Loading...
2023-12-14 Work SessionKodiak Island Borough Assembly Work Session Assembly Chambers Thursday, December 14, 2023, 6:30 p.m. Work Sessions are informal meetings of the Assembly where Assembly members review the upcoming regular meeting agenda packet and seek or receive information from staff. Although additional items not listed on the work session agenda are discussed when introduced by the Mayor, Assembly, or staff, no formal action is taken at work sessions and items that require formal Assembly action are placed on regular Assembly meeting agenda. Page 1. CITIZENS' COMMENTS 1-907-486-3231 or Toll Free 1-855-492-9202 (Limited To Three Minutes Per Speaker) trWITel21►1OYUII121LTA 601 a. Discuss Resolution No. FY2024-11 Adopting A State Legislative 4-49 Capital Improvement Project Priority List For The 2024 Legislative Session Aaenda Item Report - Pdf b. Discuss Approach To Holding A Strategic Planning Meeting 50-81 Agenda Item Report - Pdf C. Discuss Qualifications Required By Code To Serve On Boards 82 And Committees Aaenda Item Report - Pdf d. Discussion Of Changing The Transient And All -Inclusive Package 83-99 Accommodations Tax From Five Percent To Twelve Percent Agenda Item Report - Pdf 3. PACKET REVIEW a. CONTRACTS • Contract No. FY2020-08C Amending Contract No. FY2020-08 Agreement For Lobbying Services Between The Kodiak Island Borough And Hickey And Associates RESOLUTIONS • Resolution No. FY2023-20A Amending Resolution No. FY2023-20 To Extend The Sunset Date Of The Health Facilities Advisory Board (HFAB) To June 30, 2025 • Resolution No. FY2024-11 Adopting A State Legislative Capital Improvement Project Priority List For the 2024 Page 1 of 109 Legislative Session Resolution No. FY2024-13 Adopting An Alternative Allocation Method For The FY24 Shared Fisheries Business Tax Program And Certifying That This Allocation Method Fairly Represents The Distribution Of Significant Effects Of Fisheries Business Activity In FMA 13: Kodiak Area ORDINANCES FOR INTRODUCTION • Ordinance No. FY2024-04 An Ordinance Of The Assembly Of The Kodiak Island Borough Amending Title 2 Administration And Personnel, Chapter 2.30 Rules Of The Assembly, Section 2.30.080 Order Of Speaking • Ordinance No. FY2024-11 Amending Title 3 Revenue And Finance Chapter 3.35 Real Property Tax Section 3.35.030 Real And Personal Property Exempted From Taxation Regarding Good Cause For Late Filed Applications • Ordinance No. FY2024-12 Amending Title 2 Administration And Personnel, Chapter 2.30 Rules Of The Assembly, Section 2.30.060 Order Of Business And Agenda, In Order To Establish The Sequence In Which The Assembly Receives Public Comments During Meetings • Ordinance No. FY2024-13 Amending Title 3 Revenue And Finance, Chapter 3.30 Contract, Purchase, Sale, And Transfer Procedures, And Section 3.30.020 Limitation On Manager's Authority To Increase The Spending Authority From Twenty -Five Thousand To One Hundred Fifty Thousand For The Enterprise Fund • Ordinance No. FY2024-14 An Ordinance Of The Assembly Of The Kodiak Island Borough Amending Title 2 Administration And Personnel Chapter 2.105 Planning And Zoning Commission Section 2.105.030 Powers And Duties To Eliminate The Capital Improvement Review Process From This Section Ordinance No. FY2024-15 Amending Title 3 Revenue And Finance, Chapter 3.35 Real Property Tax And Chapter 3.40 Personal Property Tax, Section 3.35.030 Real And Personal Property Exempted From Taxation And Section 3.40.030 Assessment Return To Change The Filing Date For Exemption Applications From January 15 To March 31 4. MANAGER'S COMMENTS a. Borough Manager's Report 100-107 2023-12-14 Borough Manager's Report 5. CLERK'S COMMENTS Page 2 of 109 a. Borough Clerk's Report 108-109 2023-12-14 Borough Clerk's Report 6. ASSEMBLY MEMBERS' COMMENTS 7. MAYOR'S COMMENTS 8. OFFICIAL TRAVEL CALENDAR This meeting is open to the public and will be broadcast on the Borough's YouTube Channel. Meeting packets are available online. Please subscribe to get meeting notifications when meeting packets are published. For public comments, please call (907) 486-3231 or (855) 492-9202. Page 3 of 109 AGENDA ITEM #2.a. KODIAK ISLAND BOROUGH STAFF REPORT }. DECEMBER 14, 2023 ASSEMBLY WORK SESSION SUBJECT: Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Improvement Project Priority List For The 2024 Legislative Session ORIGINATOR: Meagan Christiansen, Grant Writer/Special Projects Support RECOMMENDATION: For discussion of the Assembly. This is a continuation of the discussion from the November 9 work session. DISCUSSION: The Assembly annually passes a resolution identifying capital projects deemed as priorities to submit to the Alaska Governor and State Legislative delegation for consideration of funding opportunities at the State level. Staff produced a suggested list for consideration and have amended the list per the direction of the Assembly during the November 9th work session. It has been the practice of staff to use the information included in this annual resolution to make entries in the State of Alaska Legislative Finance Capital Project Backup System, known as CAPSIS, in January of each year. All state legislators have access to the CAPSIS system where they can view the capital project descriptions and funding assistance being requested by our organization. Entries in the CAPSIS system require the following information: project title; agency designated to receive funding; the amount of funding being requested; whether there will be additional future requests for funding of this project; a brief project description; a funding plan that includes total project cost, amount and description of funding secured, state funding request, and any balance of funding needed; a detailed project description; a project timeline; and designation of the entity responsible for ongoing operation and maintenance of the project. Given the above practice, staff member Christiansen has included some notes in the version requested by the Assembly. ALTERNATIVES: FISCAL IMPACT: OTHER INFORMATION: Kodiak Island Borough Page 4 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 AGENDA ITEM #2.a. KODIAK ISLAND BOROUGH RESOLUTION NO. FY2024-11 A RESOLUTION OF THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH ADOPTING A STATE LEGISLATIVE CAPITAL IMPROVEMENT PROJECTS PRIORITY LIST FOR THE 2024 LEGISLATIVE SESSION WHEREAS, the Kodiak Island Borough represents approximately 13,000 residents of the Kodiak Island Archipelago living in six incorporated cities and one community governed by a tribal council government; and WHEREAS, a Borough—wide capital improvement program has been adopted by the Kodiak Island Borough Planning & Zoning Commission which identifies major needs of the island community for the next five years; and WHEREAS, the Kodiak Island Borough Assembly has reviewed the borough -wide capital improvement program adopted by the Planning & Zoning Commission and identified major projects to submit to the Alaska Governor and State Legislative Delegation for funding consideration. NOW, THEREFORE, BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH that: Section 1: The Kodiak Island Borough's State Legislative capital improvement project priorities (unranked) for the 2023 legislative session are as follows: St. Herman Harbor Infrastructure Replacement Estimated Project Cost Phase I & II $16,000,000 Phase III & IV $40,000,000 Funding �kcquiredl $ ?? — Commented [MC 11: Do we know if the City is Needed Funds $ ?? contributing any funds toward this project? The City of Kodiak is the owner of the two largest harbors in the Kodiak Island Borough, one of those harbors, St. Herman Harbor (SHH), was built by the State of Alaska in 1982 and has been a vital facility for Kodiak's large and diverse commercial fishing fleet for over 40 years. The State of Alaska turned over all state-owned facilities in St. Herman Harbor to the City of Kodiak in 1999. The facility provides safe moorage for more than 400 vessels from all over Alaska and the West Coast. Except for a few minor upgrades over the years, the original float system is beyond its useful life and is in critical need of replacement. The proposed project would result in the reconstruction of St. Herman Harbor with the replacement of most of its float system in four phases. Currently, the harbor has been losing Resolution No. FY2024-11 Page 1 of 6 Page 5 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 one dock per year due to aging and the saltwater elements. A dock loss results in 2 vessel berths along with the revenue generated for the harbor. This rate of failure is likely to increase in future years as the existing docks further deteriorate. The latest inspection report shows many portions of the facility are in very poor condition. The forty -year-old float systems suffer from failing concrete, rotting walers and bull rails, and an outdated electrical system. These floats contain electrical pedestals, fire suppression water lines, safety ladders and supply water. In 2022, the City contracted with PND Engineers, Inc. (PND) to prepare a St. Herman Harbor Planning and Scoping Report that includes concept harbor layouts, cost estimates and construction phasing recommendations. The Kodiak Island Borough supports the City of Kodiak request of $16 million to complete the first two phases. Phases III & IV estimated project development cost is approximately $40,000,000. Modernizing and expanding the port infrastructure is critical to remaining competitive in maintaining our status as an important commercial fishing community. Waterfront facilities and marine infrastructure are a critical element to the City of Kodiak and the State of Alaska, supporting a large portion of the City's commerce, industry, transportation, and recreational needs. Hospital Facility Sterilizer and Boiler Replacement Estimated Project Cost $1,000,000 Funding Acquired $0 Needed Funds $1,000,000 The Kodiak Island Borough owned hospital facility boilers and associated system components are aging along with the facility. The system components that have been identified for major repair or replacement include the oil -fired boilers, chiller unit, reverse osmosis water system, steam generation equipment and sterilization equipment are all in consideration. The oil -fired boilers provide the major hydronic heating component for several associated systems at the hospital facility. They include the production of facility heat, hot water and the hot water component for conversion to steam via a steam generator that is distributed to the sterilizers required for the hospital operations. The sterilizer equipment has been maintained at an operational level. Due to the age of the existing equipment, increased frequent failures associated with the steam generator and sterilization equipment has affected the operational capacity of the hospital to the point where operating room availability is managed at times with the functional capacity of the facility to ensure properly sterilized equipment. All of the system components need to be evaluated for replacement timeframes as and of the individual component failures may lead to services being suspended at the hospital facility. Kodiak Community Health Center Expansion Estimated Total Project Cost $25,850,000 Funding acquired $8,317,901 Resolution No. FY2024-11 Page 2 of 6 AGENDA ITEM #2.a. Page 6 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 AGENDA ITEM #2.a. Estimated Design Cost $1,200,000 Needed Funds $1,200,000 The Kodiak Community Health Center (KCHC) is currently housed within the Kodiak Island Borough owned hospital facility and co -located with Providence Kodiak Island Medical Center. KCHC is in need of increasing the clinic space and is planning an expansion project. Due to various changes in the community in the past five years, patient and provider counts have increased and pushed this organization to the maximum of their space limitations. Additionally, an increase in patient population is expected to coincide with a local US Coast Guard base increase in employees and their families in the next few years. With appropriate funding KCHC proposes to expand and improve the clinic space and continue to provide needed services in the Kodiak community. KCHC has acquired funding in the amount of $8.3 million toward this project, however design activities are not eligible within this funding. KCHC is seeking design funds in order to move forward with the project and will continue fund raising efforts for the balance needed. Kodiak Wastewater Treatment Plant Facility Estimated Project Cost $1,900,000 Funding Acquired $ ?? Needed Funds $ ?? The City of Kodiak provides water and sewer services to Kodiak Island Borough residences and business that are located adjacent to City of Kodiak boundaries. The City of Kodiak Treatment Plant operates under an Alaska Department of Environmental Conservation (ADEC) APDES permit. The first phase of a larger project to upgrade the City of Kodiak Wastewater Treatment Plant was to evaluate the facility for immediate system needs. The last major maintenance upgrade to the facility was in 1999. The condition and evaluation assessment included all major components within the plant interior and exterior, the out- buildings and three aeration basins; including all mechanical equipment needs. Alaska Pollutant Discharge Elimination System (APDES) permitting requirements were included during this assessment. Included in the facility rebuild assessment is the supervisory control and data acquisition (SCADA) system to interface with the 34 sewer lift station pumps and waste treatment at the facility. This facility with its labyrinth of connecting sewer lines, directly serves 2667 City of Kodiak and Kodiak Borough households including commercial businesses. The Treatment Plant also serves the U.S. Kodiak Coast Guard Base and the Pacific Spaceport Complex indirectly with our certified laboratory testing and waste disposal; not to mention NOAA vessels, the Alaska Marine Highway vessels and the expanding cruise ship industry stopovers in our Kodiak Harbors. The Kodiak Island Borough supports the City of Kodiak request for IFederall funding in the,, Commented [MC21: This Borough resolution is amount of $1.9M to begin design efforts leading to the construction of this critical specific to STATE funding. City is asking for federal funding. Resolution No. FY2024-11 Page 3 of 6 Page 7 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 AGENDA ITEM #2.a. infrastructure Wastewater Treatment Plant project that will support the wastewater needs of the community for the next twenty years. • City of Larsen Bay Reservoir Spill Way Estimated Project Cost $1,200,000 Funding Acquired $0 Needed Funds $1,200,000 The water reservoir spill way in the community of Larsen Bay is eroding and is nearing failure. This reservoir provides drinking water and hydroelectric power to the residents in the second- class city on Kodiak Island's west side. The Kodiak Island Borough supports the second-class City of Larsen Bay's request for funding assistance. • City of Port Lions Water Distribution System Replacement Estimated Project Cost $8,000,000 Funding Acquired $0 Needed Funds $8,000,000 The original water and sewer distribution system for our community was built after the 1964 Good Friday earthquake and tsunami forced the displaced residents of Afognak to relocate in what is now known as Port Lions. In 1994 a new system was installed. However, the contractor did not complete the job correctly. Many homes were not connected to the new system and many homes were connected incorrectly. The now connected system is considered aged out because it is over twenty-five (25) years old. The City of Port Lions Public Works crew consistently has a list of leaks and blockages to repair. In some places the system is beyond repair. We are consistently over budget for our water and sewer utility due to the unexpected expense of purchasing parts and paying our crew to repair and replace section of the distribution system. The outdated system drastically hinders community expansion efforts. The City of Port Lions are working closely with the Alaska Native Tribal Health Consortium QANTI CIq_ Commented [MC3]: The City of Port tions is for replacement project to be included in their funding pipeline as soon as possible. working with ANTHC on this project, not the STATE City of Old Harbor Septic Tank Replacement Estimated Project Cost $100,000 Funding Acquired $0 Needed Funds $100,000 The Kodiak Island Borough supports the City of Old Harbor's request for funding to Install a sewer septic tank in downtown Old Harbor which is a second-class city within the Kodiak Island Borough. City of Port Lions Fire Station Insulation Estimated Project Cost $35,000 Funding Acquired $0 Resolution No. FY2024-11 Page 4 of 6 Page 8 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 Needed Funds $35,000 The fire station in the second-class City of Port Lions is not insulated which necessitates that the fire truck be left empty of water during the winter months when temperatures drop below freezing and limits the time and ability to respond to a fire related emergency. The City of Port Lions requests funds for the purchase and installation of building insulation materials. Community of Karluk Water Tank Installation Estimated Project Cost $250,000 Local Funds $0 Needed Funds $250,000 The water holding tank in the community of Karluk has been condemned by the DEC. The Karluk IRA Tribal Council has a new water tank sitting in the Native Village of Karluk. The Kodiak Island Borough supports this request for funds to install the water tank for the water distribution to this community that lies within the Kodiak Island Borough. City of Port Lions Disaster and Emergency Preparedness Estimated Project Cost $50,000 Local Funds $0 Needed Funds $50,000 The City of Port Lions has an active Volunteer Fire Department and Village Response Team, both of which consist of fairly new members who are acquiring the necessary training to be effective First Responders. There is also a strong Public Safety Department (Village Public Safety Officer) and a community health clinic. Available resources have been used to properly outfit Volunteer Firefighters, but there is still a need for additional gear. The Quonset that houses the fire truck lacks heat and insulation, requiring that the truck tank be empty, and that hydrants and hoses are relied upon during the cold months. Foam insulation and installation and a waste oil burning heater in the Quonset garage would allow the firetruck to be used all yearlroundl. The community has received tsunami warning sirens through SOA and NOAA funding. However, one of the sirens is not connected to permanent electricity. A contract with the local electric provider is required for it to be installed. Basic disaster preparedness survival items such as emergency blankets, cots, dehydrated meals and a portable water purification system are also needed for this second-class city within the Kodiak Island Borough to be prepared for a local disaster or emergency. Resolution No. FY2024-11 Page 5 of 6 AGENDA ITEM #2.a. Commented [MC4]: What are they really asking for? The request for insulation is its own item above. Page 9 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 215 Section 2: The Kodiak Island Borough administration is hereby instructed to advise our 216 State of Alaska Governor and Legislative Delegation of the Capital Improvement Projects 217 Priority List adopted by the Kodiak Island Borough Assembly. 218 219 ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH 220 THIS DAY OF 2023 221 222 KODIAK ISLAND BOROUGH 223 224 ATTEST: 225 226 Scott Arndt, Borough Mayor 227 Nova M. Javier, MMC, Borough Clerk 228 229 VOTES: 230 Ayes: 231 Noes: 232 233 234 Resolution No. FY2024-11 Page 6 of 6 Page 10 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. Sharrat List of CIP plus Auditorium Lighting project Number Owner Reference Dollar Value Category Project Name/Description 1 KIB FY2024-11 $ 1,000,000.00 Healthcare Hospital Facility Sterilizer and Boiler Replacement 2 KIB FY2024-11 $ 1,200,000.00 Healthcare Kodiak Community Health Center Expansion 3 KIB/PZ FY2024-11 $ 10,427,850.00 Roads Bells Flats Commerical Truck Route Improvements 4 KIB/PZ FY2024-11 $ 2,000,000.00 Roads Pedestrian Pathways to Northstar Elementary School 5 KIB FY2024-11 $ 525,000.00 Schools Chiniak School Well and Water Treatment System 6 IKIB FY2024-11 $ 1,782,000.00 Schools Northstar Elementary School Roof and Skylight Replacement 7 KIB FY2024-11 $ 1,200,000.00 Life/Health City of Larsen Bay Reservoir Spill Way 8 KIB/PZ FY2024-11 $ 2,500,000.00 Electrical City of Ouzinkie Electrical Distribution System Replacement 9 KIB/PZ FY2024-11 $ 35,000.00 Life/Health City of Port Lions Fire Station Insulation 10 Assembly $ 1,500,000.00 Recreation Lighting for Gerald C Wilson Auditorium 11 KIB/PZ FY2024-11 $ 500,000.00 Recreation Mill Bay Beach Access and Recreation Upgrade 12 KIB/PZ FY2024-11 $ 10,000,000.00 Roads Anton Larsen Bay Road Extention to Ice Free Water 13 P&Z FY2024-27 $ 1,800,951.75 Roads Womens Bay SD South Russian Creek Road Repaving 14 P&Z FY2024-27 $ 10,500,000.00 Roads Service Area 1, Women's Bay, Bayview, and Monashka Service Area Paving Improvements 15 P&Z FY2024-27 $ 20,000,000.00 Roads Kodiak Island Borough Mission Road Safety Improvements 16 P&Z FY2024-27 $ 8,000,000.00 Life/Health City of Port Lions Water Distribution Replacements and Expansion 17 P&Z FY2024-27 $ 10,500,000.00 Electrical City of Old Harbor Hydroelectric Power Project 18 P&Z FY2024-27 $ 100,000.00 Life/Health City of Old Harbor Septic Tank Replacement 19 P&Z FY2024-27 $ 5,000,000.00 Roads Womens Bay West Rezanof Pedestrian Improvements 20 P&Z FY2024-27 $ 42,000,000.00 Roads Chiniak Highway Paving 21 P&Z FY2024-27 $ 250,000.00 Life/Health City of Karluk Community Water Tank Distro System 22 P&Z FY2024-27 $ 4,807,500.00 Faciliites City of Ouzinkie Municipal All -Purpose Complex 23 P&Z FY2024-27 $ 2,500,000.00 Electrical City of Ouzinkie Electrical Disro System 24 P&Z FY2024-27 $ 10,250,000.00 Electrical City of Ouzinkie Renewable Energy Projects 25 P&Z FY2024-27 $ 60,000.00 Facilities City of Ouzinkie Landfill Sotrage Facility 26 P&Z FY2024-27 $ 1,100,000.00 Equipment City of Ouzinkie Equipment Replacement 27 P&Z FY2024-27 $ 3,320,000.00 Facilities City of Ouzinkie Municipal Port Facility Upgrades 28 P&Z FY2024-27 $ 3,275,000.00 Roads City of Ouzinkie Community Road Upgrade -Construction 29 P&Z FY2024-27 1 $ 650,000.00 Facilities City of Ouzinkie Public Facilities Development 30 P&Z FY2024-27 $ 50,000.00 Life/Health City of Port Lions Disaster Emergency Prepardness 31 P&Z FY2024-27 $ 750,000.00 Facilities Demo and Replacement of Port Lions City Shop 32 P&Z FY2024-27 $ 2,500,000.00 Roads City of Port Lions roads resurfacing 33 P&Z FY2024-27 $ 65,000.00 Equipment City of Port Lions Equipment Fleet 34 P&Z FY2024-27 $ 75,000.00 Equipment City of Port Lions Harbor Crane 35 P&Z FY2024-27 $ 20,000.00 Program City of Port Lions Youth Activity Program 36 P&Z FY2024-27 $ 250,000.00 Faciliites City of Port Lions Harbor Building 37 P&Z FY2024-27 $ 250,000.00 Electrical City of Port Lions Energy Independence 38 P&Z FY2024-27 $ 25,000,000.00 Airport City of Port Lions Airport Expansion Project 39 COK 2023-07 $ 16,000,000.00 Ports St Herman Harbor Infrastructure Replacement Phase I & II 40 COK 2023-07 $ 40,000,000.00 Ports St Herman Harbor Infrastructure Replacement Phase III & IV 41 COK 2023-07 $ 1,900,000.00 Facilities Waste Water Treatment Plant 42 ICOK 2023-07 $ 2,350,000.00 Equipment New Fire Department Response Vehicle 43 COK 2023-07 $ 2,000,000.00 Roads Mill Bay Rod 44 COK 2023-07 $ 1,750,000.00 Roads Mission Road Page 11 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 AGENDA ITEM #2.a. KODIAK ISLAND BOROUGH RESOLUTION NO. FY2024-11 A RESOLUTION OF THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH ADOPTING A STATE LEGISLATIVE CAPITAL IMPROVEMENT PROJECTS PRIORITY LIST FOR THE 2024 LEGISLATIVE SESSION WHEREAS, the Kodiak Island Borough represents approximately 13,000 residents of the Kodiak Island Archipelago living in six incorporated cities and one community governed by a tribal council government; and WHEREAS, a Borough—wide capital improvement program has been adopted by the Kodiak Island Borough Planning & Zoning Commission which identifies major needs of the island community for the next five years; and WHEREAS, the Kodiak Island Borough Assembly has reviewed the borough -wide capital improvement program adopted by the Planning & Zoning Commission and identified major projects to submit to the Alaska Governor and State Legislative Delegation for funding consideration. NOW, THEREFORE, BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH that: Section 1: The Kodiak Island Borough's State Legislative capital improvement project priorities (unranked) for the 2023 legislative session are as follows: Hospital Facility Sterilizer and Boiler Replacement Estimated Project Cost $1,000,000 Needed Funds $1,000,000 The Kodiak Island Borough owned hospital facility boilers and associated system components are aging along with the facility. The system components that have been identified for major repair or replacement include the oil -fired boilers, chiller unit, reverse osmosis water system, steam generation equipment and sterilization equipment are all in consideration. The oil -fired boilers provide the major hydronic heating component for several associated systems at the hospital facility. They include the production of facility heat, hot water and the hot water component for conversion to steam via a steam generator that is distributed to the sterilizers required for the hospital operations. The sterilizer equipment has been maintained at an operational level. Due to the age of the existing equipment, increased frequent failures associated with the steam generator and sterilization equipment has affected the operational capacity of the hospital to the point where operating room availability is managed at times with the functional capacity of the facility to ensure properly sterilized equipment. All of the system components need to be evaluated for replacement Resolution No. FY2024-11 Page 1 of 6 Page 12 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 AGENDA ITEM #2.a. timeframes as and of the individual component failures may lead to services being suspended at the hospital facility. Kodiak Community Health Center Expansion Estimated Total Project Cost $25,850,000 Funding acquired $8,317,901 Estimated Design Cost $1,200,000 Needed Funds $1,200,000 The Kodiak Community Health Center (KCHC) is currently housed within the Kodiak Island Borough owned hospital facility and co -located with Providence Kodiak Island Medical Center. KCHC is in need of increasing their clinic space and is planning an expansion project. Due to various changes in the community in the past five years, patient and provider counts have increased and pushed this organization to the maximum of their space limitations. Additionally, an increase in patient population is expected to coincide with a local US Coast Guard base increase in employees and their families in the next few years. With appropriate funding KCHC proposes to expand and improve the clinic space and continue to provide needed services in the Kodiak community. KCHC has acquired funding in the amount of $8.3 million toward this project, however design activities are not eligible within this funding. KCHC is seeking design funds in order to move forward with the project and will continue to fund raise for the balance needed. Bells Flats Commercial Truck Route Road Improvements Estimated Project Cost $10,475,000 Funding Acquired 47,150 Needed Funds 10,427,850 This project will improve an existing circuit of roads in the Womens Bay area of the Kodiak Road System. The roads included in this project are traveled by commercial trucks transporting product from a gravel extraction site on Middle Bay Drive which produces the bulk of the gravel materials for concrete and asphalt production in the Kodiak community. It is estimated that this site can continue to produce a significant supply of gravel until at least the year 2040. These roads also support approximately 350 residents and other small business operations. A traffic pattern utilizing this loop of roads has been established to minimize collision potential. Empty gravel hauling trucks enter the gravel extraction site at one location and exit at a separate location, allowing the trucks to travel one-way along the circuitous path. This project will preserve improve road surfaces by reconstructing approximately three (3) miles of roadway including Sargent Creek Road, Salmonberry Drive, Middle Bay Drive, and Bells Flats Road in the Bells Flats Subdivision approximately eight miles south of the City of Kodiak. These routes all link together and are the main loop through the Women's Bay Area. Reconstruction of Resolution No. FY2024-11 Page 2 of 6 Page 13 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Inn... 