586.1070 jensenyorbawall.com Designing Community Since 1935 Date: February 26, 2024 To: Patricia Valerio From: Corey Wall Re: KIB Baler Building Slab Replacement (JYW No. 23017) Design Fee Proposal & Scope REVISED Please find attached a fee proposal for design work for the concrete slab replacement in the Baler Building. This work is a continuation of the site investigation work that Brian Neilsen from PND performed in July. Work in this proposal will include full design to allow for coordination with the local concrete contractors. Work will also include full design documentation in the form of drawings and material specifications. Please see PND's attached proposal for more detailed deliverable information. Exclusions: • Cost estimation is not included at this time. • Since the project may not need to proceed into a low bid, bid documents, including front end specifications, are not included at this time. • Bidding and construction administration services are not included at this time. Thanks again for letting us assist you. Jensen Yorba Wall Architecture Interior Design Construction Management page 1 of 1 • • • KODIAK ISLAND BOROUGH"' W KODIAK ISLAND BOROUGH Purchase Order 3 710 MILL BAY ROAD 710 MILL BAY ROAD No. 2025-00000012 $5,153.90 KODIAK, AK 99615 p KODIAK, AK 99615 o ATTN: ENGINEERING/FACILITIES DEPT ATTN: FINANCE DEPARTMENT DATE 07/17/2024 (907) 486-9343 (907) 486-9323 PURCHASE ORDER NUMBER MUST APPEAR ON ALL INVOICES, SHIPPERS, BILL OF LADING AND VENDOR 10475 - JENSEN YORBA WALL, INC CORRESPONDENCE DELIVER BY: 0 JENSEN YORBA WALL INC SHIP VIA: 522 WEST 10TH STREET FREIGHT TERMS: JUNEAU, AK 99801 PAGE: 1 of 1 n ORIGINATOR: Patricia Valerio Contract #/Reference: Contract FY2025-09 Baler Floor Slab Repalce. Design to 65% • • • • • 1.0000 Each Design Services -Baler Floor Slab Replacement Design to 65% for Review 530-731-701 430.144 - Design Services 5,153.90 5,153.9000 $5,153.90 SUBTOTAL SALES TAX TOTAL DUE $5,153.90 $0.00 $5,153.90 Special Instructions 1. Shipment maybe refused 3. Substitutions will not be if the Purchase Order Number accepted without prior is not shown on outside of package. approval. 2. Exemptfrom State/Local 4. Partial shipment will be and Federal taxes. accepted if invoiced separately. 5. C.O.D or collect shipments will not be accepted. 6. Receiving hours are 8:00 AM to 5:00 PM Monday - Friday. 7. An Equal Opportunity Employer. It is our policy to comply with all applicable State and Federal laws prohibiting discrimination in employment based on race, age, color, sex, religion, national origin, disability or other protected classification. J Q N O a O d N W U W V) Z cn W 0 I I 00 �I Ln Ln Ln Ln 00 M 00 00 i/} (9 0 Q Q) Z o > O u Q) U 41 00 > O on L Q N L OA 7 4J -OS-1 v v C C 00 W •�C .O1 Q W Q f0 d v7 U Q a u f0 Z LU U 'L V W Q L 7 Q 7 U U r�i L N C J> cv ai ro U Li G W 2 J U > Q Ln O U N Z 0 U IIIAAl11AA111 �■illlll■111111■@ 00 00 O O Ln Ln Ln Ln 00 M 00 00 i/} (9 0 Q Q) Z o > O u Q) U 41 00 > O on L Q N L OA 7 4J -OS-1 v v C C 00 W •�C .O1 Q W Q f0 d v7 U Q a u f0 Z LU U 'L V W Q L 7 Q 7 U U r�i L N C J> cv ai ro U Li G W 2 J U > Q Ln O U N Z 0 U W W 6L H W U W H N W 0 H Z CW G W U Q J �a O W (3) cc U m fD y., � N 4J vZ cn LU p J J 00 Q of m cr- m W 02J Ln Lu g UO E co J �' m -�E J Ln cn O MIL:1 M ENGINEERS, INC. February 9, 2024 Corey Wall Principal Architect Jensen Yorba Wall, Inc 522 Tenth Street Juneau, Alaska 99801 Re: Kodiak Baler Building — Slab Demolition and Overlay Structural Engineering Fee Proposal Dear Corey, PND 232056 PND Engineers, Inc. (PND) appreciates the opportunity to assist Jensen Yorba Wall QYW) on the Kodiak Baler Building project. We understand that the owner, Kodiak Island Borough (KIB), would like to retrofit the concrete slab in front of the baler. You would like PND to provide structural engineering design services. KIB would like to retrofit the existing concrete slab in front of the baler due to the wearing down of the top of the slab. The extent of the retrofit is shown in the attached conceptual plan. This slab was previously retrofitted in 2015, but has worn down to the existing embedded beams in the slab since then. The top flanges of the embedded beams have been cut due to the wear. The intent is to demo the top layer of the slab and pour a new overlay. PND will investigate durable mix designs that can be utilized effectively in Kodiak. PND's scope of work will include the following: 1) Develop a durable mix design that the local batch plant can supply. We anticipate a meeting with the batch plant to discuss potential admixtures. We expect that the mix design will include a dry shake hardener for the surface. The mix design will be included in a concrete specification. 2) Develop demolition specification 3) Develop drawings including a plan with demolition and overlay extents and details denoting the demolition and overlay thicknesses. 4) Remotely attend a demolition and a concrete preinstallation conference. Two one-hour meetings are assumed. 5) Respond to questions from contractor during construction. Four hours for answering questions is assumed. PND will provide a 65% design submittal for review. Following KIB review of the 65% design submittal, PND will prepare a 100% design submittal. Plans will be prepared in AutoCAD and will be suitable for building permit application, soliciting quotes from material suppliers, and for construction. Specifications will be included as structural general notes shown on the drawings. 9360 Glacier Hwy., Suite 100 • JUNEAU, ALASKA 99801 • Phone 907.586.2093 • Fax 907.586.2099 February 9, 2024 Kodiak Baler Building — Slab Demolition and Overlay Structural Engineering Fee Proposal Page 2 PND's scope of services will not include: A) General Condition specifications. B) Surveying. We assume KIB can provide spot elevations of the top of the slab at the limits of the demolition. C) Cost estimating. D) Site visits. A fee proposal can be provided for this service if desired. E) Construction administration and special inspection. A fee proposal can be provided for these services if desired. Fees PND proposes to perform the above outlined services for a fixed fee of $8,500. Schedule PND can commence work within one month of approval of our fee proposal. We anticipate our services for each submittal will take 3 weeks, not including owner review time. Thank you for considering PND Engineers for this project. If you have questions or need additional information, please feel free to contact me. We look forward to working with you. Sincerely, PND Engineers, Inc. I Juneau Office Brian Nielsen, RE, S.E. Principal Engineer 9360 Glacier Hwy., Suite 100 • JUNEAU, ALASKA 99801 • Phone 907.586.2093 • Fax 907.586.2099