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 AGENDA ITEM #2.a. the Sargent Creek Road will begin at Rezanof Drive and extends to the intersection of Bells Flat Rd. continuing from the intersection of Salmonberry Drive to the end of Middle Bay Drive (approximately 2 miles of paved road surface). The intersection of Bells Flat Road and Sargent Creed Rd, including all of Salmonberry Drive, back to the intersection Bells Flat Rd to Middle Bay Dr will also be reconstructed (approximately 1 mile of gravel/RAP road surface). Existing pavement will be milled and repaved, RAP surface areas will be paved, and subsurface improvements to be completed on portions of the project as well as 8 culvert replacements. Sargent Creek road, included in this project, is the single road for entry into and exit from the subdivision, thus connecting all residents of the subdivision with goods and services such as medical, educational, travel (airport and Alaska Marine Highway), grocery, home goods, repair, etc. in the greater Kodiak city area. Pedestrian Pathways to North Star Elementary School Estimated Project Cost $2,000,000 Needed Funds $2,000,000 This project will provide safe pedestrian access to an elementary school located atop a hill and surrounded by residential neighborhoods without sidewalks along the narrow unpaved roads. It also connects to a pedestrian/bike path along an arterial road that is popular among residents and visitors for commuting and recreational use, and a recreational trail that follows a nearby creek. A separated five -foot -wide pedestrian gravel pathway will be constructed along two residential roads leading to an elementary school. A separated pedestrian pathway addresses the risk for vehicle -pedestrian interactions, particularly when roads are snow and/or ice laden, by constructing a gravel pathway outside of the roadway. The dangerous walking conditions during winter have necessitated a hazardous bus route for students living within one mile of the school, provided by the Kodiak Island Borough School District. Chiniak School Well and Water Treatment System Estimated Project Cost $600,000 Local Funds $75,000 Needed Funds $525,000 Water at the Chiniak school is supplied by a local well that produces a sufficient quantity but low quality of water to the school. Because the water is non -potable it requires treatment prior to consumption by students, staff, and visitors to the small community school. A previous chlorine treatment system was removed many years ago due to age and difficulty of maintenance during a several year school closure. Since the school re -opened different water sources have been explored but found to be unusable. The best option is to re-establish a water treatment system associated with the existing well for water supply. Resolution No. FY2024-11 Page 3 of 6 Page 14 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Inn... 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 AGENDA ITEM #2.a. North Star Elementary School Roof and Skylight Replacement Estimated Project Cost $2,500,000 Local Funds $718,000 Needed Funds $1,782,000 The system of skylights within the North Star Elementary School roof provide daylight to the school's library, common area and cafeteria. The skylight system has been leaking and permeating the roof membrane, requiring replacement of both. This project provides for replacement of the skylight with a new skylight system, along with a comprehensive replacement of the low slope roofing membrane and associated assembly. City of Larsen Bay Reservoir Spill Way Estimated Project Cost $1,200,000 Needed Funds $1,200,000 The water reservoir spill way in the community of Larsen Bay is eroding and is nearing failure. This reservoir provides drinking water and hydroelectric power to the residents in the second- class city on Kodiak Island's west side. City of Ouzinkie Electrical Distribution System Replacement Estimated Project Cost $2,500,000 Needed Funds $2,500,000 The electrical distribution system in the second-class city of Ouzinkie which is in the Kodiak Island Borough is in need of replacement. The electrical transformers in this community's electrical distribution system have rusted due to exposure to the island's saltwater atmosphere, allowing water into transformers which causes extreme loads, short circuits and the potential for explosion. Further, the distribution cable is now beyond it's expected life and there are no alternatives for providing power to many of the community residents should a failure occur. City of Port Lions Fire Station Insulation Estimated Project Cost $35,000 Needed Funds $35,000 The fire station in the second-class City of Port Lions is not insulated which necessitates that the fire truck be left empty of water during the winter months when temperatures drop below freezing and limits the time and ability to respond to a fire related emergency. The City of Port Lions requests funds for the purchase and installation of building insulation materials. Service Area Road Improvements and Paving Estimated Project Cost $10,000,000 Local Funds $1,000,000 Needed Funds $9,000,000 Resolution No. FY2024-11 Page 4 of 6 Page 15 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 AGENDA ITEM #2.a. This project addresses the on-going need to improve portions of the roads in the Kodiak Island Borough's Road service areas: Service Area No. 1, Womens Bay Service Area, Bay View Road Service Area, and Monashka Bay Road Service Area. These roads connect residential neighborhoods with the greater Kodiak community. Paving projects will address main thoroughfares or busy neighborhood roads. Improvements to major drainage courses, installation of guard rails, and other identified road improvement needs may also be addressed with this funding. Priorities for expenditure of these funds are determined by the road service area boards. Local contributions to road improvements may be funded through local improvement districts where those in the district are taxed a proportion of the project cost. Mill Bay Beach Access and Recreation Upgrade Estimated Project Cost $500,000 Needed Funds $500,000 Mill Bay Beach is a recreational area heavily used by residents, sport fishermen and community groups who come to access this beach site located close to town. Time, tide, and use have eroded safe access to the two stretches of beach at this site. This project includes new stairs, walkways and trail enhancements between the two beaches, as well as a small raft/kayak launch. Anton Larsen Bay Road Extension to Ice Free Water Estimated Project Cost $10,450,000 Funding Acquired $450,000 Needed Funds $10,000,000 An extension of the Anton Larsen Bay Road will be a public road of approximately 2.2 miles to ice free waters just outside Anton Larsen Bay. The project will include a boat launching ramp. The road will provide year around road access to Kodiak for residents of Port Lions, Ouzinkie and much of the west side of Kodiak Island and all of Afognak Island without having to travel around Spruce Cape. Year-round travel by vessel to Kodiak around Spruce Cape is treacherous. Extending the Anton Larsen Bay Road makes winter traveling safer and provides access to critical services located in the City of Kodiak — including hospitals and businesses. The road extension will support existing commercial operations in Marmot Bay such as Kodiak Electrical Association hydro -electric plant, Koniag Inc. rock quarry, and Kodiak Regional Aquaculture Association's Kitoi hatchery. Moreover, an extended road will enhance summer and winter recreational opportunities and activities for all Kodiak residents. Resolution No. FY2024-11 Page 5 of 6 Page 16 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 AGENDA ITEM #2.a. The Anton Larsen Bay Road extension is envisioned as a project undertaken by the Native Village of Ouzinkie or the Spruce Island Develop Corporation. It will be built on a road right-of-way donated by the Ouzinkie Native Corporation and Koniag, Inc. The road extension is also in the road inventory of the Sun'aq Tribe of Kodiak. Maintenance of the extension is expected to be by one or both tribal entities. The route is identified in the Kodiak Transportation Plan as in important upland facility. Routing is complete and most of the design work is finished. An environmental assessment was completed in 2020. It is requested that this project be included in State of Alaska's State Transportation Improvement Program (STIP). Funding will be from State and/or Federal funds with Ouzinkie Native Corporation and Tribe providing the right-of-way and in-kind services. Section 2: The Kodiak Island Borough administration is hereby instructed to advise our State of Alaska Governor and Legislative Delegation of the Capital Improvement Projects Priority List adopted by the Kodiak Island Borough Assembly. ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH THIS DAY OF , 2023 KODIAK ISLAND BOROUGH Scott Arndt, Borough Mayor VOTES: Ayes: Noes: Resolution No. FY2024-11 ATTEST: Nova M. Javier, MMC, Borough Clerk Page 6 of 6 Page 17 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 AGENDA ITEM #2.a. Introduced by: CDD Requested by: P&Z Commission Drafted by: CDD Introduced on: 9/13/2023 Adopted on: 9/20/2023 KODIAK ISLAND BOROUGH RESOLUTION NO. FY2024-27 A RESOLUTION OF THE KODIAK ISLAND BOROUGH PLANNING AND ZONING COMMISSION RECOMMENDING A CAPITAL IMPROVEMENT PROJECTS PRIORITY LIST FOR FY 2024-2027 WHEREAS, the Kodiak Island Borough represents approximately 15,000 residents of the Kodiak Island Archipelago living in six incorporated cities and one community governed by a tribal council government; and WHEREAS, a Borough -wide capital improvement program is adopted annually by the Kodiak Island Borough Assembly with recommendations from the Planning & Zoning Commission. This list identifies the major needs of the island community for the next five years; and WHEREAS, THE Kodiak island Borough identifies priority projects to be submitted to the Alaska State legislative delegation and the Federal legislative delegation when applying for grants; NOW, THEREFORE, BE IT RESOLVED BY THE PLANNING AND ZONING COMMISSION OF THE KODIAK ISLAND BOROUGH THAT: Section 1: The Kodiak Island Borough Planning and Zoning Commission recommends the following capital improvement projects, in order of priority, for adoption into the Kodiak Island Borough FY 2022-2026 CIP list of Capital Projects: 1. Service Area One, Women's Bay Service Area, Bayview Service Area and Monashka Bay Service Area Road and Paving Improvements $10,500,000 To be applied to priority projects identified by the road service districts including Service Area One, Womens Bay Service Area, Bayview Service Area, and Monashka Bay Service Area. Priorities will be based on recommendations made by the elected service area boards and professional engineering study. Local contributions to project engineering and design may be funded through local improvement districts where those in the district are taxed a proportion of the project. 2. Kodiak Island Borough Mission Road (Including Spruce Cape) Safety Improvements $20,000,000 Mission Road is a major collector street for the community, and one of the roads that lead to downtown. The project will widen the existing two (2) lanes and provide a pedestrian and bike path on the shoulder or on the sidewalks. This request funding will provide for the needed planning and design that will help develop a scope of work and the overall project cost. Kodiak Island Borough, Alaska Resolution No. FY2024-27 Page 1 of 15 Page 18 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 AGENDA ITEM #2.a. 3. Kodiak Island Borough Mill Bay Beach Access and Recreation Upgrade $163,000 This beach is heavily used by residents, sports fishermen and the community who come to view this bay located close to town. New construction items proposed here would include new stairs, walkways, and trail enhancements between the two beaches, as well as a small raft/kayak launch. 4. The City of Larsen Bay Reservoir Spill Way $1,200,000 The spill way is eroding and will eventually fail. The City of Larsen Bay gets 70 percent of our drinking water from the reservoir. The City also operates the Hydro Electric plant from the same reservoir. 5. The City of Ouzinkie's Electrical Distribution System $2,500,000 Age and exposure to salt -water atmosphere have revealed that all of the transformers on Ouzinkie's electric distribution system have rusted out. When the lids rust thru, water gets into the transformer causing extreme loads, short circuits, and the potential, (due to buildup of gas pressure), of explosion with consequences to individuals and property in the vicinity. It is expected that this preventive renovation will reveal other situations such as individual poles that need replacement and rerouting of transmission lines. A highly critical and significant section of Ouzinkie's power is connected to the hydroelectric plant. This connection is by direct burial concentric neutral 7,200 -volt power lines. This quality of cable as it was installed has been estimated by Jim Develin, KEA's Electrical Engineer to have exceeded its normal expected life and is subject to failure any day. The western section of town is serviced by the same type of cable and there is no possibility of delivering power to these residents, temporary or otherwise when this failure occurs. It is desired that this project be engineered, and project managed thru The Alaska Energy Authority. 6. The City of Port Lions Water Distribution Replacements and Expansion $8,000,000 The original water and sewer distribution system for our community was built after the 1964 Good Friday earthquake and tsunami forced the displaced residents of Afognak to relocate in what is now known as Port Lions. In 1994 a new system was installed. However, the contractor did not complete the job correctly. Many homes were not connected to the new system and many homes were connected incorrectly. The now connected system is considered aged out because it is over twenty-five (25) years old. The City of Port Lions Public Works crew consistently has a list of leaks and blockages to repair. In some places the system is beyond repair. We are consistently over budget for our water and sewer utility due to the unexpected expense of purchasing parts and paying our crew to repair and replace section of the distribution system. The outdated system drastically hinders community expansion efforts. The City of Port Lions are working closely with the Alaska Native Tribal health Consortium (ANTHC) for replacement project to be included in their funding pipeline as soon as possible. 7. The City of Old Harbor Hydroelectric Power Project $10,500,000 (2012 Projected Cost) This project is to construct a run -of -the -river hydroelectric facility with a diversion structure, pipeline, powerhouse, and electric transmission line. The project will have a low flow capacity of 140 kW and a peak capacity of 525 kW. This renewable resource will provide electrical power for the residents of Old Harbor, along with reducing diesel fuel use for power generation by at least 95%. It will help provide opportunities for economic growth Kodiak Island Borough, Alaska Resolution No. FY2024-27 Page 2 of 15 Page 19 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 108 and business development in the community. 109 110 8. The City of Old Harbor Septic Tank Replacement 111 $100,000 112 Install a sewer septic tank in downtown Old Harbor, Alaska. 113 114 9. Anton Larsen Bay Road Extension to Ice Free Water 115 $10,450,000 116 An extension of the Anton Larsen Bay Road to ice -free waters will provide year-round access 117 to those communities located in the Kupreanof Strait and Kizhuiak Bay area as well as those 118 who use the Island's West side for commercial and recreational purposes. Many times during 119 the year travel by vessel to Kodiak is treacherous. Extending the road to ice -free waters 120 makes traveling safer, providing access to critical services located in the City of Kodiak 121 including hospitals and businesses. This is envisioned to be a cooperative effort between 122 KIB, AKDOT, Ouzinkie Native Corporation (surface estate owner), Koniag Inc. (surface 123 estate owner) and other tribal entities. This route was identified in the Kodiak Transportation 124 Plan as an important upland facility. Some or all of the aforementioned parities may 125 participate in funding this. 126 127 10. Womens Bay Service District West Rezanof Drive Pedestrian Improvements 128 $5,000,000 129 The section of West Rezanof Drive near Sargent Creek and the Russian River 130 frequently has visitors taking advantage of fishing opportunities and other wildlife 131 viewing activities. Roadside parking and pedestrian activity along this corridor are 132 not compatible with the high-speed vehicular traffic on the roadway. To enhance 133 and eliminate conflicts between user groups, new construction items are being 134 proposed. This includes, but is not limited to, additional off-street parking, 135 boardwalks, pedestrian bridges, and other pedestrian improvements. 136 137 11. Chiniak Highway Paving 138 $42,000,000 139 The residents of Chiniak are requesting to seek funding for paving the Chiniak 140 Highway from mile maker 30 to mile marker 42. The road, owned by the State, 141 requires grading, drainage work, paving and construction pedestrian facilities. 142 Currently the road is gravel which possess increased icy conditions in the winter and is 143 dusty at all times of the year when dry. The gravel road requires continual 144 maintenance. The residents believe that maintenance will be reduced, and public 145 health and safety will increase with the paving of the road. Cost was estimated at 146 $3,500,000.00 per mile per state and federal calculations. 147 148 12. The City of Karluk Community Water Tank Distribution Systems 149 $250,000 150 The current water tank in Karluk has been condemned by the DEC. The Karluk IRA Tribal 151 Council has a new water tank sitting in the Native Village of Karluk. Funds are requested 152 for installation for the water distribution to the Village. 153 154 13. Women's Bay Service District South Russian Creek Road Repaving Kodiak Island Borough, Alaska Resolution No. FY2024-27 Page 3 of 15 Page 20 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 155 $1,800,951.75 156 The roadway was originally paved circa 1985 using mostly federal financing under the 157 Intermodal Service Transportation Efficiency Act. Since that time the roadway has been 158 maintained by the Womens Bay Service District with taxes collected from the residents for 159 that purpose. The Service District mill rate is currently 2.5 mill s which is the highest of all 160 Borough Service Districts. The current budget has barely been sufficient to keep roads 161 cleared of snow and ice and also maintain the 12 miles of road in the district. Over the 162 years the maintenance for the South Russian Creek Road paved area has increased as 163 the asphalt has deteriorated and at this time maintenance attempts are becoming futile and 164 exponentially more expensive. The estimate from Brechan Construction, LLC to repave the 165 roadway is $1,800,951.75 (see attached estimate). If the road is repaved, it would reduce 166 the overall maintenance costs and allow the Service District to re -allocate money to other 167 needed projects. 168 169 14. The City of Port Lions Anton Larsen Dock, Launch Ramp, and Parking 170 Improvements 171 $2,000,000 172 The Anton Larsen Dock is heavily used by Port Lions and Ouzinkie residents, as well 173 as others living on the Island's West side, commercial fishermen, charter operations, 174 and citizens living on Kodiak's Road system. Improvements to this facility have been 175 made in the recent past. However, given the sites popularity, an expansion of the 176 parking facilities is needed. Additionally, a floating dock space is needed at the ramp so 177 that users can more safely pull boats or cargo to shore. 178 179 15. The City of Ouzinkie Municipal All -Purpose Complex 180 $4,807,500 181 The Ouzinkie City Offices have been housed, for decades, in an old BIA territorial school 182 that is home to hundreds of bats, old lead paint, and an electrical and plumbing system that 183 needs rigorous upgrading. The City Office Building consists of: offices, a conference room 184 and meeting area, maintenance equipment rooms, supply rooms and a small apartment. 185 We estimate that it would be less expensive to build from the ground up. 186 Each year the community faces various emergencies like: earthquakes generating tsunami 187 warnings and evacuations; winter storms that knock out power, downpours resulting in 188 water facility breakdown to winter ice and summer potholes wrecking equipment. New 189 situations such as the pandemic we are in bringing to the fore the lack of physical location 190 for locals seeking care, isolation, and resources. This building with its own generator for 191 power, would have storage of water, food and sleeping areas and would serve as a 192 command center for the whole community and the surrounding areas on Spruce Island. 193 Being placed as or above the 100 -foot inundation zone would be for the safety of the 194 community, building, equipment, and employees. It would also ensure that the community 195 would have a post emergency safe haven. 196 The complex would enhance basic operations. Emergency management addresses 197 extreme events, across all hazards and through the phases of mitigation, preparedness, 198 response, and recovery. A place for our heavy equipment, fire engine, ambulance etc. 199 would also be housed up in this area above the 100' mark to ensure that all this 200 equipment's would be available for post emergencies. Kodiak Island Borough, Alaska Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Inn... Resolution No. FY2024-27 Page 4 of 15 Page 21 of 109 AGENDA ITEM #2.a. 201 There would be several areas along with offices and a conference/meeting room that 202 could house other much needed facilities for the community. A Teen and Youth Center, 203 one or two studio apartments, a Rural Training Center and an entrance or outdoor area 204 that would pay proper tribute to our men in uniform for their dedicated service to our 205 country is something that is valued by our community. A memorial would be a welcome 206 addition in recognition of their bravery, selflessness, and commitment to the defense of our 207 nation. 208 A Teen and Youth Center where Ouzinkie's youth would have a fun and safe place to 209 socialize, exercise and have appositive interaction with peers and adults affiliated with the 210 center. The Center could bring a strong character and realize our youth's development, 211 healthy living, and social responsibility. The mission would be to provide a safe, enjoyable 212 environment where teenagers can engage in beneficial educational, and leisure -time 213 activities. 214 Part of the building could also be used as a Rural Training Center with the conference and 215 meeting room serving a dual purpose as training and meeting rooms. Having a designated 216 area for classes would broaden the opportunities available for both agency programs and 217 actual opportunities for residents that have employment skill needs that are currently 218 unmet. The intent would be to keep the scale of operation flexible and small in size so as to 219 be able to adapt to changing vocation skill needs as well as providing focused individual 220 instruction. 221 • Phase One -Design: $550,000 222 This would include design of the building which would include but not be limited to 223 the administration offices, meeting and conference area/training areas, library, 224 apartments, supply and maintenance/parts area. 225 • Phase Two -Construction: $4,257,500 226 Moving of the office into temporary quarters. The City of Ouzinkie has a lot where a 227 temporary office trailer could go while this construction is underway. It is believed 228 that if construction starts in the early spring, then by late fall the project would be 229 completed. This phase would also include site preparation and construction. 230 16. The City of Ouzinkie Electrical Distribution System 231 $2,500,000 232 Age and exposure to salt -water atmosphere have revealed that all of the transformers on 233 Ouzinkie's electric distribution system have rusted out. When the lids rust through, water 234 gets into the transformers causing extreme loads, short circuits, and the potential, (due to 235 buildup of gas pressure), of explosion with consequences to individuals and property in the 236 vicinity. It is expected that this preventive renovation will reveal other situations such as 237 individual poles that need replacement and rerouting of transmission lines. A highly critical 238 and significant section of Ouzinkie's power is connected to the hydroelectric plant. This 239 connection is by direct burial concentric neutral 7,200 -volt power lines. This quality of cable 240 as it was installed has been estimated by Jim Develin, KEA's Electrical Engineer to have 241 exceeded its normal expected life and is subject to failure any day. The western section of 242 town is serviced by the same type of cable and there is no possibility of delivering power to 243 these residents, temporary or otherwise when this failure occurs. 244 /t is desired that this project be engineered, and project managed through The Alaska 245 Energy Authority. 246 247 17. The City of Ouzinkie Renewable Energy Projects Kodiak Island Borough, Alaska Resolution No. FY2024-27 Paqe 5 of 15 Page 22 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 248 A. Alternative Energy Wind Generation $2,500,000 249 Ouzinkie has utilized alternative energy with the use of hydro power for 20 250 years. This has worked well for the community, and has resulted in a large 251 saving of fuel vs. diesel generation. The community wishes to enhance this 252 component of our generation facilities with the addition of wind power. Spruce 253 Island is located in an area with high potential for wind generation. The project 254 is expected to take four phases to be incorporated into the present grid. 255 Construction Phase 256 Phase One: Analyze the two years of wind data collected in the process of site 257 investigation for the new airport. Expected expenses $10,000 258 Phase Two: Construct a site-specific data collection wind tower for sizing of 259 wind generation tower and generator. An engineering feasibility study to the applicable 260 aspects of connecting solar to the present system. Running in tandem with diesel and 261 hydroelectric. Expected expense $100,000 262 Phase Three: Construct and install generator and tower of estimated size of 263 200KW. Expected expense $2,090,000 264 Phase Four: Install power control equipment to integrate equipment into the 265 present grid utilizing the hydro/diesel combination of generation. 266 Expected expense $100,000 267 Phase Five: Design and engineering, installation of SCADA computer controls and 268 programmable logic controllers. Expected expense $200,000 269 The creation of green alternative energy is an increasingly promising solution to multiple 270 challenges. Sustainable business and energy independence are keys to our economic 271 revitalization. Solar could be part of the answer to affordable power for housing and 272 business that will help offset the cost of electricity by diesel powered generators. 273 B. Alternative Energy Solar Panels 274 $7,750,000 275 Ouzinkie has an ideal area at the old Ouzinkie Airport for development of a solar farm that 276 would power much of the energy needs of the community. With the need to cut our 277 dependence on diesel fuel the community is looking at various alternative energy projects. 278 Having a hydroelectric system has helped with the consumption of diesel, additional 279 alternative energy working in tandem with the hydro would make Ouzinkie completely 280 independent of diesel. 281 The tremendous growth in the U.S. solar industry is helping to pave the way to a cleaner, 282 more sustainable energy future. Over the past few years, the cost of a solar energy system 283 has dropped significantly — helping to give more families and businesses access to 284 affordable, clean energy. 285 When converted to thermal energy, solar energy can be used to heat water for use in 286 homes and building; to heat spaces inside homes, greenhouses, and other buildings. 287 Solar energy can be converted to electricity by Photovoltaic (PV devices or solar cells). 288 Solar cells change sunlight directly into electricity. Individual PV cells are grouped into 289 panels and arrays of panels that can be used in a wide variety of systems that power single 290 homes, to power plants. Kodiak Island Borough, Alaska Resolution No. FY2024-27 Page 6 of 15 Page 23 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 291 292 18. The City of Ouzinkie Landfill Storage Facility 293 $60,000 294 Landfills are excavated or engineered sites where non -liquid hazardous waste is deposited 295 for final disposal and covered. The construction of a Storage Facility here is intended to 296 protect human health and the environment from the risks posed by waste. The containment 297 building will be 60'x80' completely enclosed, self-supporting structure (i.e., have four walls, 298 a roof, and a floor) used to store or treat non -containerized hazardous waste. Since 299 landfills are permanent disposal sites and are closed with waste in place installing such a 300 structure will enhance health and safety for operators maintaining the islands dump station. 301 The fabrication of covered storage will extend the life of this landfill a benefit for limited 302 island area. 303 304 19. The City of Ouzinkie Equipment Replacement 305 $1,100,000 306 The city's equipment is aging out and needs to be replaced. Heavy equipment has 307 been compromised due to being open to the salt air and other elements. A storage 308 building for housing heavy equipment for both the Native Village of Ouzinkie and 309 the City of Ouzinkie has been funded and is in its initial stages. 310 311 • Fork Life $250,000 312 • Dump Truck $200,000 313 • Caterpillar Excavator 320 $300,000 314 • Sewage Pumping Truck $200,000 315 • Backhoe/Loader $150,000 316 317 20. The City of Ouzinkie Municipal Port Facility Upgrades 318 • Zinc Replacement for Harbor and Dock $50,000 319 The Ouzinkie Boat Harbor was competed in 2001 and the dock was completed in 2012 and 320 the zinc anodes on the metal pilings and dock face are in need of replacement due to 321 electrolysis. Cathodic protection is a technique used to control the corrosion of metal 322 surface. The simplest method to apply cathodic protection is by connecting the metal to be 323 protected with another more easily corroded metal to act as the anode. Zinc is one of the 324 metals commonly used as anodes. Due to the zincs being welded on means that drivers 325 will have to replace these zincs on both the harbor and dock. 326 • Electrical Upgrade and Water to Boat Harbor $50,000 327 The Ouzinkie Boat Harbor, when it was built, was designed with very limited electrical 328 outlets. One group of 4 plug -ins at the end of each float. Our harbor is full and the need for 329 electricity by the vessels has outgrown what is available. An upgrade to existing meter 330 bases and additional bases to be put in at intervals along the three fingers to get rid of the 331 multitude of electrical cords being used by individual users. 332 The Harbor also does not have access to any fresh water. The installation of water lines to 333 the three floats would eliminate the need to haul water from the central part of town. Fresh 334 water would allow for local access to boats and skiffs that moor at the Harbor and for Kodiak Island Borough, Alaska Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... Resolution No. FY2024-27 Page 7 of 15 Page 24 of 109 AGENDA ITEM #2.a. 335 transients that are overnighting and traveling through to other destinations and fishing 336 grounds. 337 Access Ramp at Harbor 338 Engineering $1,500,000 339 Engineering will provide background and engineering design guidance for the Boat Harbor 340 Vehicle Access Ramp. The study will address the needs of the project, identification and 341 evaluation of available data that can be used to describe environmental (earth, water and 342 weather) conditions affect the land above the harbor and develop a detailed design and 343 construction cost estimate based on the environmental concerns. 344 Construction $1,500,000 345 Ouzinkie has a boat harbor breakwater for the protection of marine vessels and skiffs in the 346 harbor area. Use of this facility has restrictions for commercial fishermen, skiff owners, and 347 tourism vessels. Currently, access is restricted to a narrow gravel road from Spruce Street 348 that goes down a hill to a narrow 10'x3' wooden ramp that accesses the harbor grated 349 walkway ramp. It does not allow for skiff to car/4-wheeler loading access. You have to 350 unload your freight from your boat by hand, into carts, hand cart the freight up the grated 351 ramp, up the wooden ramp, up a one lane S shaped gravel route to your vehicle. A vehicle 352 accessible ramp would allow for skiff to car unloading. Handicap/Elder accessibility is 353 almost non-existent. 354 • Fish Cleaning Station $50,000 355 Stainless steel will not rust or corrode, making them ideal for coastal use: the cleaning 356 station design is for unsupervised operation in publicly accessible areas. It could 357 accommodate multiple users at a time and can be integrated with water. Water access can 358 be done with one -inch HTP pipe running across access ramp with hose bib on end. The 359 disposal of fish waste will benefit Spruce Island Farms our food project which composts for 360 rich soil. The fish cleaning station will have signs that list the rules and regulations for use. 361 • Public Restrooms $170,000 362 For comfort and convenience of community members and visitors to the village we would 363 like to install a concrete slab enclosed restroom facility at the Ouzinkie Boat Harbor and at 364 the new Municipal Dock. Currently the closest public facilities for the boat harbor are half a 365 mile away, at the Tribal Cultural Center. There is a septic station at the start of the harbor 366 road, it would not take much effort to construct and install such a facility. 367 With Ouzinkie now being on the Alaska Marine Highway System people are waiting at the 368 dock area where there are no restroom facilities available. This could be incorporated with 369 a shelter for protection against inclement weather while waiting for the ferry. As part of the 370 economic development of the municipal dock this public restroom facility would enhance 371 the other projects that are planned for future development. 372 373 21. The City of Ouzinkie Community Road's Upgrade -Construction 374 $3,275,000 375 The City of Ouzinkie has not had available, since original construction in the 1970's, 376 material for maintenance and repair of the Village roads. Road improvements would 377 include road shaping and crowning, drainage and culvert improvements, chip seal 378 surfacing and dust control. The road improvements would improve vehicle and pedestrian 379 safety and eliminate destructive potholes. Kodiak Island Borough, Alaska Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... Resolution No. FY2024-27 Page 8 of 15 Page 25 of 109 AGENDA ITEM #2.a. 380 Recent construction of a sewer project in the village has required digging up the village 381 streets, causing damage that is not restorable under the constraints of the village and 382 water project budget. The net effect is excess wear and damage to not only the village 383 utility vehicles such as the dump truck, electric utility vehicles, fire and ambulance services, 384 but to the vehicles utilized by residents in the normal pursuit of personal or vocational 385 business. Excess wear and damage have been noted on the grader used for snow 386 removal. Repair of this item requires sending eh equipment out of the village on a landing 387 craft at a considerable expense for repair. Individual residents can only afford to absorb 388 their own personal losses. 389 There was a planned airport construction project in Ouzinkie in 2008; the project has 390 provided the opportunity for tremendous cost -savings for small local projects that would 391 otherwise not be practical from a construction mobilization standpoint. Throughout Alaska, 392 agencies and communities look for these cooperating project opportunities. Ouzinkie 393 understands this is an opportunity to focus their efforts. 394 395 22. The City of Ouzinkie Public Facilities Development 396 • Boardwalk Repair/Replacement $100,000 397 Ouzinkie's wooden boardwalk is an identifying feature of the community and provides for a 398 scenic stroll along our coastline. Unfortunately, City budget constraints have not allowed 399 for proper routine maintenance and our boardwalk is in desperate need of extensive 400 repairs or a complete replacement. Ouzinkie residents frequently travel the boardwalk to 401 get from one end of the community to the other and it is highlight of our village tour. 402 Ensuing its continued presence in our community is a priority for many Ouzinkie residents. 403 • Community Development $200,000 404 The City of Ouzinkie has many trails and recreational spots that have been in existence for 405 time immemorial and should be taken care of especially that Ouzinkie is working on 406 drawing tourism to the village. Scenic outlook viewing shelters, fire pits, benches, outdoor 407 toilet facilities, trail maintenance, small bridges, and camping facilities would contribute to 408 the development of this tourism and economic development. In keeping with tourism, a 409 water -front area of shops downtown would be an attraction to tourists where they could buy 410 form local artists. 411 The community needs an outdoor recreation site. A place where activities such as a 412 baseball, volleyball, basketball, tennis, track, etc. can be conducted. The facility could also 413 include a camping and barbecue area for outdoor community events and tourist events. 414 • Upgrade to Freezer Building/Fish Processing Facility $350,000 415 The existence of our community's freezer building/fish processing facility represents a 416 great deal of opportunity and un -utilized potential. The primary reason for its non - 417 operational status is that the cost of operation is too high, and the village cannot afford its 418 associated costs. Some modifications are required to update the facility and maximize its 419 job -creating and income -earning potential, such as a ramp and an easy access point for 420 unloading fish and finished products. 421 However, the primary issue which must be addressed is lowering the costs of utilities. 422 Having the facility linked up with solar panels, wind turbines, etc. would lower the cost of 423 the round-the-clock power consumption required to keep the catch cold and allow the 424 village to realize a profit from its efforts. This would also catch cold and allow the village to 425 realize a profit from its efforts. This would also facilitate the community in its ability to Kodiak Island Borough, Alaska Resolution No. FY2024-27 Page 9 of 15 Page 26 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 426 "brand" itself, selling an array of top-quality, locally caught fish to a wide range of 427 consumers. 428 429 23. The City of Port Lions Disaster Emergency Preparedness 430 $50,000.00 431 The City of Port Lions has an active Volunteer Fire Department and Village Response 432 Team, both of which consist of fairly new members who are acquiring the necessary 433 training to be effective First Responders. We also have a strong Public Safety Department 434 (Village Public Safety Officer) and a community health clinic. 435 We have used our available resources to properly outfit our Volunteer Firefighters, but we 436 still have a need for additional gear. 437 The Quonset in which our fire truck is housed lacks heat and insulation, so we are not able 438 to keep water in the truck tank in the winter months. We must rely on hydrants and hoses 439 during the cold months. We would like to use foam insulation and install a waste oil burning 440 heater in the Quonset garage. Our firetruck could then be used all year round. 441 Our community has received tsunami warning sirens through SOA and NOAA funding. 442 However, one of the sirens is not connected to permanent electricity. We must contract 443 with the local electric provider to get it installed. 444 We also need to obtain some basic disaster preparedness survival items such as 445 emergency blankets, cots, dehydrated meals and a portable water purification system. 446 447 24. Demolition and Replacement of the Port Lions City shop 448 $750,000.00 449 The City of Port Lions Public Works Department provides essential services (water and 450 sewer, refuse collection, fuel delivery) to the approximately 175 residents of our off-road 451 Kodiak community. 452 The Public Works Department operates out of our city shop facility, which is at least 45 453 years old and is deteriorating rapidly. The interior is unfinished, unheated, with two small 454 equipment bays (one has a concrete floor, and one has a dirt floor), and no running water 455 or restroom. 456 The shop facility is crucial to all City of Port Lions functions, as it is our only enclosed area 457 for equipment repair and maintenance, supply and tool dry storage, fabrication shop for 458 small welding projects, staging area for water and sewer projects. 459 This project is our top priority for FY24. With funding a Quonset style building with running 460 water, a waste -oil burning heater, and a restroom will replace the existing structure. 461 462 25. City of Port Lions Streets and Roads Resurfacing 463 $2,500,000.00 464 Port Lions is a small off-road community in the Kodiak Archipelago. The Port Lions Road 465 system spans approximately seven (7) miles and is vital to our community for commuting 466 to work, school, church, the airstrip (located 2 miles from the Village), boat harbor (located Kodiak Island Borough, Alaska Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... Resolution -No. FY2024-27 Page 10 of 15 Page 27 of 109 AGENDA ITEM #2.a. 467 1 miles from the village), ferry dock (located 3 miles from the village), evacuation to high 468 ground in the event of a tsunami. We have no store, so access to daily planes, the boat 469 harbor and ferry dock is critical for our residents to receive groceries, fuel, and other 470 necessities. We have approximately five (5) miles of State of Alaska road and two (2) miles 471 of residential roads in Port Lions, but the State Road has never been resurfaced (even 472 though unpaved roads are usually resurfaced every 10-15 years on average). 473 Driving conditions have become hazardous in area due to lack of guard railings, bare 474 surface, washed out culverts, and damaged signage. The City of Port Lions does not have 475 funding to support a project that would resurface the five miles of State Road in our village. 476 We struggle to perform regular maintenance on the two (2) miles of residential routes that 477 we own. This project would ensure community member's safe travel to and from work, 478 school, or during an emergency mass evacuation. 479 The funds we receive from the SOA in "revenue sharing" (Community Assistance Program) 480 have steadily decreased for many years whiles, at the same time, the Alaska Municipal 481 League Joint Insurance Association has continually raised our premiums. The result is that 482 over half of our revenue sharing funds now go to paying for our annual insurance. The 483 remainder is split between supporting our Library, our public safety program, and our 484 streets and roads department. 485 486 26. The City of Port Lions Equipment Fleet 487 $65,000.00 488 The City of Port Lions operates an aging fleet of equipment that includes a small motor 489 grader, a small backhoe, and a small bulldozer. We also own a 2013 front end loader, 490 excavator, garbage truck, and shop truck. 491 All of the aging equipment is in very poor condition. The public works crew spends a 492 number of hours each year working to keep them running. 493 We own and operate a State of Alaska permitted landfill. In order to stay in compliance with 494 the permit, we must regularly move and cover refuse. We also must regularly move ash 495 from our landfill burn box. These activities require the use of a small, reliable bulldozer. Our 496 current bulldozer does not start without pouring gasoline in the starter, the door does not 497 close, and the floor is rotting (we have attached a piece of plywood over the hole for safety 498 purposes). 499 With funding, we would work to procure used or modestly priced heavy equipment to fulfill 500 our community's needs. 501 502 27. Heating and Insulation Installation for the City of Port Lions Fire Station 503 $35,000.00 504 The City of Port Lions fire station houses the fire truck and volunteer fire department 505 equipment. The fire truck bay does not have adequate insulation or heating for winter 506 weather conditions. Prolonged cold temperatures create freezing conditions within the 507 building which can cause the water inside the fire truck to freeze. During winter months, we 508 do not fill the firetruck with water, rather the Volunteer Fire Department has been trained to 509 use hydrants and hoses instead. Kodiak Island Borough, Alaska Resolution No. FY2024-27 Pape 11 of 15 Page 28 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 510 We also have a small Code Red suppression unit that can be towed to buildings that are too 511 far away from a hydrant. But, in spite of our efforts to be prepared to respond to fires without 512 a fire truck, our community is still at risk for loss of property or life in the event of a fire. 513 The majority of Port Lions residents rely on wood stoves during the winter months. Our off - 514 road community is very spread out, and many structures are not in close proximity to a fire 515 hydrant. Our Code Red unit works well, but it is too small to be relied upon to suppress any 516 large fire. 517 With funding, the fire truck bay would be insulated with spray foam, and adequate heating 518 would be installed in the fire station to allow the fire truck to be filled and ready to respond to 519 emergency situations. 520 521 28. The City of Port Lions Harbor Crane 522 $75,000.00 523 The community of Port Lions is a small fishing community on Kodiak Island. The harbor 524 facilities offer a small range of commodities such as pot storage, harbor storage, and a 525 gridiron. The hoist for the harbor is aged out, broken, and would cost more to repair than 526 replace it. The lack of a hoist greatly impacts our community members who fish 527 commercially, transport heavy cargo or fuel, or need to remove equipment from their vessels 528 for repairs. The crane is also used to move freight off landing crafts and barges. Most 529 importantly drums of fuel and pallets of groceries coming into the village. 530 With funding, we would be able to remove and replace the broken crane with a reliable one 531 that would serve the community's needs for decades. 532 533 29. The City of Port Lions Water Distribution Replacement and Expansion 534 $8,000,000.00 535 The original water and sewer distribution system for our community was built after the 1964 536 Good Friday earthquake and tsunami forced the displaced residents of Afognak to relocate 537 in what is now known as Port Lions. 538 In 1994 a new system was installed. However, the contractor did not complete the job 539 correctly. Many homes were not connected to the new system, and many homes were 540 connected incorrectly. 541 The system is now considered aged out because it is over 25 years old. The City of Port 542 lions Public Works crew consistently has a list of leaks and blockages to repair. In some 543 places the system is beyond repair. We are consistently over budget for our water and sewer 544 utility due to the unexpected expense of purchasing parts and paying our crew to repair and 545 replace sections of the distribution system. The outdated system drastically hinders 546 community expansion efforts and has become financially crippling to the community 547 members when water mains burst. We are working closely with the Alaska Native Tribal 548 Health Consortium (ANTHC) for a replacement project to be included in their funding pipeline 549 as soon as possible. ANTHC leverages funding from multiple sources, including the State of 550 Alaska, to get projects funded as quickly as possible and we are committed to fully 551 participating in their process. We have also received a generous donation from the NVPL 552 (Native Village of Port Lions) in the amount of $250,000. Kodiak Island Borough, Alaska Resolution No. FY2024-27 Page 12 of 15 Page 29 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 553 We would be grateful for any support from our partners to ensure state and federal funding 554 is allocated to keeping important rural Alaskan water and sewer projects such as ours 555 moving forward as quickly as possible. 556 557 30. The City of Port Lions Youth Activity Program 558 $20,000.00 559 Port Lions has identified a need for safe regularly scheduled events and activities for the 560 youth of our community. Our community has shown and proved that success shortly 561 follows graduates of all ages of our preschool, kindergarten, elementary, middle school, 562 and high school levels. We are seeking funding to instill a youth activity program in 563 partnership with popular local entities that will enable our youth to flourish. Indoor and 564 outdoor winter and summer activities as well as activities reflecting the school districts 565 calendar will be our base focus. 566 567 31. The City of Port Lions Harbor Building 568 $250,000.00 569 The City of Port Lions has identified a need to demolish and replace the Port Lions harbor 570 building. The building is beyond repair and the cost to repair it nears the cost to replace it. 571 The harbor building is important to our community as we are a strong and popular fishing 572 community. We hope to benefit and support our fishing community by providing a space for 573 our harbor master to shelter and complete their work while caring for the facility. Fishing 574 vessels would also be allowed a spacious dry storage locker for their equipment and career 575 needs. MR 577 32. The City of Port Lions Energy Independence 578 $250,000.00 579 The City of Port Lions would like to create energy independence for our community. As a 580 part of the Kodiak Electric Association Coop, we are already part of an energy efficient, 581 renewable energy electricity grid. However, we are concerned about the rising cost of 582 heating oil for our residents, especially our elders. 583 584 We would like to partner with the Native Village of Port Lions and the State of Alaska to 585 leverage resources that will help us complete a comprehensive community energy plan (with 586 audit and/or feasibility study). 587 588 Building on community energy planning that began in 2014, and using US Department of 589 Energy resources that are available to federally recognized Tribes, we propose a total budget 590 of approximately $250,000 to accomplish this planning effort. 591 592 33. The City of Port Lions Airport Expansion Project 593 $25,000,000.00 594 The DOT & PF and FAA have identified multiple function, operational and safety needs at 595 the Port Lions Airport through previous engineering analysis and scoping efforts. The 596 purpose of the project is to provide safety improvements to the Port Lions Airport and Kodiak Island Borough, Alaska Resolution No. FY2024-27 Page 13 of 15 Page 30 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 597 associated facilities that would address these deficiencies with the objective that the airport 598 would continue to fulfill its role as a community class airport. 599 The Alaska Department of Transportation and Public Facilities (DOT&PF) proposes to 600 design and construct improvements to the Port Lions Airport. The project would realign, 601 lengthen and widen the existing airport to meet Federal Aviation Administration (FAA) 602 guidelines to ensure continued service as a safe and efficient facility. 603 The airport is vital to the City of Port Lions as it serves as one of the only forms of 604 transportation in and out of the village during the winter months. Residents in the village 605 rely on flights in and out of the village for medical travel, grocery shopping and other 606 necessary appointments. 607 608 34. Kodiak Island Borough Bells Flats Commercial Truck Route Road Improvements 609 610 $10,475,000 611 This project will improve an existing circuit of roads in the Womens Bay area of the Kodiak 612 Road System. The roads included in this project are traveled by commercial trucks 613 transporting product from a gravel extraction site on Middle Bay Drive which produces the 614 bulk of the gravel materials for concrete and asphalt production in the Kodiak community. 615 It is estimated that this site can continue to produce a significant supply of gravel until at 616 least the year 2040. These roads also support approximately 350 residents and other 617 small business operations. A traffic pattern utilizing this loop of roads has been established 618 to minimize collision potential. Empty gravel hauling trucks enter the gravel extraction site 619 at one location and exit at a separate location, allowing the trucks to travel one-way along 620 the circuitous path. This project will preserve improve road surfaces by reconstructing 621 approximately three (3) miles of roadway including Sargent Creek Road, Salmonberry 622 Drive, Middle Bay Drive, and Bells Flats Road in the Bells Flats Subdivision approximately 623 eight miles south of the City of Kodiak. These routes all link together and are the main loop 624 through the Women's Bay Area. Reconstruction of the Sargent Creek Road will begin at 625 Rezanof Drive and extends to the intersection of Bells Flat Rd. continuing from the 626 intersection of Salmonberry Dr to the end of Middle Bay Drive (approximately 2 miles of 627 paved road surface). The intersection of Bells Flat Road and Sargent Creed Rd, including 628 all of Salmonberry Drive, back to the intersection Bells Flat Rd to Middle Bay Dr will also be 629 reconstructed (approximately 1 mile of gravel/RAP road surface). Existing pavement will be 630 milled and repaved, RAP surface areas will be paved, and subsurface improvements to be 631 completed on portions of the project as well as 8 culvert replacements. Sargent Creek 632 road, included in this project, is the single road for entry into and exit from the subdivision, 633 thus connecting all residents of the subdivision with goods and services such as medical, 634 educational, travel (airport and Alaska Marine Highway), grocery, home goods, repair, etc. 635 in the greater Kodiak city area. 636 637 35. Kodiak Island Borough Pedestrian Pathways to North Star Elementary School 638 639 $2,000,000 640 This project will provide safe pedestrian access to an elementary school located atop a hill 641 and surrounded by residential neighborhoods without sidewalks along the narrow unpaved 642 roads. It also connects to a pedestrian/bike path along an arterial road that is popular Kodiak Island Borough, Alaska Resolution No. FY2024-27 Page 14 of 15 Page 31 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 643 among residents and visitors for commuting and recreational use, and a recreational trail 644 that follows a nearby creek. 645 A separated five -foot -wide pedestrian gravel pathway will be constructed along two 646 residential roads leading to an elementary school. A separated pedestrian pathway 647 addresses the risk for vehicle -pedestrian interactions, particularly when roads are snow 648 and/or ice laden, by constructing a gravel pathway outside of the roadway. The dangerous 649 walking conditions during winter have necessitated a hazardous bus route for students 650 living within one mile of the school, provided by the Kodiak Island Borough School District. 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 ADOPTED BY THE PLANNING AND ZONING COMMISSION OF THE KODIAK ISLAND BOROUGH THIS September 20, 2023 ATTEST: Bronwyn Currie, Permit Technician Kodiak Island Borough, Alaska KODIAK ISLAND BOROUGH A, L L5rDA4- Alan Schmitt, Chair Resolution No. FY2024-27 Page 15 of 15 Page 32 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. CITY OF KODIAK RESOLUTION NUMBER 2023-04 A RESOLUTION OF THE COUNCIL OF THE CITY OF KODIAK ADOPTING A FY2024 STATE CAPITAL IMPROVEMENT PROGRAM LIST WHEREAS, the City of Kodiak uses a Capital Improvements Program planning process to identify the capital improvement project needs of the community: and WHEREAS, this identification and planning process plays a vital role in directing the City's administration and is utilized as a long-range planning and policy setting tool for City infrastructure maintenance and enhancement: and WHEREAS, the City of Kodiak is committed to paying its way to the greatest extent possible. but the cost of some of the City's capital project needs are greater than the resources available locally; and WHEREAS, the Kodiak City Council has identified and prioritized capital improvement projects for submission to the Alaska State Legislature and Governor for funding consideration due to their significance and/or magnitude; and WHEREAS, the City of Kodiak relies upon the State of Alaska's legislative and matching grant programs and the Community Assistance Program to continue to keep its economy strong. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Kodiak, Alaska, that the following infrastructure replacementlimprovement projects and issues are considered of primary importance and are hereby adopted as the City of Kodiak's FY2024 State capital improvement project and issues list: 1. St. Herman Harbor Infrastructure Replacement. (Phase I & H) $16,000,000 (Phase III & IV) $40,000,000 St_ Herman Harbor (SHH) was built by the State of Alaska in 1982 and has been a vital facility for Kodiak's large and diverse commercial fishing fleet for over 40 years. The State of Alaska turned over all state owned facilities in St. Herman Harbor to the City of Kodiak in 1999. The facility provides safe moorage for more than 400 vessels from all over Alaska and the West Coast. With the exception of a few minor upgrades over the years, the original float system is beyond its useful life and is in critical need of replacement. The proposed project would result in the reconstruction of St. Herman Harbor with the replacement of most of its float system in four phases. Currently. the harbor has been losing one dock per year due to aging and the saltwater elements. A dock loss results in 2 vessel berths along with the revenue generated for the harbor. This rate of failure is likely to increase in future years as the existing docks further deteriorate. The latest inspection report shows many portions of the facility are in very poor condition. The forty -year old float systems suffer from Resolution No. 2023-04 Page 1 of 4 Page 33 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. failing concrete, rotting walers and bullrails, and an outdated electrical system. These floats contain electrical pedestals, fire suppression water lines, safety ladders and supply water. In 2022, the City contracted with PND Engineers, Inc. (PND) to prepare a St. Herman Harbor Planning and Scoping Report that includes concept harbor layouts, cost estimates and construction phasing recommendations. The City is requesting $16 million to complete the first two phases. Phases III & IV estimated project development cost is approximately $40,000,000. Modernizing and expanding our port infrastructure is critical to remaining competitive in maintaining our status as an important commercial fishing community. Waterfront facilities and marine infrastructure are a critical element to the City of Kodiak and the State of Alaska, supporting a large portion of the City's commerce, industry, transportation, and recreational needs. 2. Waste Water Treatment Plant Facility $1,900,000 The City of Kodiak Treatment Plant operates under an Alaska Department of Environmental Conservation (ADEC) APDES permit. The first phase of a larger project to upgrade the City of Kodiak Waste Water Treatment Plant was to evaluate the facility for immediate system needs. The last major maintenance upgrade to the facility was in 1999. The condition and evaluation assessment included all major components within the plant interior and exterior, the out -buildings and three aeration basins; including all mechanical equipment needs. Alaska Pollutant Discharge Elimination System (APDES) permitting requirements were included during this assessment. Included in the facility rebuild assessment is the supervisory control and data acquisition (SCADA) system to interface with the 34 sewer lift station pumps and waste treatment at the facility. This facility with its labyrinth of connecting sewer lines, directly serves 2667 City of Kodiak and Kodiak Borough households including commercial businesses. The Treatment Plant also serves the U.S. Kodiak Coast Guard Base and the Pacific Spaceport Complex indirectly with our certified laboratory testing and waste disposal; not to mention NOAA vessels, the Alaska Marine Highway vessels and the expanding cruise ship industry stopovers in our Kodiak Harbors. The City of Kodiak is requesting Federal funding in the amount of $1.9M to begin design efforts leading to the construction of this critical infrastructure Waste Water Treatment Plant project that will support the wastewater needs of the community for the next twenty years. 3. New Fire Department Emergency Response Vehicle $2,350,000 The City of Kodiak has an important request to replace a critical need fire suppression vehicle, the city's lone ladder truck. The current vehicle is twenty-three years old and the industry standard requirements subject this aging ladder truck to complete inspection each year to certify its continued use. This requires a U.L. certified inspection causing the city to prioritize limited funding each year. The age of the apparatus also corresponds to increased maintenance needs. Some of the systems built-in to the apparatus are no longer supported causing increased difficulty and cost to maintain the apparatus in a `ready' state. Resolution No. 2023-04 Page 2 of 4 Page 34 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. The primary purpose of this 105' foot ladder truck is used for fire suppression of the shoreside seafood processor plants which have vehicle access from the upland side. The need to reach out over the buildings or any other multi-level buildings provides critical suppression and rescue capabilities when many lives are at risk. This unique vehicle also serves as the high - angle rope rescue platform for emergency calls over vertical terrain. 4. Transportation Infrastructure Projects $3,750,000 • Mill Bay Road Rehabilitation — $2,000,000 Bristol Engineering Services Company LLC has completed the City of Kodiak's Long Range Transportation Plan, Mill Bay Road is the city's top priority. This project would remove and replace existing 4 -inch asphalt pavement from the intersection of Upper Mill Bay Road to Benny Benson Drive (approximately 1.4 miles or 7400' in length). Paved width is 34 feet wide. This primary arterial city road provides access to schools, medical services, food and goods supplies, and many other support businesses. The average daily traffic volume is 7,680 vehicles per day. • Mission Road Rehabilitation — $1,750,000 Mission Road is identified as another high priority road in the city. Perhaps one of the earliest built road in Kodiak's history and a clear public priority. The pavement and underground utilities is among the worst of the roads in the city. Reconstruct with modification to create a one-way road section (including complete replacement of the road bed to a depth of at least 3 feet) beginning at Erskine St and ending at intersection of Ismailov and 12th (approximately 0.5 miles or 2600' in length). Project would include new 6 -foot wide sidewalk located on the uphill side of the street, drainage (presently there is no storm drainage infrastructure the entire length) and lighting improvements to tie into existing facilities at both termini. Bed rock should be anticipated on the uphill side of the road. Additional utility work anticipated by the City is replacement of 1956 -era water and sanitary sewer mainlines (and service reconnects) for the entire length. This work scope would be accomplished concurrent with the other work but the cost is not included in this estimate. This urban major collector, experiences 1,610 to 2,330 vehicles per day. FY 2024 City of Kodiak Supported State Issues:_ 1. Requesting an increase of State funding for Community Jails. 2. Investments in infrastructure to address food security. 3. Support continued investment in Ports and Harbors. 4. Support Water and Wastewater State Revolving Fund Program and Loan Forgiveness Resolution No. 2023-04 Page 3 of 4 Page 35 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... ATTEST: CITY CL41tK Resolution No. 2023-04 Page 4 of 4 AGENDA ITEM #2.a. CITY OF KODIAK l�j 01�/��� - MAYOR Adopted: February 13, 2023 Page 36 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. CITY OF KODIAK RESOLUTION NUMBER 2023-07 A RESOLUTION OF THE COUNCIL OF THE CITY OF KODIAK AMENDING RESOLUTION NO. 2023-05 ADOPTING THE FEDERAL FISCAL YEAR 2024 SUP- PORTED FEDERAL ISSUES LIST AND FISCAL YEAR 2024 FEDERAL CAPITAL LIST WHEREAS, the City of Kodiak uses a Capital Improvements Program planning process to identify the capital needs of the community and WHEREAS, this identification and planning process plays a vital role in directing the City's administration and is utilized as a long-range planning and policy setting tool for City in- frastructure maintenance and enhancement; and WHEREAS, the City of Kodiak is committed to paying its way, to the greatest extent pos- sible, but the cost of some of the City's capital project needs are greater than resources available locally; and WHEREAS, Kodiak City Council has identified capital project needs for submission to the Alaska Congressional Delegation for funding consideration due to their significance and/or mag- nitude; and WHEREAS, changes may be required as to how capital funding contributions for smaller communities like Kodiak, Alaska can be made at the Federal level; and WHEREAS, the City of Kodiak faces several issues generated by Federal legislation or rulemaking that are of importance to the City of Kodiak, Alaska, and which may adversely impact life in Kodiak by placing undue burdens on those who work and live in the community. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Kodiak. Alaska, that the following projects and issues are high priorities for the community and are hereby adopted as the City of Kodiak Federal Fiscal Year 2024 supported federal issues list and Federal Fiscal Year 2024 prioritized federal capital projects list: FFY 2024 City of Kodiak Prioritized Federal Capital Proiects List 1. St. Herman Harbor Infrastructure Replacement. (Phase I & Ill) $1.6,000,000 (Phase III & IV) $40,000,000 St. Heenan Harbor (SHH) was built by the State of Alaska in 1982 and has been a vital facility for Kodiak's large and diverse commercial fishing fleet for over 40 years. The State of Alaska turned over all state owned facilities in St. Herman Harbor to the City of Kodiak in 1999. The facility provides safe moorage for more than 400 vessels from all over Alaska and the West Coast. With the exception of a few minor upgrades over the years, the original float system is beyond its useful life and is in need of replacement. Resolution No. 2023-07 Page 1 of 4 Page 37 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. The proposed project would result in the reconstruction of St. Herman Harbor with the replace- ment of most of its float system in four phases. Currently, the harbor has been losing one dock per year due to aging and the saltwater elements. A dock loss results in 2 vessel berths along with the revenue generated for the harbor. This rate of failure is likely to increase in future years as the existing docks further deteriorate. The latest inspection report shows many por- tions of the facility are in very poor condition. The forty -year old float systems suffer from failing concrete, rotting walers and bullrails, and an outdated electrical system. These floats contain electrical pedestals, fire suppression water lines, safety ladders and supply potable wa- ter. In 2022, the City contracted with PND Engineers, Inc. (PND) to prepare a St. Heenan Harbor Planning and Scoping Report that includes concept harbor layouts, cost estimates and con- struction phasing recommendations. The City is requesting $16,000,000 to complete the first two phases. Phases III & IV estimated project development cost is approximately $40,000,000. Modernizing and expanding our port infrastructure is critical to remaining competitive in main- taining our status as an important commercial fishing community. Waterfront facilities and marine infrastructure are a critical element to the City of Kodiak and the State of Alaska, sup- porting a large portion of the City's commerce, industry, transportation, and recreational needs. 2. Waste Water Treatment Plant Facility $1,900,000 The City of Kodiak Treatment Plant operates under an Alaska Department of Environmental Conservation (ADEC) APDES permit.The first phase of a larger project to upgrade the City of Kodiak Waste Water Treatment Plant was to evaluate the facility for immediate system needs. The last major maintenance upgrade to the facility was in 1999. The condition and evaluation assessment included all major components within the plant interior and exterior, the outbuild- ings and three aeration basins; including all mechanical equipment needs. Alaska Pollutant Discharge Elimination System (APDES) permitting requirements were included during this assessment. Included in the facility rebuild assessment is the supervisory control and data ac- quisition (SCADA) system to interface with the 34 sewer lift station pumps and waste treat- ment at the facility. This facility with its labyrinth of connecting sewer lines, directly serves 2667 City of Kodiak and Kodiak Borough households including commercial businesses. The Treatment Plant also serves the U.S. Kodiak Coast Guard Base and the Pacific Spaceport Com- plex indirectly with our certified laboratory testing and waste disposal; not to mention NOAA vessels, the Alaska Marine Highway vessels and the expanding cruise ship industry stopovers in our Kodiak Harbors. The City of Kodiak is requesting Federal funding in the amount of $1.9M to begin design efforts leading to the construction of this critical infrastructure Waste Water Treatment Plant project that will support the wastewater needs of the community for the next twenty years. 3. New Fire Department Emergency Response Vehicle $2,350,000 Resolution No. 2023-07 Page 2 0£4 Page 38 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. The City of Kodiak has an important request to replace a critical need fire suppression vehicle, the city's Ione ladder truck. The current vehicle is twenty-three years old and the industry standard requirements subject this aging ladder truck to complete inspection each year to cer- tify its continued use. This requires a U.L. certified inspection causing the city to prioritize limited funding each year. The age of the apparatus also corresponds to increased maintenance needs. Some of the systems built-in to the apparatus are no longer supported causing increased difficulty and cost to maintain the apparatus in a `ready' state. The primary purpose of this 105' foot ladder truck is used for fire suppression of the shoreside seafood processor plants which have vehicle access from the upland side. The need to reach out over the buildings or any other multi-level buildings provides critical suppression and res- cue capabilities when many lives are at risk. This unique vehicle also serves as the high -angle rope rescue platform for emergency calls over vertical terrain. 4. Transportation Infrastructure Projects $3,750,000 • Mill Bay Road Rehabilitation — $2,000,000 Bristol Engineering Services Company LLC has completed the City of Kodiak's Long Range Transportation Plan. Mill Bay Road is the city's top priority. This project would remove and replace existing 4 -inch asphalt pavement from the intersection of Upper Mill Bay Road to Benny Benson Drive (approximately 1.4 miles or 7400' in length). Paved width is 34 feet wide. This primary arterial city road provides access to schools, medical services, food and goods supplies, and many other support businesses. The average daily traffic volume is 7,680 vehicles per day. • Mission Road Rehabilitation — $1,750,000 Mission Road is identified as another high priority road in the city. Perhaps one of the earliest built road in Kodiak's history and a clear public priority. The pavement and under- ground utilities is among the worst of the roads in the city. Reconstruct with modification to create a one-way road section (including complete replacement ofthe road bed to a depth of at .least 3 feet) beginning at Erskine St and ending at intersection of Ismallov and 12' (approximately 0.5 miles or 2600' in length). Project would include new 6 -foot wide sidewalk located on the uphill side of the street, drainage (presently there is no storm drain- age infrastructure the entire Iength) and lighting improvements to tie into existing facilities at both termini. Bed rock should be anticipated on the uphill side of the road. Additional utility work anticipated by the City is replacement of 1956 -era water and sanitary sewer mainlines (and service reconnects) for the entire length. This work scope would be accom- plished concurrent with the other work but the cost is not included in this estimate. This urban major collector, experiences 1.610 to 2,330 vehicles per day. FY 2024 City of Kodiak Supported Federal Issues: Resolution No. 2023-07 Page 3 of 4 Page 39 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. • Authorization & appropriation for a General Investigation Study with the USACE for future development of a deep -water turning basin and additional pier space in the Ko- diak vicinity • Defense Community Infrastructure Program for USCG communities • Immigration Office in Kodiak • Kodiak Fisheries Disaster — Local Government Fish Tax Reimbursement ATTEST: �taTLt�I iq-As CITY CLOkK Resolution No. 2023-07 Page 4 of 4 CITY OF KODIAK MAYOR Adopted: March 23, 2023 Page 40 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. CITY OF OUZINKIE RESOLUTION 2023-07 CAPITAL IMPROVEMENT PROJECT LIST A RESOLUTION OF THE OUZINKIE CITY COUNCIL APPROVING THE REVISED FY 2024-2028 CAPITAL IMPROVEMENT PROJECT LIST WHEREAS, the Ouzinkie City Council has evaluated the Capital Improvement needs of the City of Ouzinkie and Developed a Capital Improvement Program List to address these needs; and; WHEREAS, the capital projects included in the attached Capital Improvement Program are necessary, to improve the health, safety and well-being of the residents of Ouzinkie and; NOW, THEREFORE BE IT RESOLVED that the attached Capital Improvement Program List establishes the 2024-2028 Capital Improvement Project Priorities for Ouzinkie. PASSED AND APPROVED by the Ouzinkie City Council on this 16th day of August, 2023. SIGNED: &—.'q Elijah Jackson, Mayor ATTEST: C Frei icori, Ofrk RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 1 of 9 Page 41 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. CITY OF OUZINKIE CAPITAL IMPROVEMENT PROJECT LIST FY 2024-2028 1. Ouzinkie Municipal All -Purpose Complex $4,807,50 The Ouzinkie City Offices have been housed, for decades, in an old BIA territorial school that is home to hundreds of bats, old lead paint, and an electrical and plumbing system that needs rigorous upgrading. The City Office Building consists of: offices, a conference room and meeting area, maintenance equipment rooms, supply rooms and a small apartment. We estimate that it would be less expensive to build from the ground up. Each year the community faces various emergencies like: earthquakes generating tsunami warnings and evacuations; winter storms that knock out power, downpours resulting in water facility breakdown to winter ice and summer potholes wrecking equipment. New situations such as the pandemic we are in bringing to the fore the lack of a physical location for locals seeking care, isolation and resources. This building with its own generator for power, would have storage of water, food and sleeping areas and would serve as a command center for the whole community and the surrounding areas on Spruce Island. Being placed at or above the 100 -foot inundation zone would be for the safety of the community, building, equipment, and employees. It would also ensure that the community would have a post emergency safe haven. The complex would enhance basic operations. Emergency management addresses extreme events, across all hazards and through the phases of mitigation, preparedness, response, and recovery. A place for our heavy equipment, fire engine, ambulance etc. would also be housed up in this area above the 100' mark to ensure that all this equipment would be available for post emergencies. There would be several areas along with offices and a conference/ meeting room that could house other much needed facilities for the community. A Teen and Youth Center, one or two studio apartments, a Rural Training Center and an entrance or outdoor area that would pay proper tribute to our men in uniform for their dedicated service to our country is something that is valued by our community. A memorial would be a welcome addition in recognition of their bravery, selflessness and commitment to the defense of our nation. A Teen and Youth Center where Ouzinkie's youth would have a fun and safe place to socialize, exercise and have positive interaction with peers and adults affiliated with the center. The Center could build strong character and realize our youth's development, healthy living and social responsibility. The mission would be to provide a safe, enjoyable environment where teenagers can engage in beneficial educational, and leisure - time activities. RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 2 of 9 Page 42 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. Part of the building could also be used as a Rural Training Center with the conference and meeting room serving a dual purpose as training and meeting rooms. Having a designated area for classes would broaden the opportunities available for both agency programs and actual opportunities for residents that have employment skill needs that are currently unmet. The intent would be to keep the scale of operation flexible and small in size so as to be able to adapt to changing vocation skill needs as well as providing focused individual instruction. ♦ Phase One -Design: $550,000 This would include design of the building which would include but not be limited to the administrative offices, meeting and conference area/ training areas, library, apartments, supply and maintenance/ parts area. ♦ Phase Two -Construction: $4,257,500 Moving of the office into temporary quarters. The City of Ouzinkie has a lot where a temporary office trailer could go while this construction is underway. It is believed that if construction starts in the early spring, then by late fall the project would be completed. This phase would also include site preparation and construction. 2. Electrical Distribution System $2,500,000 Age and exposure to salt -water atmosphere have revealed that all of the transformers on Ouzinkie's electric distribution system have rusted out. When the lids rust thru, water gets into the transformer causing extreme loads, short circuits and the potential, (due to buildup of gas pressure), of explosion with consequences to individuals and property in the vicinity. It is expected that this preventive renovation will reveal other situations such as individual poles that need replacement and rerouting of transmission lines. A highly critical and significant section of Ouzinkie's power is connected to the hydroelectric plant. This connection is by direct burial concentric neutral 7,200 -volt power lines. This quality of cable as it was installed has been estimated by Jim Develin, KEA's Electrical Engineer to have exceeded its normal expected life, and is subject to failure any day. The western section of town is serviced by the same type cable and there is no possibility of delivering power to these residents, temporary or otherwise when this failure occurs. It is desired that this project be engineered and project managed thru The Alaska Ener Authority. RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 3 of 9 Page 43 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. 3. Renewable Energy Projects A. Alternative Energy Wind Generation $2,500,000 Ouzinkie has utilized alternative energy with the use of hydro power for 20 years. This has worked well for the community, and has resulted in a large saving of fuel vs. diesel generation. The community wishes to enhance this component of our generation facilities with the addition of wind power. Spruce Island is located in an area with high potential for wind generation. The project is expected to take four phases to be incorporated into the present grid. Construction Phases Phase One: Analyze the two years of wind data collected in the process of site investigation for the new airport. Expected expenses $10,000 Phase Two: Construct a site-specific data collection wind tower for sizing of wind generation tower and generator. An engineering feasibility study to the applicable aspects of connecting solar to the present system. Running in tandem with diesel and hydro -electric. Expected expense $100,000 Phase Three: Construct and install generator and tower of estimated size of 200 KW. Expected expense $2,090,000 Phase Four: Install power control equipment to integrate equipment into the present grid utilizing the hydro/diesel combination of generation. Expected expense $100,000 Phase Five: Design and engineering, installation of SCADA computer controls and programmable logic controllers. Expected expense $200,000 The creation of green alternative energy is an increasingly promising solution to multiple challenges. Sustainable business and energy independence are keys to our economic revitalization. Solar could be part of the answer to affordable power for housing and business that will help offset the cost of electricity by diesel powered generators. B. Alternative Energy Solar Panels $1,750,000 Ouzinkie has an ideal area at the old Ouzinkie Airport for development of a solar farm that would power much of the energy needs of the community. With the need to cut our dependence on diesel fuel the community is looking at various alternative energy projects. Having a hydroelectric system has helped with the consumption of diesel, additional alternative energy working in tandem with the hydro would make Ouzinkie completely independent of diesel. RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 4 of 9 Page 44 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. The tremendous growth in the U.S. solar industry is helping to pave the way to a cleaner, more sustainable energy future. Over the past few years, the cost of a solar energy system has dropped significantly -- helping to give more families and businesses access to affordable, clean energy. When converted to thermal energy, solar energy can be used to heat water for use in homes and buildings; to heat spaces inside homes, greenhouses, and other buildings. Solar energy can be converted to electricity by Photovoltaic (PV devices or solar cells). Solar cells change sunlight directly into electricity. Individual PV cells are grouped into panels and arrays of panels that can be used in a wide variety of systems that power single homes, to power plants. 4. Landfill Storage Facility $60,000 Landfills are excavated or engineered sites where non -liquid hazardous waste is deposited for final disposal and covered. The construction of a Storage Facility here is intended to protect human health and the environment from the risks posed by waste. The containment building will be 60' x 80' completely enclosed, self-supporting structure (i.e., have four walls, a roof, and a floor) used to store or treat non -containerized hazardous waste. Since landfills are permanent disposal sites and are closed with waste in place installing such a structure will enhance health and safety for operators maintaining the islands dump station. The fabrication of covered storage will extend the life of this landfill a benefit for our limited island area. 5. Equipment Replacement $1,100,000 The city's equipment is aging out and needs to be replaced. Heavy equipment has been compromised due to being open to the salt air and other elements. A storage building for housing heavy equipment for both the Native Village of Ouzinkie and the City of Ouzinkie has been funded and is in its initial stages. 1. Fork Lift $250,000 2. Dump Truck $200,000 3. Caterpillar Excavator 320 $300,000 4. Sewage Pumping Truck $200,000 5. Backhoe/Loader $150,000 6. Municipal Port Facility Upgrades A. Zinc Replacement for Harbor and Dock $50,000 RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 5 of 9 Page 45 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. The Ouzinkie Boat Harbor was competed in 2001 and the dock was completed in 2012 and the zinc anodes on the metal pilings and dock face are in need of replacement due to electrolysis. Cathodic protection is a technique used to control the corrosion of metal surface. The simplest method to apply cathodic protection is by connecting the metal to be protected with another more easily corroded metal to act as the anode. Zinc is one of the metals commonly used as anodes. Due to the zincs being welded on means that divers will have to replace these zincs on both the harbor and dock. B. Electrical Upgrade and Water to Boat Harbor $50,000 The Ouzinkie Boat Harbor, when it was built, was designed with very limited electrical outlets. One group of 4 plug -ins at the end of each float. Our harbor is full and the need for electricity by the vessels has outgrown what is available. An upgrade to existing meter bases and additional bases to be put in at intervals along the three fingers to get rid of the multitude of electrical cords being used by individual users. The Harbor also does not have access to any fresh water. The installation of water lines to the three floats would eliminate the need to haul water from the central part of town. Fresh water would allow for local access for the boats and skiffs that moor at the Harbor and for transients that are overnighting and traveling through to other destinations and fishing grounds. C. Access Ramp at Harbor Engineering $1,500,000 Engineering will provide background and engineering design guidance for the Boat Harbor Vehicle Access Ramp. The study will address the needs of the project, identification and evaluation of available data that can be used to describe environmental (earth, water and weather) conditions affect the land above the harbor, and develop a detailed design and construction cost estimate based on the environmental concerns. Construction $1,500,000 Ouzinkie has a boat harbor breakwater for the protection of marine vessels and skiffs in the harbor area. Use of this facility has restrictions for commercial fishermen, skiff owners, and tourism vessels. Currently, access is restricted to a narrow gravel road from Spruce Street that goes down a hill to a narrow 10' x 3' wooden ramp that accesses the harbor grated walkway ramp. It does not allow for skiff to car/4-wheeler loading access. You have to unload your freight from your boat by hand, into carts, hand cart the freight up the grated ramp, up the wooden ramp, up a one lane S shaped gravel route to your vehicle. A vehicle accessible ramp would allow for skiff to car unloading. Handicap/Elder accessibility is almost non-existent. D. Fish Cleaning Station $50,000 RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 6 of 9 Page 46 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. Stainless steel will not rust or corrode, making them ideal for coastal use: the cleaning station design is for unsupervised operation in publicly accessible areas. It could accommodate multiple users at a time and can be integrated with water. Water access can be done with one -inch HTP pipe running across access ramp with hose bib on end. The disposal of fish waste will benefit Spruce Island Farms our food project which composts for rich soil. The fish cleaning station will have signs that list the rules and regulations for use. E. Public Restrooms $170,000 For comfort and convenience of community members and visitors to the village we would like to install a concrete slab enclosed restroom facility at the Ouzinkie Boat Harbor and at the new Municipal Dock. Currently the closest public facilities for the boat harbor are half a mile away; at the Tribal Cultural Center. There is a septic station at the start of the harbor road, it would not take much effort to construct and install such a facility. With Ouzinkie now being on the Alaska Marine Highway System people are waiting at the dock area where there are no restroom facilities available. This could be incorporated with a shelter for protection against inclement weather while waiting for the ferry. As part of the economic development of the municipal dock this public restroom facility would enhance the other projects that are planned for future development. 7. Community Road's Upgrade - Construction $3,275,000 The City of Ouzinkie has not had available, since original construction in the 1970's, material for maintenance and repair of the village roads. Road improvements would include road shaping and crowning, drainage and culvert improvements, chip seal surfacing and dust control. The road improvements would improve vehicle and pedestrian safety and eliminate destructive potholes. Recent construction of a sewer project in the village has required digging up the village streets, causing damage that is not restorable under the constraints of the village sewer and water project budget. The net effect is excess wear and damage to not only the village utility vehicles such as the dump truck, electric utility vehicles, fire and ambulance services, but to the vehicles utilized by residents in the normal pursuit of personal or vocational business. Excess wear and damage have been noted on the grader used for snow removal. Repair of this item requires sending the equipment out of the village on a landing craft at considerable expense for repair. Individual residents can only afford to absorb their own personal losses. There was a planned airport construction project in Ouzinkie in 2008; the project has provided the opportunity for tremendous cost -savings for small local projects that would otherwise not be practical from a construction mobilization standpoint. Throughout RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 7 of 9 Page 47 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. Alaska, agencies and communities look for these cooperating project opportunities. Ouzinkie understands this is an opportunity to focus their efforts. 8. Alaska Marine Highway - Tustumena Replacement Replacing the troubled Tustumena ferry, which was out of commission for nearly a year, is the top priority of both the Marine Transportation Advisory Board, and the coastal communities that the M/ V Tustumena serves. The M/V Tustumena provides year-round service to Kodiak area, and journeys to the Aleutian chain ten times each year, providing a critical transportation and tourism link that affects the economies of each community served by this vessel. The ferry is also a critical piece of infrastructure necessary for the viability of economic development in rural coastal communities in the Gulf of Alaska. Recent vessel aging problems and repair delays are well documented and have created significant, recurring service disruptions and outages in the region. The M/ V Tustumena is at the top of the queue in the AMHS Vessel Replacement Fund, and the legislature appropriated $10 million from this fund in 2013 for the design of a new ocean-going vessel to replace the M/ V Tustumena. The Alaska Department of Transportation and Public Facilities has begun the design process and estimates that it will take 18 months to complete with construction of the new vessel costing as much as $210 million; since it will take another two to three years to construct the new vessel and ready it for service, it is imperative to develop and implement a strategy to ensure construction funding is in place by 2015 to allow an immediate start of vessel construction. 9. Anton Larsen Bay Road Extension $8,000,000 Year around boat access to the Anton Larsen Bay Road has public safety and emergency preparedness components as well as recreational and economic efficiency/ development elements. The prevailing Kodiak weather pattern, especially in the winter, is from the North East. This pattern often brings fog, rain, wind and large seas. During N.E. "blows' vessels often cannot travel to Kodiak via Spruce Cape and frequently smaller bush airplanes, and sometimes the U.S. Coast Guard, cannot fly to small communities like Ouzinkie, Port Lions, Afognak Island Russian Village, Danger Bay Logging settlement, and numerous, hunting, sport fishing, and commercial fishing camps and recreation and cultural development sites. However, access to Kodiak is possible by boat via Anton Larsen Bay as the route lies in the lea of the N.E. winds. Nevertheless, access to Anton Larsen Bay is stopped during most of January, February, March and sometimes April due to Anton Larsen Bay freezing over. Year -around Anton Larsen Bay Road salt water access would give residents of Ouzinkie, Port Lions as well as the whole west side of Kodiak Island access to Kodiak for emergencies during bad N.E. weather and give Kodiak residents access to the west side of Kodiak Island. In addition, the route is closer RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 8 of 9 Page 48 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... AGENDA ITEM #2.a. to these communities and Kodiak residents would use the extended "year around" road access to increase economic and recreational opportunities during the winter. 10. Public Facilities Development A. Boardwalk Repair/Replacement $100,000 Ouzinkie's wooden boardwalk is an identifying feature of the community and provides for a scenic stroll along our coastline. Unfortunately, City budget constraints have not allowed for proper routine maintenance and our boardwalk is in desperate need of extensive repairs or a complete replacement. Ouzinkie residents frequently travel the boardwalk to get from one end of the community to the other and it is a highlight of our village tour. Ensuring its continued presence in our community is a priority for many Ouzinkie residents. B. Community Development $200,000 The City of Ouzinkie has many trails and recreational spots that have been in existence for time immemorial and should be taken care of especially that Ouzinkie is working on drawing tourism to the village. Scenic outlook viewing shelters, fire pits, benches, outdoor toilet facilities, trail maintenance, small bridges, and camping facilities would contribute to the development of this tourism and economic development. In keeping with tourism, a water -front area of shops downtown would be an attraction to tourists where they could buy from local artists. The community needs an outdoor recreation site. A place where activities such as baseball, volleyball, basketball, tennis, track, etc. can be conducted. The facility could also include a camping and barbecue area for outdoor community events and tourist events. C. Upgrade to Freezer Building/Fish Processing Facility $350,000 The existence of our community's freezer building/fish processing facility represents a great deal of opportunity and un -utilized potential. The primary reason for its non- operational status is that the cost of operation is too high and the village cannot afford its associated costs. Some modifications are required to update the facility and maximize its job -creating and income -earning potential, such as a ramp and an easy access point for unloading fish and finished products. However, the primary issue which must be addressed is lowering the costs of utilities. Having the facility linked up with solar panels, wind turbines, etc. would lower the cost of the round-the-clock power consumption required to keep the catch cold and allow the village to realize a profit from its efforts. This would also facilitate the community in its ability to "brand" itself, selling an array of top-quality, locally caught fish to a wide range of consumers. RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 9 of 9 Page 49 of 109 Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im... KODIAK ISLAND BOROUGH STAFF REPORT DECEMBER 14, 2023 4 ' x ASSEMBLY WORK SESSION SUBJECT: Discuss Approach To Holding A Strategic Planning Meeting ORIGINATOR: Aimee Williams, Borough Manager RECOMMENDATION: DISCUSSION: ALTERNATIVES: FISCAL IMPACT: OTHER INFORMATION: Kodiak Island Borough Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Page 50 of 109 0 (ODD AGENDA ITEM #2.b. L�,e F U tUr� _ 2022-2027 , s tr at eic g Plan 0 SSW CONSULTING Page 51 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. A Message From the Steering Commitee In Sitka, we value community and quality of life. We are known for our natural beauty, rich history, and cultural heritage. We have a small-town atmosphere where neighbors know each other and are willing to lend a helping hand. Over the past several decades, Sitka has grown from a quiet logging and fishing town to a bustling tourism destination and a thriving maritime industry. This growth has given way to additional developments, such as a vibrant downtown showcasing locally owned businesses, growing regional community healthcare system, and expanded government services to support the community. With growth comes change, but also the opportunity to chart our own course for the future. Our community has weathered a lot over the past few years — a global pandemic, record -high inflation, and political polarization, to name a few. Additionally, we are facing complex challenges, such as increased demand for housing options, record levels of tourism, food security, rising costs and demands for infrastructure maintenance, and changing needs to support today's workforce. While we have a lot of priorities in our community, the reality is we, as the local government entity, cannot focus on everything at the same time. As we look ahead to the future of our community, we have the opportunity to collectively decide the direction in which we want to go. Equally important, we must be strategic about our resources and the decisions we make to ensure we arrive at our desired destination. Discuss Approach To Holding A Strategic Planning Meeting Our core purpose is to provide public services that support a livable community for all. For this reason, we pursued the development of a strategic plan in early 2022. This plan is a five-year road map to guide our organization in achieving our shared vision. Rooted in a substantial outreach effort to gather input from the Assembly, community members, local partner organizations, and the CBS organization, the strategic plan is focused on goals and tactical actions for the CBS to achieve the community's highest priorities over the next five years. The planning process also accounts for the significant input gathered during the recent Comprehensive Plan update process as well as an analysis of current community conditions and trends. Over the past year, we have engaged hundreds of community members and collected thousands of comments to make Sitka a sustainable and livable community for all. We are grateful to everyone who shared their ideas through the community survey, interviews, community group conversations, and focus groups. Thank you for your investment in the future of Sitka! We will use this plan to chart the course for the CBS organization and seek out the partnerships that will bring our goals to life. We will regularly communicate our progress and keep this plan updated to maintain its responsiveness and relevance to our community. Our team looks forward to growing the future together. 2 Page 52 of 109 99 Alone we can do so little; together we can do so much. - Helen Keller form Acknowledgments ASSEMBLY Steven Eisenbeisz, Mayor Kevin Knox, Deputy Mayor Kevin Mosher, Vice Deputy Mayor Thor Christianson Crystal Duncan Rebecca Himschoot David Miller CONSULTING TEAM Sara Wilson, Owner/Principal Ashley Sonoff, Associate n SSW CONSULTING STEERING COMMITTEE Steven Eisenbeisz, Mayor Rebecca Himschoot, Assembly Member John Leach, Municipal Administrator Melissa Henshaw, Public & Government Relations Director Amy Ainslie, Planning Director Robert Baty, Police Chief Scott Elder, Electric Utility Director Melissa Haley, Finance Director Michael Harmon, Public Works Director Jess leremia, Library Director Valerie Ruff, Human Resources Director Ron Vinson, Asset Manager tat Table of Contents 06 Introduction (07 Goals + Process 11 Mission, Vision, Values +Goals 14 Action Plan 20 Plan Implementation 22 Appendix 74� In the face of uncertainties, planning defines the particular place you want to be and how you intend to get there. - Peter Drucker 66 A6 Introduction WE ARE GROWING THE FUTURE TOGETHER! Sitka is known for its small-town friendly atmosphere, vibrant local economy, and stunning natural beauty. We want to preserve what residents love about Sitka while ensuring our community is a livable place for all Sitkans for years to come. The CBS Strategic Plan is our five-year road map to guide the organization as we pursue the vision and goals reflective of the current community and organizational needs. WHAT IS A STRATEGIC PLAN? The Strategic Plan is an opportunity for the community to reflect on the current state of our community and organization, determine what we want Sitka to be in the future, and ultimately define how the organization will drive this vision forward in alignment with our mission and values. A strategic plan acts as a compass. It helps our organization focus on a set of shared goals and guide it toward achieving them. The strategic plan provides defined goals and actions, rooted in community -identified priorities and informed by an understanding of current trends, along with an action plan and key performance indicators to measure progress over time. Furthermore, it fosters a culture of strategic management for the organization by serving as a resource to guide both long-term planning as well as daily decisions concerning the organization's delivery of services and the community's future. The Strategic Plan will guide the work of the CBS organization over the next five years through the development of a mission, vision, values, goals, and actions that will help improve the services we provide to our community. The plan includes an implementation structure to promote accountability and transparency as we pursue our goals and actions. Additionally, the implementation structure supports regular updates to keep the plan relevant and responsive to community and organizational needs. The process builds on the input collected from the comprehensive planning effort in 2018 and includes a significant outreach effort in 2022 to gather input from the community, its partners, and the organization. WHY NOW? The City and Borough of Sitka (CBS) organization has weathered many changes over the last few years. This period of transition is a great opportunity to refocus with the development of a mission, vision, goals, and how to strategically align the resources to best serve our community over the next five years. Our community is facing complex challenges, such as housing needs, growth in tourism, cost of living affordability, infrastructure, food security, and supporting our local economy. To address these issues, it will require focused efforts, collaboration with community and regional partners, and strategically aligning our community resources to create positive change. We highly value our community and want CBS services to be responsive to the needs of all Sitkans. The strategic planning effort has been an opportunity to come together to decide the future direction of our community. While we can't focus on every issue simultaneously, this is a way to understand the community's highest priorities for the next five years and guide the organization in addressing those needs. AGENDA ITEM #2.b. Strategic Plan Goals + Process We set out to achieve the following goals during this process: Build a plan to guide Sitka over the next five years Develop a plan informed by the public engagement gathered through the Comprehensive Plan update and through additional targeted outreach Identify the vision and values, critical strategic initiatives, high-level goals, and a reporting framework to guide the City's work WHAT IS THE DIFFERENCE BETWEEN A COMPREHENSIVE PLAN AND A STRATEGIC PLAN? Sitka's Comprehensive Plan is a long-term (10+ years) guide for policy decisions related to community land use and development. The City and Borough of Sitka's Comprehensive Plan has been in existence since 1976 with regular reviews and updates, the most recent being May 2018. In contrast, the Strategic Plan takes a shorter -term look (5 years) and is focused on the delivery of services to the Sitka community. The strategic plan will help us focus on our goals and guide us toward achieving them with tactical action items. Strategic Shorter -term (5 years) Strategic management to guide delivery of services Focused on setting goals for organization and tactical actions to achieve them STRATEGIC PLAN PROCESS F 40 term (usually 10+ years) Guides land land -use policy and development Focused on land -use, development, transportation, and infrastructure Community and organizational engagement is the foundation of the strategic planning process. Building on the results of the large-scale community engagement conducted during the Comprehensive Plan update process in 2015-2018, the strategic plan community engagement focused on facilitating inclusive opportunities to ensure the vision and values are reflective of all people in Sitka. CBS staff was also engaged in the process to provide input and direction on operational improvements for the organization. VA Page 57 of 109 Discuss Approach To Holding A Strategic Planning Meeting Shorter -term (5 years) Strategic management to guide delivery of services Focused on setting goals for organization and tactical actions to achieve them STRATEGIC PLAN PROCESS F 40 term (usually 10+ years) Guides land land -use policy and development Focused on land -use, development, transportation, and infrastructure Community and organizational engagement is the foundation of the strategic planning process. Building on the results of the large-scale community engagement conducted during the Comprehensive Plan update process in 2015-2018, the strategic plan community engagement focused on facilitating inclusive opportunities to ensure the vision and values are reflective of all people in Sitka. CBS staff was also engaged in the process to provide input and direction on operational improvements for the organization. VA Page 57 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. GROWING THE FUTURE TOGETHER WAS ORGANIZED INTO THREE PHASES PHASE 1: GATHERING COMMUNITY IDEAS After kicking off the project in February 2022, the Steering Committee, comprised of 12 representatives from CBS Departments and the Assembly, developed a Communications and Engagement Plan to assist with gathering ideas. The Steering Committee committed to an inclusive process that sought to include the input of all voices, whether through previous engagement in the Comprehensive Plan update process or through new outreach opportunities for the strategic plan. Additionally, the Steering Committee prioritized process integrity throughout the outreach efforts to build relationships and create trust that enables reliable government activity in a transparent environment. The Steering Committee guided the process and designed multiple opportunities and tools to engage the community and organization in the Strategic Plan development, including: • Strategic planning workshop • Community survey • Presentations and outreach to Boards, Commissions, + Community Groups • Community leader interviews • CBS staff survey • Focus groups • Utility bill insert Fact sheet • Social media, media release, and radio • Project website Communication + Engagement Goals The following goals and values guided the team's engagement efforts: Engage targeted stakeholders to develop a five-year strategic plan that will guide CBS Build on the results of the broad community engagement conducted for the comprehensive planning process Create project awareness across the community and organization and facilitate inclusive outreach opportunities to ensure the vision and values are reflective of Sitka 8 Page 58 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Communication + Engagement Values INCLUSIVE: this will be an inclusive process that seeks to include the input of all voices - whether through their previous engagement in the comprehensive plan process or through new outreach opportunities for the strategic plan. The process will seek to be inclusive and accessible to foster trust and build relationships to help achieve the resulting goals and actions. INTEGRITY: We will ensure process integrity through our outreach efforts. Process integrity is the ability to build relationships and create trust that enable reliable government activity in a transparent environment. STRATEGIC PLAN Engagement - • TASK /PROCESS MAR APR MAY UN UL AUG IEP Strategic Planning Workshop sit kag rowing thef u turetog eth a r. org NGAGEMENT BY THE #'S 9 Page 59 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. PHASE 2: DEVELOPING THE STRATEGIC PLAN The project team carefully analyzed the thousands of community comments gathered through the outreach activities to identify common ideas, comments, and trends. Following the analysis, the project team organized the information into six outreach themes representing community priorities as shown below. Strategic Planning Outreach Themes Access to chi ldcare Afforda bi liDebt management and master plan Affordable Quality of Fiscalneeds Utility costustainabili Life ision Themes: Discipline to create/fostersustainability Impacts of tourism Food Security Collaboration DiversitIncrease engagement and Support existing industries:y+ Inclusion Fiscal Sustainabilityparticipation Tell CBS's story Economic Energy sustainability mmunicati Build relationships with a focus tourismInfrastructure Sustainable economic growthevelopme Economic development Engaggroups City's role to supporteme ommunications + engagemen Address barriers to participation economic growthProactive vs. reactive CBS as a convener Business support services Safety and training Proactive management Right size to level of service and Workforce development resources to support Succession planning Find revenue to address existing frastructur rganization evelneeds vs. adding new policies and procedures opmeIntegration and standardization of Address deferred maintenance Focus on asset management PHASE 3: ADOPTING THE STRATEGIC PLAN The project team presented the draft strategic plan to the Sitka Assembly on September 1st to gather feedback. The project team incorporated the Assembly's comments into the revised draft strategic plan and invited community members to review the revised draft online and provide comments. The project team incorporated the community comments to develop a final version of the strategic plan, which was presented to the Assembly for adoption on September 27th. 10 Page 60 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Mission, Vision Values + Goals WHY WE EXIST Provide public services for Sitka that support a livable community for all. OUR DESIRED FUTURE STATE CBS is an organization that values everyone and proactively works together to serve the community. We are fiscally sustainable, supporting a diverse economy and well-managed infrastructure. We are innovative in seeking ways to protect and preserve Sitka's natural environment. We are a respected employer where people enjoy their work and provide valued public services. 11 Page 61 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. WHAT GUIDES US PEOPLE INNOVATION INTEGRITY People are our greatest Innovation supports a Integrity guides our asset. We value all proactive approach to service delivery, people including our fulfilling our mission. We processes, and community, employees, are forward thinking and communication. We and visitors. We continuously working to are accountable to the appreciate the diversity improve our processes Sitka community, and of Sitka, and we respect and our people to we provide services in a and celebrate all people. provide efficient and transparent, honest, and We foster a safe and effective services to our ethical manner. welcoming environment community. for all. SUSTAINABLE Sustainability ensures we plan and deliver services with the future in mind. We are good stewards of taxpayer resources as well as our natural environment. SERVICE Serving the community is our job. We provide service with compassion, kindness, and excellence. We care about our community and organization, and this is reflected in our service levels. 12 Page 62 of 109 Discuss Approach To Holding A Strategic Planning Meeting Goals WHAT ARE OUR DESIRED OUTCOMES FOR OUR COMMUNITY AND ORGANIZATION? 1 Quality of Life Preserve the quality of life and affordability for all Sitkans Communication Improve communications and strengthen relationships within the community and organization 000 Sustainability Align resources and financial and economic policies with CBS'goals for a sustainable community Infrastructure Plan invest in infrastructure for future r*i and sustainable generations ## Service CBS is recognized as being a great place to work and ?� excellent service provider to the community T 1� Action Plan The Action Plan contains the policies, programs, and projects CBS will implement to fulfill the organization's mission and achieve the five-year vision and supporting goals. WHAT IS AN ACTION? The actions represent a policy, program, or project. The actions are organized by goal areas and support the overall organization mission and vision. The actions were informed directly by the ideas and priorities shared by community members and CBS employees during the strategic plan outreach process. The scope and timeline of the actions vary. Some actions are significant undertakings and will require multiple years to achieve, while others are smaller in nature and can be achieved in a shorter time frame. Regardless of size and scope, all actions play a critical role in improving the delivery of services to the community. AGENDA ITEM #2.b. WHO IS RESPONSIBLE FOR IMPLEMENTING THESE ACTIONS? The actions of the strategic plan are internally focused with the CBS organization responsible for implementing these actions. Each action will be assigned to a project lead and team of CBS employees. While CBS plays a critical role in achieving these actions, the organization, and ultimately the community, will be most successful through working together with community partners to implement the plan. Page 64 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Goal 1: Preserve the quality of life for all Sitkans 1.1 Convene community partners to develop a community -wide strategy to improve access to childcare 1.2 Develop a plan to improve housing options for all in Sitka Identify opportunities to relieve the burden of utility costs 1.4 Review the impacts and benefits of tourism, and developi, <� policies that prioritize the quality Z of life for all Sitkans��`_ 1.5 Convene community partners to develop an action plan that will address the challenges of food security -- 15 Page 65 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Goal 2: Improve communications and strengthen relationships within the community and organization 2.1 Develop a communication and engagement plan to increase engagement and participation through storytelling and enhancing Sitka's communication tools and networks Identify opportunities to foster relationships with underrepresented groups/populations in the community and implement findings to improve service delivery to these groups ?.3 Annually convene non -profits, CBS boards and commissions, and other community groups for a summit to discuss community challenges, updates, and opportunities for collaboration 16 Page 66 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Goal 3: Align resources and financial and economic policies for a sustainable community 3.1 Develop a fiscal policy that includes guidelines for areas of fiscal operations such as debt management, infrastructure replacement, metrics for fiscal health of funds, reserves, and other a rea s. 3.2 Prepare financial forecasts and life cycle models for all assets to bring resources in alignment with the City's top priority needs 3.3 Convene economic partners to explore the addition of business support services and employment training programs Identify and implement policies that will balance the economic benefits of tourism with the impacts on Sitkan's quality of life 17 Page 67 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Goal 4: Plan and invest in sustainable infrastructure for future generations 4.1 Identify and pursue funding to address existing capital needs and deferred maintenance ,I -t./- Develop asset management plans for future capital investments 4.3 Identify the levels of service for CBS's infrastructure and identify the resources needed to support these levels 3 4.4 Collaborate with public land management agencies w► and stakeholders to maintain and develop sustainable active transportation infrastructure, ■ including parks, fields, cabins, trails, and water access 18 Page 68 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Goal 5: CBS is recognized as being a great place to work and ex- cellent service provider to the community 5.1 Develop a workforce development plan that outlines clear policies for staff training and professional development Prepare a succession plan that addresses development of the current workforce and future workforce recruitment and retention strategies 5.3 Improve customer service levels and evaluate process improvements for service delivery Identify and develop necessary standard policies and procedures to promote organization - wide stability and service -level consistency Develop an internal communication and engagement plan and policies to improve the flow of information in the organization and increase employee engagement 19 Page 69 of 109 Discuss Approach To Holding A Strategic Planning Meeting STRATEGIC PLAN NEXT STEPS Following the Assembly's adoption of the strategic plan, CBS staff will use input and direction from the Assembly to prioritize the actions for implementation based on staff capacity and available resources. CBS staff will identify leads for each action. These leads will be responsible for the following: Overseeing the implementation of the action Developing a project charter (will identify the project team, stakeholders, timeline, key performance indicators, etc.) Identifying resources for implementation Engaging and updating the Assembly,Boards/Commissions, Organization, and the Community as needed Reporting progress, challenges, and opportunities to consider during implementation Recommending updates to the action if needed Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. rI Once the action leads have been assigned and the work has been prioritized, the actions prioritized for implementation will be considered in the budget development process. This will help in identifying resources for the action implementation if needed. At the end of 2023, CBS staff will coordinate an annual progress report for the strategic plan. The progress report will document progress, challenges, opportunities, and potential updates to the actions as needed. This report will serve as a communication tool back to the Assembly and the community to maintain accountability in implementing the vision and goals. 411 Page 70 of 109 AGENDA ITEM #2.b. FOSTERING A CULTURE OF STRATEGIC MANAGEMENT While this is the first iteration of this strategic plan, it is intended to foster a culture of strategic management and guide the organization in developing a more efficient, effective, and transparent system of providing public services. The process below describes the recommended system for implementing the plan and making regular annual updates to it to ensure it remains relevant in meeting current community and organizational needs. Regular engagement from the community, the Assembly, Boards/Commissions, and the organization are essential to fostering a system that is responsive and accountable. The graphic below illustrates what the annual process will look like going forward to maintain alignment between the strategic plan, the budget, and the departments' work plans. It also highlights where the engagement will take place, so the community, elected officials, and staff understand when and how to participate and get involved in this process. It is recommended the strategic plan undergo a complete update every five years to conduct more comprehensive engagement, review the mission, vision, and values, and examine the broader community context. These major updates will ensure the five-year vision continues to serve as a North Star in guiding the community and organization. These community engagement efforts also help to foster strong relationships with Sitka's community and its partners and build support for implementing the goals. Strategic Plan Progress Implementation • Road Map Check -in Ongoing October/ • This road map shows how the Assembly, community, November Annual Report + Celebration and organization can get involved in identifying December goals for CBS. The process repeats each year with the destination being continuous community and • organizational improvement. Assign Assembly Priorities, Community Strategic Project Leads, Department et Survey/Town Planning KPIs, Budget Work Plans Hall Workshop Timelines Adoption December January/February December June June 44 • • • • ache Future l Boards + Strategic Plan Budget Commissions Update + Development o�� �° Workshop Adoption February- January February April Key 0— Sitka, Alaska Community Assembly/ Staff/ Engagement Policy Administration • • • 21 Page 71 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. The appendix provides more detailed engagement results gathered through the strategic planning process. These details provide additional context for the vision, goals, and actions in the strategic plan. COMMUNITY SURVEY Building off the community engagement data gathered as part of the Comprehensive Plan update process, the community survey aimed to capture what community members enjoy most about Sitka, how Sitka can be a better place for residents, what areas CBS should prioritize in the next five years, and their communication preferences for receiving information from CBS. The project team promoted the community survey using both traditional and digital methods, including an insert in the utility bill mailings, press release, promotion on local radio stations, CBS website, and social media channels. The community survey resulted in the most significant community response (689 respondents) of all outreach activities. To support our goal of inclusivity and include perspectives from all groups in our community, the survey included an optional question to collect respondents'demographic information. The following chart displays the demographic information provided by respondents who chose to answer the optional questions. The project team carefully reviewed thousands of comments to identify common themes and trends that would lay the groundwork for the strategic plan goal areas. `Source: American Community Survey 5 -Year Estimates Data Profiles, U.S. Census Bureau, 2019 *"Sum of responses is greater than 635 as some respondents made more than one selection. 22 -includes ACS categories "Some other race" and "Two or more races" Page 72 of 109 Discuss Approach To Holding A Strategic Planning Meeting Number of Respondents Percentage of Respondents Sitka Demographics" Total Population 635 7.7% 8,257 Gender Male 193 30.4% 51.4% Female 363 57.2% 48.6% Prefer not to say 4 0.6% Other 26 4.1% Did not respond 49 7.7% Age 18 and under 12 1.9% 23.6% 18-24 55 8.7% 5.3% 25-34 117 18.4% 14.3% 35-44 114 18.0% 14.5% 45-54 90 14.2% 12.7% 55-64 98 15.4% 14.5% 65. 99 15.6% 15.1% Did not respond 50 7.9% face/Ethnicity" White 445 70.1% 61.2% Hispanic, Latino, or Spanish origin 29 4.6% 5.9% Black or Afr can -Amer c 12 1.9% 0.4% Asian 22 3.5% 6.8% American Indian or Alaskan Native 1 77 12.1% 14.8% Native Hawaiian or Other Pacific Islander 16 2.5% 0.2% Middle Eastern or North African 2 0.3% Other (please 37 5.8% 16.7% Did not respond 62 9.8% `Source: American Community Survey 5 -Year Estimates Data Profiles, U.S. Census Bureau, 2019 *"Sum of responses is greater than 635 as some respondents made more than one selection. 22 -includes ACS categories "Some other race" and "Two or more races" Page 72 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Share what you like most about Sitka that we should we preserve into the future? wilderness arts culture downtown traii,sfriend ly small beauty safe public air great feel community water aCC2SS hiking owned sitka people activities town schools safety environment recreation fishing natural parks nature atmosphere businesses beautiful trail clean ocean sense opportunities outdoor local support events What is the most important thing Sitka should focus on in the next five years? haulneeds businesses childcare affo rd a b le Living energy live road housing land COSI need care families development industry making town tourism food economic City boat focus S itka locals education affordability residents keep community people use economy local climate keeping children infrastructure fishing better The Strategic Plan Steering Committee and Assembly completed stakeholder exercises to help the project team identify the groups and people for focused engagement through interviews and presentations. The project team met with 11 groups, including CBS volunteer boards/commissions as well as community organizations. The presentations included an overview of the strategic planning process and a discussion of what the group loves about Sitka, upcoming challenges, and how CBS should address those challenges. The community leader interviews included representatives from various community organizations throughout Sitka and gathered information related to what they love about Sitka, significant changes and/or trends, opportunities on the horizon, the community's most pressing challenges, priorities for the strategic plan, and recommendations for communications and engagement. The stakeholder exercises identified the Sitka Tribe of Alaska and Filipino community for targeted engagement in the for the strategic plan community outreach and the project team prioritized reaching these groups. While representatives from these groups participated in the outreach activities, there is an opportunity for more dialogue. Ongoing engagement will be important in strengthening relationships with these groups for more effective outreach in the future. 23 Page 73 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. FOCUS GROUPS The project team invited interested community members to participate in a series of three focus groups during the first week in August to discuss the following topics: Key themes from community engagement survey Tourism + Economic Development Food Security The first focus group discussed the key themes that emerged from the community survey, community leader interviews, and presentations to Boards, Commissions, and community groups. These topics included housing, cost of living, tourism, sustainability, infrastructure, financial stewardship, economic development, and communications and engagement. The second focus group included representatives from the local business community and discussed tourism and economic development specifically, as well as the relationship between tourism and quality of life. The third focus group included representatives from the Sitka Local Foods Network, Alaska Food Policy Council, food banks, grocery stores, local food producers, and other community organizations. This group discussed food security and explored opportunities to alleviate high cost of food, increase access to fresh produce, improve environmental sustainability, and support disaster preparedness. Participants were encouraged to share their experiences, develop ideas, and discuss the role CBS should take in addressing these community priorities. The themes that emerged from the focus groups were consistent with the community input gathered in the survey, interviews, and presentations. The discussions helped guide the project team in finetuning the goals and actions to support community priorities. OUTREACH SUMMARY The project team provided opportunities throughout the process for the community to learn about the strategic planning process and provide input on the strategic plan. The following matrix outlines the themes from each outreach activity. 24 Page 74 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Outreach Activity Date Participants Themes Strategic Planning Workshop March 18 Cost of Living/Quality of Life • Fiscal Sustainability • Communications + Engagement • Organizational Development • Infrastructure • Economic Development Community Group Presenta- March -July 11 groups Love the community feel and access to nature tions Affordability— housing, food, cost of living • Growing retiree population/workforce shortage • Isolated economy/not enough services to support residents • Infrastructure maintenance • Encourage/support youth to stay in community • Housing • Support economic development • Workforce development Community Survey May - July 635 Cost of living • Housing • Food security • Cost of utilities • Childcare • Tourism • Quality of life • Economic development • Education Community Leader Interviews June - July 8 Love the community, nature, and quality of life • Housing — need more availability, concern about high cost • Balancing tourism with protecting quality of life • Cost of living — people are being pushed out • Lack of childcare • Housing - More efficient land use, open up new land, multi -family • Food — remove sales tax on food • Continued relationship with the Sitka Tribe of Alaska • Continued community engagement effort by City to build trust and positive relationship with community. Staff Survey June -August 56 • Opportunity to improve communication and engagement with employees • More employee support programs are needed • Employee pay should be evaluated • More access to professional development • Shared vision and goals for the team • Imbalance of workloads for departments • Need for customer service training • Cost of living has a major impact on staff Focus Groups June - August 35 Housing availability and affordability • Economic development • Tourism • Fiscal sustainability • Community engagement • Food security W. Page 75 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. The community outreach process gathered thousands of comments from community members for the strategic plan. The chart below provides a matrix of the goals and actions with comments gathered during the community engagement activities to provide context for action implementation. •. jAction Community 1. Preserve the quality of 1.1 Convene community Work with Sitka School District and other organizations to develop life for all Sitkans partners to develop a options for more before/after school care for school -aged children community -wide strate- and daycare for infants/toddlers. gy to improve access to childcare 1.2 Develop a plan to improve Apply for grants and/or other funding options to develop permanent housing options for all in af-fordable housing units. Sitka Open additional land for develop-ment. Change building code to allow for higher -density housing. Designate CBS employee to coordi-nate efforts, write grants, and work with community organizations. Workforce housing. 1.3 Identify opportunities to Explore utility bill credit program for sustainability measures taken on relieve the burden of utility property. costs 1.4 Review the impacts and Limit the days and numbers of cruise ships. Consider only allowing benefits of tourism, and cruise ships on weekdays. Create policies that support locally -owned develop policies that pri- downtown storefronts, including the transfer of ownership/manage- oritize the quality of life for ment. Planning for the boom and bust cycles of tourism and revenue. all Sitkans Allow one-way street option on cruise ship days to allow local access while giving tourists enough space. More opportunities for year-round employment. Branding and wayfinding to support town identity and consistent look and feel of community. Shop local first efforts. Convene local business owners to hear direct- ly from their experience in summer 2022 season. 1.5 Convene community part- Sitka Assembly declare food security a priority. ners to develop an action Secure land for community gardens. plan that will address Designate CBS employee to support community garden coordina- the challenges of food tion, gardening labor, grant writing and other funding opportunities to security support efforts, establishing and coordinating neighborhood resil- iency districts for community disaster preparedness. Remove the tax on food. Agricultural zoning to allow lower tax rate for people growing food. Lower utility rate for vertical gardening. Improve access to fresh produce. Vertical indoor gardening to provide year-round produce. Support soil health through composting. Priori- tize edible landscaping over ornamental on public land. Potential part- ners: Sitka Tribe of Alaska, University of Alaska, Sitka School District, local radio stations, Alaska Longline Fishermen's Association (ALFA), local grocery stores, etc. Town hall meeting with community mem- bers to discuss food security. Conduct a citywide emergency food drill. Educational programming for emergency food storage. Establish neighborhood resiliency districts to support emergency food pre- paredness. Work with fishing industry partners to donate seafood to food insecure community members. Create a pool of funds to support processing of seafood, storage, and distribution. 44 Page 76 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. 2. Improve communi- 2.1 Develop a communi- Town hall meetings with trained moderators. cations and strengthen ca -tion and engagement Social media. relationships within the plan to increase en -gage- Local media (newspapers, radio, etc.) community and organiza- ment and participa-tion Update CBS website. tion through storytelling and Public education on role of taxes, how money is allocated, etc. enhancing Sitka's com- munication tools and networks 2.2 Identify opportunities Sitka Tribe of Alaska to foster relationships Filipino community with underrepresented groups/populations in the community and imple- ment findings to improve service delivery to these groups 2.3 Annually convene non -profits, CBS boards and commissions, and other community groups for a community summit to discuss community chal-lenges, updates, and opportunities for col -lab - oration 3. Align resources and 3.1 Develop a fiscal policy financial and economic that includes guidelines policies for a sustainable for areas of fiscal op - community erations such as debt management, infrastruc- ture replacement, metrics for fiscal health of funds, reserves, and other areas 3.2 Prepare financial forecasts and life cycle models for all assets to bring resourc- es in alignment with the City's top priority needs 3.3 Convene economic Internships and mentorships with local businesses. partners to explore the ad- Align industries with courses offered at high school so graduates are dition of business support more prepared for available jobs. services and employment Foster partnerships between business community and Sitka School training programs District. Support working waterfront, fix seawall, affordable harbor rates 3.4 Identify and implement policies that will balance the economic benefits of tourism with the impacts on Sitkan's quality of life PVA Page 77 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. 4. Plan and invest in sus- 4.1 Identify and pursue fund- Higher property tax for non-residents. tainable infrastructure for ing to address existing Progressive income tax. future generations capital needs and de- Revisit property tax and sales tax exemptions for senior residents. ferred maintenance 4.2 Develop asset man- agement plans for future capital investments 4.3 Identify the levels of service for CBS's infra- structure and identify the resources needed to support these levels 4.4 Collaborate with public land management agen- cies and stakeholders to maintain and develop sustainable active trans- portation infrastructure, including parks, fields, cabins, trails, and water access 5. CBS is recognized as 5.1 Develop a workforce Training varies greatly by department - communicate opportunities being a great place to work development plan that and make it accessible to all and excellent service pro- outlines clear policies for vider to the community staff training and profes- sional development 5.2 Prepare a succession plan Conduct a salary survey. that addresses develop- Evaluate employee support and wellness programs. ment of the current work- Develop internship opportunities targeted for Sitka students. force and future workforce recruitment and retention strategies 5.3 Improve customer service Provide customer service training for employees. levels and evaluate pro- Bring more services online to allow people to do business with CBS cess improvements for outside of business hours. service delivery Evaluate improvements to trash service and receptacles. 5.4 Identify and develop nec- essary standard policies and procedures to pro- mote organization -wide stability and service -level consistency 5.5 Develop an internal com- munication and engage- ment plan and policies to improve the flow of infor- mation in the organization and increase employee engagement 28 Page 78 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. SUMMARY OF COMMENTS RECEIVED SEPT. 5-19 ON THE STRATEGIC PLAN The draft strategic plan was presented to the Assembly on September 1, 2022. Following the presentation, the plan was posted online with a community comment form to submit feedback on the draft plan. Twenty one comments were submitted, and a summary of those comments are provided below: Do you feel the CBS Strategic Plan reflects your priorities for the next five years? 21 Responses: » 13—No » 5—Y » 3 — Somewhat Comments: » Doesn't include access to nature » Doesn't include commercial fishing industry — shipyard » Want more separation from U.S. Forest Service » No mention of active transportation (walking and biking) » No mention of trails, parks, or recreation, access to nature » No boat haul -out » No sure it is feasible for Sikta to limit # tourists » Get buses off road » Make arts a priority » Keep quality of schools » Substance abuse/domestic violence » It does not require robust financial analysis, quantitative analysis, and marketing research to support key resource allocation decisions. » Does not include aging school infrastructure or plans for replacement » Concern that succession planning will never happen What would you add, remove, or change? » Tourism » Financial transparency and stewardship with infrastructure, utilities » Access to nature/trails, cabins, etc. Comments: » Work with other agencies to support trail and cabin system (Sitka Trail Works) » Wants transparency on enterprise fund and electrical infrastructure upgrades » More time for public comment — difficult for commercial fishing industry to weigh in » Work with other agencies to develop an off-road trail system » Work with legal team to remove fees the U.S Forest Service charges the community of Sitka » I would like to see more attention given to » size and shape of tourism and the benefits vs. the impact on quality of life for residents » tax structure for seasonal residents, especially as it relates to income producing operations and property ownership » sustainability and support of our substantial fishing industry, which also strongly supports our quality of life » Look at financial models for utility master plans » Under the infrastructure topic we need to closely evaluate the assumptions that engineering planners use to develop our utility Master Plans to ensure we are not inflating future costs unnecessarily. » Second, we need to closely evaluate the financial models used by Finance to make sure we are not duplicating and thus compounding inflation factors that may already be embedded in the utility Master Plans. » The community should consider a local annual dividend payment for residents, so we feel we are sharing in the financial windfall from the cruise income. » I would add improvements for walkers and bikers. Young and many older people cannot drive. » If CBS is to support the essential service of walking and biking facilities, CBS staff need to actively collaborate with other public land management agencies and stakeholders to maintain and develop shared infrastructure. Sitka Trail Works recommends an action, under Goal 1 or Goal 4, that encourages improved planning and coordination. 4.4 Collaborate with public land management agencies and stakeholders to maintain and develop sustainable active transportation infrastructure, including parks, fields, cabins, trails, and water access. » As the only non-profit dedicated solely to improving Sitka's outdoor recreation infrastructure, Sitka Trail Works is currently leading a multi -jurisdictional trail planning process. Our public engagement process has reached over 800 Sitkans, including 787 who responded to the 2022 Trail Plan Survey, 94% of whom reported using the trails at least several times a year. » Eliminate the"sustainability"effort. This is simply virtue signaling and a waste of time, effort, and money. Simply focus on delivering services as cheaply and efficiently as possible. Get out of the way of private industry and let market forces take care of affordability and availability. » One area I do applaud this effort is the area of tourism and quality of life. I am suspicious that the effort will be not focused on quality of life, but on the almighty tourist dollar at the expense of quality of life. This past summer the unrestricted onslaught of cruise ship passengers definitely lowered the quality of life for residents. There has to be a balance and a serious discussion about this. Independent travelers had no chance to go visit the many sites around Sitka because of the crush of humanity. 29 Page 79 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. Residents couldn't enjoy them either. The number of ships needs to be restricted with a few days a week with none so residents and independent travelers have opportunities. If part of this effort is to help local businesses why not focus on businesses that stay open all year and not shut down when the tourist season is over. n Fewer visitors • 1.3 Identify opportunities to relieve the burden of utility costs Explore utility bill credit program for sustainability measures taken on Property —this sounds like it would only benefit property owners. What about renters? People who rent have no control over the sustainability measures that a building owner might take. How can utility costs be made more manageable for renters? • I personally was less invested in the communication and the City employee development aspects. • There is focus on affordable housing and utilities. However, there are parts talking about income tax, reduction of sales tax exemptions, etc. sustainability includes taxes. Saving money from utilities to only increase taxes is a fools errand. The city needs to leverage new revenue streams not from residents. Invest that into the community and stop increasing taxes. There is a breaking point. Also, limiting tourism due to a minority of the population is foolish. Sitka's growing tourism industry is the only growing economic industry, other than government. Don't stop this growth, as this is the future of our economy. • Add: let residents be financially secure and use their homes the way they want, short term rentals. • Engage with former employees to learn from their experiences, pass on institutional knowledge, etc. • Set up system to tie strategic plan and budget so as to not inadvertently fund anything that is not in the strategic plan • Healthcare services + costs • Staff communication with the public+ customer service • Prioritize cultural equity [Cie] Page 80 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.b. �9tihe Future To 3` 9 CD `o �o \\Sitka, Alaska// Sitl�a City and Borough of Sitka 100 Lincoln Street Sitka, AK 99835 _ www.cityofsitka.com 907.747.1800 her z, Page 81 of 109 Discuss Approach To Holding A Strategic Planning Meeting AGENDA ITEM #2.c. KODIAK ISLAND BOROUGH STAFF REPORT DECEMBER 14, 2023 4 ' x ASSEMBLY WORK SESSION SUBJECT: Discuss Qualifications Required By Code To Serve On Boards And Committees ORIGINATOR: Nova M. Javier, MMC, Borough Clerk RECOMMENDATION: Discuss whether to change the code. DISCUSSION: Mayor Arndt requested this discussion item. One of the requirements of the code is becoming a registered voter to serve on the different boards and committees. He would like to discuss with the Assembly members if they would consider a code change to allow those who are not American Citizens to serve on the board. ALTERNATIVES: FISCAL IMPACT: OTHER INFORMATION: KIBC 2.100.040 Qualifications. In addition to any other qualifications required by this code, a member: A. Shall be a qualified voter of the borough; and B. Shall remain a resident of the borough while in office. Kodiak Island Borough Page 82 of 109 Discuss Qualifications Required By Code To Serve On Boards And Committee... AGENDA ITEM #2.d. KODIAK ISLAND BOROUGH STAFF REPORT DECEMBER 14, 2023 4 ' x ASSEMBLY WORK SESSION SUBJECT: Discussion Of Changing The Transient And All -Inclusive Package Accommodations Tax From Five Percent To Twelve Percent ORIGINATOR: Bo Whiteside, Assembly Member RECOMMENDATION: This item was requested by Assembly member Whiteside and co-sponsored by Assembly member Sharratt. At the October 1, 1996, Municipal Election, Initiative Question No. 1 asked the voters the following question: "Shall the Kodiak Island Borough levy and collect a tax not to exceed five percent (5%) of the amount charged persons for using transient accommodations within the Kodiak Island Borough?" This initiative passed with 1054 Yes votes and 956 No votes. As a result of this initiative, Ordinance No. 96-19 was adopted by the Assembly on December 5, 1996, which laid out the implementation and administration of the transient accommodations tax. AS 29.45.670 requires a public vote ratifying an ordinance which imposes a new sales and use tax or raises the rate of levy of a sales and use tax. The KIB transient occupancy tax is labelled as a sales tax under KIB 3.55.010. Under the 1996 vote the Borough can vary the rate between 0% and 5% without a vote, but if the Borough wants to exceed 5% a public vote ratifying the increase will be required. DISCUSSION: ALTERNATIVES: FISCAL IMPACT: OTHER INFORMATION: Kodiak Island Borough Discussion Of Changing The Transient And All -Inclusive Package Accommoda... Page 83 of 109 AGENDA ITEM #2.d. KODIAK ISLAND BOROUGH ORDINANCE NO. FY2024-NN AN ORDINANCE OF THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH AMENDING TITLE 3 REVENUE AND FINANCE, CHAPTER 3.55 TRANSIENT ACCOMMODATIONS TAX, SECTION 3.55.010 LEVY OF SALES TAX AND SECTION 3.55.090 ADDITION OF TAX TO INCREASE THE SALES TAX PERCENTAGE FROM FIVE PERCENT TO 12 PERCENT FOR TRANSIENT AND ALL-INCLUSIVE PACKAGE ACCOMODATIONS WHEREAS, this amendment would align the Kodiak Island Borough with the City of Kodiak tax rate applied to transient accommodations and all-inclusive package accommodations. NOW, THEREFORE, BE IT ORDAINED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH that: Section 1: This ordinance is of a general and permanent nature and shall become a part of the Kodiak Island Borough Code of Ordinances. Section 2: That Section 3.55.010 Levy of Sales Tax of the Kodiak Island Borough Code of Ordinances is amended to read as follows: 3.55.010 Levy of sales tax. A sales tax of five twelve percent of the rental charge is levied on all transient rentals for accommodations within the Kodiak Island Borough. For all-inclusive packages, a sales tax of five twelve percent will be levied on the amount of the package that is for accommodations; this amount will be substantiated in writing to the borough for approval. If a business does not have an approved substantiated rate, then the five twelve percent will be levied on 50 percent of the average daily rate of the package for each day of the stay. Any business may appeal the decision of the finance director regarding the levy of this tax pursuant to KIBC 3.55.180(D). Section 2: That Section 3.55.090 Addition of Tax of the Kodiak Island Borough Code of Ordinances is amended to read as follows: 3.55.090 Addition of tax. A. The tax collector shall add the tax imposed by this chapter to the rental charge, showing the tax as a separate and distinct item. The tax imposed on more than one separate rental may be shown as a total tax on the aggregate price of all rentals made at one time. B. The tax to be collected and remitted may be determined by multiplying the gross receipts from the services or product by X5.12. In cases of all-inclusive packages, the tax may be determined by multiplying the approved substantiated rate for accommodations by x.12. If a rate has not been approved, then the five twelve percent will be levied on 50 percent of Ordinance No. FY2024-NN Page 1 of 2 Page 84 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. the average daily rate of the package multiplied by the number of nights of accommodations provided. Effective Date: This ordinance takes effect upon adoption. ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH THIS DAY OF , 2024 KODIAK ISLAND BOROUGH ATTEST: Scott Arndt, Borough Mayor Nova M. Javier, MMC, Borough Clerk Introduced by: Assembly member Whiteside and Sharratt First reading: Second reading/public hearing: VOTES: Ayes: Noes: Ordinance No. FY2024-NN Page 2 of 2 Page 85 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. Kodiak Island Borough Assembly Agenda Item Request Form PLEASE FILL OUT AND RETURN TO THE CLERK Below Are The Adopted Powers Of The Kodiak Island Borough. Circle the adopted power your request falls under. Mandatory Powers of the Assembly: • Solid Waste Collection and Disposal (non-areawide/on • Education road system) • General Administration and Finance • Parks and Recreation (non-areawide/outside cities) • Tax Assessment and Collection • Economic Development (non-areawide/outside cities) • Planning and Zoning • Animal Control (non-areawide/outside cities) • Fire Protection and First Responder Emergency • Adopted Powers of the Assembly: Medical Services (service areas) • Emergency Services Planning • Road Maintenance and Construction (service areas) • Community Health (restricted • Street Lighting (service areas) areawide) Assembly Member: Bo Whiteside, Ryan Sharratt. Date Submitted: 11/9/23 Agenda Date Requested: 12/14/23 Meeting Type: (F)NS ORM It is recommended that you turn in request at least a month prior to the meeting date requested. The Mayor retains discretion when to place items on the agenda per KIBC 2.60.0608. Description of the item you are requesting to have placed on the agenda. Please submit one form for each item and submit any applicable documents with this form. Introduction of ordinace to amend KIBC 3.55.010 and 3.55.090. Requested action of the Assembly: Discuss and vote to reject or adopt. For Staff Use: Received date: Distributed to: Mayor DPO Manager Discussed at the agenda setting on: Approved and scheduled on: WS Date: RM Date: Notes: \\dove\borough\CL\BC-05 - ASSEMBLY AGENDA PACKETS\Assembly and Public Agenda Request Forms\Assembly Agenda Item Request Form Rev.docx Page 86 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. Introduced by: Mayor Selby Requested by: Borough Clerk Drafted by: Borough Attorney Introduced: 11/26/96 Public Hearing: 12/05/96 Amended: 12/05/96 Adopted: 12/05/96 KODIAK ISLAND BOROUGH ORDINANCE NO. 96-19 AN ORDINANCE ADDING CHAPTER 3.30 TRANSIENTACCOMMODATION TAX TO THE KODIAK ISLAND BOROUGH CODE OF ORDINANCES TO IMPLEMENT AND ADMINISTER A TRANSIENT ACCOMMODATIONS TAX WHEREAS, the Board of Directors of the Kodiak Island Convention and Visitors Bureau submitted an initiative petition to place the question of levying and collecting a tax not to exceed five percent (5%) of the amount charged persons for using transient accommodations on the October 1, 1996 election ballot; and WHEREAS, the petition has been duly certified by the Borough Clerk and approved by a majority of the qualified voters in the Kodiak Island Borough eligible to vote on the question; NOW, THEREFORE, BE IT ORDAINED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH THAT: Section 1: This ordinance is a general and permanent nature and shall become a part of the Kodiak Island Borough Code of Ordinances. Section 2: This ordinance shall take effect on the first day of January, 1997. Section 3: Title 3 of the Kodiak Island Borough Code of Ordinances is amended by adopting a new chapter 3.30 as follows: CHAPTER 3.30 Transient Accommodations Tax 3.30.010 Levy of sales tax. A sales tax of five percent (5%) of the rental charge is levied on all transient rentals for accommodations within the Kodiak Island Borough. 3.30.020 Accrual and collection. Sales taxes imposed by this chapter are due and payable by the buyer at the time of payment for the rental and are delinquent if not paid when due. Every person making rentals that are taxable under this chapter shall collect the taxes from the purchaser at the time of the rental or, with respect to credit transactions, at the time of collection of the rental fee and shall transmit the money collected on a quarterly basis to the borough. Kodiak Island Borough, Alaska Ordinance No. 96-19 Page 1 of 13 Page 87 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. 3.30.025 Allocation of sales tax proceeds. A. The sales taxes collected under section 3.30.010 shall be allocated to a separate fund or account to be appropriated and utilized solely for increased development of the tourist industry, and may be allocated for tourism programs, tourism enhancement projects, such as beautification within the borough, and the administrative costs associated with such programs; B. The sales tax collected in any of the six (6) villages may be appropriated for the purpose of the development of the tourist industry in the village. 3.30.030 Installment payments. When the payments for a rental are made on an installment basis, the entire sales tax shall be collected from the down payment, or, if a down payment is not made or is insufficient to pay the tax, then from the entire first installment payment or payments until the tax is paid. 3.30.040 General exemptions. A. The following classes of rentals are exempt from the tax imposed by this chapter: 1. Rentals to religious and charitable organizations as defined in subsections 501 (c)(1), (3), and (4) of the Internal Revenue Code, for the conduct of regular religious or charitable functions and activities, and not for the support or maintenance of the general membership or for communal living; 2. Rentals to the United States, the State of Alaska, and any agencies or political subdivisions thereof; 3. Rentals which the borough is prohibited from taxing by the constitution or laws of the United States or the state of Alaska; 4. Rentals by businesses which provide sleeping accommodations as an incidental part of their business but do not provide transient accommodations separately as a business; i.e., fishing boat charters, guide operations not based in a lodge that also sells lodging, and similar services; 5. Rentals to nonprofit organizations operated primarily for the purpose of planning, promoting, and conducting organized group activities for participants who are eighteen (18) years of age or less; and 6. Rentals for accommodations located within a municipality which levies and collects a sales tax on transient room rentals. No certificate is required for the exemption provided by this subsection. 3.30.045 Partial exemption. A business that provides transient accommodations separately in the normal course of business, shall collect the tax on the estimated value of the rentals included in any package sales which include other services such as guiding or transportation. 3.30.055 Senior citizens exemption. A. A person sixty-five (65) years of age or older who has resided in the Kodiak Island Borough for a continuous period of thirty (30) days or more may obtain a senior citizens sales tax exemption certificate by submitting a completed application to the finance director on a form provided by the borough. The application must be signed Kodiak Island Borough, Alaska Ordinance No. 96-19 Page 2 of 13 Page 88 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. by the applicant under oath and shall contain information relating to the applicant's residence, marital status, rental or ownership of occupied dwelling, persons occupying the dwelling, and other information reasonably necessary to determine the applicant's eligibility and monitor the use of the exemption certificate. The applicant shall also submit for inspection and copying a birth certificate, or other evidence determined by the finance director to be adequate, to establish the applicant's age. The exemption certificate shall be issued without charge in the name of the applicant and shall be valid for a period of three (3) years. B. An exemption certificate issued to a person who is prevented or impaired from personally making purchases or payments by a physical or mental infirmity may designate not more than two (2) other persons who shall be authorized to utilize the certificate when making purchases and payments on behalf of and for the sole use and benefit of the certificate holder or the certificate holder's spouse. C. No person may utilize a senior citizen tax exemption certificate to purchase or acquire rentals that are to be utilized by a person or persons other than the certificate holder, the certificate holder's spouse, a dependent of the certificate holder, or another person or persons who would be qualified to have a senior citizens exemption certificate issued to them under this section. As used in this section, "dependent" means a child of the certificate holder or the certificate holder's spouse who resides with the certificate holder when not attending school and who receives more than one-half (%) of his or her support from the certificate holder. 1. Notwithstanding any other provisions of this chapter no person may utilize a senior citizen tax exemption certificate to rent a room which will be used in a commercial business or enterprise or for the production of income. 2. Persons making rentals to or for the benefit of a senior citizen which are exempt from tax under the provisions of this section shall confirm the identity of the person or persons presenting an exemption certificate, if not personally known to them, by requesting identification and shall maintain records of each such exempt rental with an appropriate reference to the senior citizen exemption certificate number. If the person making the rental has reason to believe that it is not for use by a senior citizen or other qualified user, because of the volume, type of purchase, or other facts, that person shall promptly report the possible fraudulent use of the exemption certificate to the borough finance director. The finance director shall investigate the rental, and if the finance director determines that the exemption certificate is being abused, the matter shall be referred to the mayor who shall conduct such further investigation as is determined necessary and present the facts to the assembly for authorization to initiate prosecution or revocation action, or both. 3. Senior citizens' exemption certificates shall be subject to revocation as provided in section 3.30.070 of this chapter. 3.30.060 Certificate of exemption. A. A person entitled to the exemption under section 3.30.040 shall apply to the borough for a certificate of tax exemption which will be issued without charge to qualified persons. The application shall be submitted on a form provided by the borough finance office and shall contain the name, address, type of organization, the section under which the exemption is claimed, and such other information as is Kodiak Island Borough, Alaska Ordinance No. 96-19 Page 3 of 13 Page 89 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. required by the finance department. Duplicate certificates will be issued on request. B. The certificates of exemption shall be valid for a period of one (1) year and the expiration date shall be printed on the face of the certificate. Exemption certificates may be renewed annually, without charge, by completing an application form containing information required to assess the continued existence of the exemption. 3.30.070 Revocation of certificate of exemption. A. A certificate of tax exemption may be revoked by the mayor for any of the following acts or omissions: 1. Falsification of any statement or information in the application for certificate of exemption; 2. Utilization of the tax-exempt certificate for the purchase or acquisition of nonexempt rentals; 3. Knowingly or negligently permitting or authorizing the use of the certificate by a person other than an authorized agent or employee of the person or entity to whom the certificate was issued. B. Prior to revocation of a certificate, the holder of the certificate shall be provided with notice of the alleged violation not less than ten (10) days prior to the proposed effective date for revocation of the exemption certificate. The person or entity to whom the certificate was issued may request a hearing before the mayor regarding the alleged violation by filing a written request with the mayor prior to the effective date for revocation. If requested, the hearing shall be held within twenty (20) days after the date of receipt of the request, and the exemption certificate shall not be revoked prior to the date of hearing. C. A decision of the mayor revoking an exemption certificate may be appealed to the assembly by filing a written notice of appeal with the borough clerk within ten (10) days after receipt of the decision. The hearing on the appeal shall be scheduled before the assembly at a regular or special meeting held within thirty (30) days after receipt of the notice of appeal. The assembly may, in its discretion, hear the matter either on the record or de novo. If the appeal is heard de novo, no evidence may be presented before the assembly which was not presented before the mayor. D. If an exemption certificate is revoked, a new certificate may not be issued to the same person or entity for a period of two (2) years from the date of revocation. E. The revocation provided by this section is in addition to any other penalties provided by law for the violations. 3.30.080 Tax collectors registration certificate. A. All persons engaged in selling or renting property subject to the tax imposed by this chapter shall file an application for a certificate of registration not later than the date of commencing business in the borough or opening a place of business within the borough. An application for a new business not previously registered to collect sales taxes shall be accompanied by a one hundred dollar ($100) deposit, or, in the case of a person who does not maintain a permanent place of business within the borough or who is not a local resident residing within the Kodiak Island Borough, a two hundred dollar ($200) deposit which the registrant may recover by a deduction from the remittance submitted with the first quarterly return filed or, if that return is Kodiak Island Borough, Alaska Ordinance No. 96-19 Page 4 of 13 Page 90 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. insufficient, the balance shall be refunded. If applicant has established credit with the borough, the finance director may waive the required deposit. B. Upon receipt of a properly executed application, on a form provided by the finance director, accompanied by the required deposit, the finance director shall issue the applicant a certificate of registration, stating the address of the place of business to which it is applicable and authorizing such person to collect the sales tax. The certificate shall be prominently displayed at the place of business named on the certificate. C. The certificate of registration is nonassignable and nontransferable, and must be surrendered to the finance director by the person or entity to whom it is issued upon cessation of business at the location named in the certificate. If the business is continued at the same location but there is a change in its business form, the certificate holder making such change shall surrender the old certificate to the finance director for cancellation and the successor organization shall apply for a new certificate of registration. Upon receipt of such application properly executed, a new certificate bearing a new number will be issued to such successor. D. When there is a change of address for the certificate holder's place of business, a new certificate of registration is required, bearing the same registration number, showing the new address. E. An applicant for a new certificate required to reflect a change in business form or a change of address for an existing certificate holder is not required to post a deposit with the application. 3.30.082 Failure to obtain registration certificate. A. It shall be unlawful for any person to engage in, or continue in, business within the borough or to conduct activities within the borough unless and until such person obtains a certificate of registration. In the event the finance director ascertains that any such person is engaging in, or continuing in, business within the borough without a certificate of registration, one (1) or more of the following remedies may be sought: 1. Conduct a special audit of such person's records and make a demand upon such person to obtain a sales tax certificate, in which case such person who has engaged in business or activities within the borough without a certificate shall pay a special fee to reimburse the borough for the expense of the audit, which fee shall be the lesser of the sum of one thousand dollars ($1,000) or ten percent (10%) of any tax found to be due. However, the fee may be waived at the discretion of the finance director for good cause shown. The finance director shall also assess any delinquencies, and applicable penalties and interest, if any, against such person, if such person engaged in rentals which were or are subject to the borough sales tax. 2. Report the facts to the borough attorney for appropriate action. 3.30.090 Addition of tax. A. The tax collector shall add the tax imposed by this chapter to the rental charge, showing the tax as a separate and distinct item. The tax imposed on more than one (1) separate rental may be shown as a total tax on the aggregate price of all rentals made at one time. Kodiak Island Borough, Alaska Ordinance No. 96-19 Page 5 of 13 Page 91 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. B. The tax to be collected and remitted may be determined by multiplying the gross receipts from the services or product by .05 and dividing that product by 1.05. 3.30.100 Assumption of tax prohibited. No person may advertise or state to the public, or to any tenant directly or indirectly, that the tax imposed by this chapter or any part thereof will be assumed or absorbed by that person, or that it will not be added to the charge, or that it will be refunded; nor may any person assume, absorb, or fail to separately state the tax to the tenant unless otherwise specifically authorized by this chapter. 3.30.110 Tax schedule. The amount of the tax to be added to the rental charge for transient room rentals shall be determined in accordance with the following schedule: Charge Tax Under 5 cents None $.05 through $.17 $.01 .18 through .30 .02 .31 through .50 .03 .51 through .89 .04 .90 through 1.09 .05 Over $1.10 Continue on same scale 3.30.120 Maximum taxable sale. A. If the charge for rental of any property exceeds five hundred dollars ($500) for a single transaction, that portion of the price or charge in excess of five hundred dollars ($500) shall be exempt from the tax levied by this chapter. B. In determining the maximum tax payable with regard to a single transaction for rentals, each day shall be deemed a separate service transaction. The maximum tax payable shall be applicable to each deemed service transaction with tax payments to accrue and become payable at the time of filing the next quarterly return to be submitted following receipt of payment for the service. 3.30.130 Title to tax proceeds. The title to the taxes collected pursuant to this chapter shall vest in the borough upon collection by the tax collector. 3.30.140 Sales tax returns. A. Each person who rents property taxable under this chapter in any quarter ending March 31, June 30, September 30, and December 31 shall, on or before the last day of the month following the end of each quarter year, or April 30, July 31, October 31, and January 31 respectively, complete, sign, and file with the borough a return for that quarter, upon forms furnished by the borough, setting forth the following: 1. The amount received from all rentals made within the borough; 2. The amount received from nontaxable rentals, with a brief explanation of the nontaxable status; 3. The amount received from taxable rentals; 4. The amount of tax attributable to the taxable rentals; Kodiak Island Borough, Alaska Ordinance No. 96-19 Page 6 of 13 Page 92 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. 5. The taxes collected; and 6. Such other information and supporting papers as the finance director may require in the reporting form. B. The taxes collected shall be remitted with the reporting form after deducting any administrative fees that may be allowed by section 3.30.160. C. If the last day of the month is a Saturday, Sunday, or legal holiday, tax returns and remittances shall be considered filed on time if delivered or postmarked on or before the last day of that month. D. A person making rentals within the borough shall make a return, even though none of the reported transactions are taxable. E. A person who fails to timely comply with the provisions of this chapter relating to the filing of quarterly reports and remittance of taxes collected for any one (1) quarter during a calendar year shall, if required by written notice from the finance director, file the required reports and transmit collected sales taxes monthly until such time as the finance director determines that a willingness and ability to comply with the requirements of this chapter has been established. Monthly reports and remittances shall be due on the fifteenth (15th) day of each month following the month of collection. Any person may, upon notification to the finance director, file reports and transmit taxes monthly. F. A person doing business within the borough for a period of time that is expected to be, less than six (6) months in duration shall file sales tax returns and remit taxes on a monthly basis as provided in subsection E of this section. G. A final sales tax return shall be filed and the tax due remitted within fifteen (15) days after the date of selling or terminating a business. The purchaser of the business shall withhold a portion of the purchase money sufficient to pay any sales tax, penalties, and interest that may be due until seller displays a receipt from the borough evidencing total payment of the tax, interest, and penalties due. If the purchaser fails to withhold the required sum from the payment due to the seller, the purchaser shall also be liable for the taxes, penalties, and interest owed by the seller to the borough. 3.30.150 Credit for taxes. A person who has collected and remitted a tax on a borough rental, which tax is subsequently determined not to be due because a refund is granted for cancellation, payment is refused on a check received in conjunction with a rental, or similar circumstances, may take a credit against future taxes. Proper documentation shall be made available by the tax collector, on request, to substantiate the credit taken. 3.30.160 Administrative costs and reimbursements. To compensate renters for keeping the sales tax records and filing returns as required by this chapter and making prompt remittances, those persons shall be entitled to a fee equal to two percent (2%) of the amount of the tax collected, and that amount may be deducted when making remittances; provided that the reports and remittances are postmarked on or before the due date for such reports and remittances. A person filing a report or remitting taxes collected after the due date forfeits the right and claim to the fee provided by this section and shall remit the entire tax due. Kodiak Island Borough, Alaska Ordinance No. 96-19 Page 7 of 13 Page 93 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. 3.30.170 Penalty and interest. A. A person who fails to remit taxes collected on or before the due date shall pay, in addition to the tax due, a penalty of five percent (5%) of the tax that is then due and unpaid for each month or any fraction of a month during which any part of the tax remains unpaid until a total penalty of twenty percent (20%) has accrued, which penalty shall be added to all returns until the tax, penalty, and interest have been paid. For the purposes of this section, partial payments shall be credited first to penalty and interest and then to the tax obligation originally due. B. Taxes that are not remitted to the borough when due shall draw interest from the date of delinquency until paid at the rate of fifteen percent (15%) per year. Interest shall not accrue on the late payment penalty assessed by subsection A of this section, but shall accrue on the civil penalty assessed by section 3.30.190. 3.30.180 Determination of exemptions. A. Every rental made within the borough, unless explicitly exempted by ordinance, is presumed to be subject to the tax imposed by this chapter. B. A tenant who claims an exemption under a provision of this chapter for which a certificate of exemption is required shall display the certificate at the time of the rental and the certificate number shall be noted on the receipt, invoice, or other evidence of the transaction. C. A tenant who believes the tax has been charged in error may make a claim to the borough for refund within thirty (30) days after the date of the rental. D. If the finance director denies a refund of the tax, the taxpayer may appeal to the mayor by filing a written notice of appeal, within ten (10) days after the finance director's decision, setting forth all facts relating to the claimed exemption. The mayor shall provide an opportunity for a hearing within thirty (30) days after the receipt of the notice of appeal. 3.30.190 Failure to collect taxes. A. A person required by this chapter to collect sales taxes levied, who fails to collect such taxes on taxable transactions, shall be assessed with a civil penalty of double the tax that should have been collected, as determined by an audit. B. If any of the following defenses are established, the civil penalty imposed by this section shall be waived: 1 . The securing, in good faith, of a certificate of exemption or a statement of eligibility for exemption from the person against whom the tax would have been levied; 2. Proof of a belief, based upon advice of legal counsel or the borough finance director, that the rental was not subject to the tax levied by this chapter, accompanied by proof of notification in writing to the mayor based on such belief prior to or immediately following the transaction; 3. A reasonable attempt, in good faith, to collect the tax from the buyer. C. A renter who fails to pay the tax levied by this chapter on a taxable transaction shall be assessed with a civil penalty of double the taxes that should have been paid. D. The civil penalties imposed by this section shall be in addition to any other civil or criminal penalties imposed by this chapter. Kodiak Island Borough, Alaska Ordinance No. 96-19 Page 8 of 13 Page 94 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. 3.30.200 Preservation of records collection of arrears tax. A. Every person required by this chapter to collect and remit taxes shall keep and preserve suitable records of the rentals, together with invoices, bills of sale and other pertinent records and documents which may be necessary to determine the amount of the tax due under this chapter and to substantiate the information provided in filed returns. The records required to be maintained shall be preserved for not less than three (3) years after the remittance of the taxes and shall be subject to examination by the borough finance director or any other authorized employee of the borough while engaged in reviewing or auditing the records of any taxpayer required to make a return under the provisions of this chapter. The borough shall give written notice of intent to conduct an audit under this section not less than five (5) days prior to the audit. B. Collection of arrears tax by the borough shall be limited to the period of three (3) years prior to the date when the finance director or authorized agent began an audit of the taxpayer's records, wrote to the person through use of regular mail concerning an apparent violation of this chapter, or took some other recorded action to require a certificate of registration or other compliance with this chapter. 3.30.210 Estimated tax. If the borough is unable to ascertain the correct tax to be paid by a seller because of the failure or refusal of the seller to file a return, keep accurate records, or allow their inspection, or because a return has been falsified, the borough may prepare an estimate of the tax due based on any information that may be available. Notice of the estimated tax shall be provided to the seller and shall become final for the purpose of establishing the tax liability unless the seller, within thirty (30) days after receipt of notice of the estimated tax, files an accurate return supported by records determined by the finance director to be satisfactory, establishing a lesser liability. 3.30.220 Returns confidential. Except in connection with official investigations or proceedings of the borough, whether judicial or administrative, involving taxes due under this chapter, no officer, employee, or agent of the borough may divulge any information disclosed in a report or return filed under this chapter. The prohibition of this section shall not prohibit the preparation and use of statistical summaries of sales tax data that do not disclose the identity of any person filing reports required by this chapter. 3.30.222 Corrections of errors on tax returns. If the taxpayer makes an error or errors in computing the tax on a return, the finance director or authorized agent, shall correct such error or errors and immediately notify the person filing the return by ordinary mail that such correction has been made. Any additional tax due, together with applicable penalty and interest in accordance with section 3.30.170, for which the taxpayer becomes liable shall be payable immediately by the taxpayer. If the taxpayer makes an error which results in overpayment of tax, the finance director shall allow credit against taxes due on future returns, or shall authorize a refund in accordance with section 3.30.224. 3.30.224 Refund of overpayment. The finance director, or authorized agent, shall refund overpayment of taxes brought about by mathematical errors in the return or reports filed by the person remitting the tax; computational errors made by the remitter or borough Kodiak Island Borough, Alaska Ordinance No. 96-19 Page 9 of 13 Page 95 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. personnel with respect to said return or reports; duplicate payments by remitter; or any overpayment made by a person filing a tax return that may be determined as a result of an audit of such person's records; provided, however, that in no event shall the remitter of sales taxes be entitled to a refund for overpayment of sales taxes where the overpaid taxes have actually been collected by said person. In the event the amount of overpayment is one hundred dollars ($100) or less, a cash refund may be authorized at the discretion of the finance director. In no event shall there be a refund for overpayment that were made more than three (3) years prior to the discovery of the overpayment by the person filing the returns or the finance director or authorized agent. 3.30.226 Protest of Tax. A. A buyer who protests the payment of the tax levied under this chapter shall pay the tax and shall provide the seller and the finance director with a written statement of protest within five (5) working days of the sale that identifies the sale, rental or service that is the subject of the tax protested, the amount of tax paid, the buyer's and seller's name, mailing address, telephone number and the basis for the protest. B. If the seller protests his liability on an assessment under section 3.30.210 which has become final, he shall pay the tax under written protest setting forth the basis for the protest. No action for a refund may be maintained nor may a defense to nonpayment be maintained in a civil action unless the amount in dispute has been paid by the seller under written protest filed at or before the time of payment. 3.30.230 Recovery of taxes. Taxes due but not paid may be recovered by the borough in an action against the tenant if that person has failed or refused to pay the tax on request by the seller or submitted a false certificate of exemption. Taxes collected but not transmitted and taxes not requested or demanded by the person charged with the duty of collecting of tax may be recovered by an action against the person renting the property. 3.30.240 Lien for tax, interest, and penalty. A. The tax, interest, and penalty imposed under this chapter and the lien filing fee under subsection B of this section shall constitute a lien in favor of the borough upon all real and personal property of every person required to collect and remit the tax. The lien arises at the time of delinquency and continues until liability for the tax is satisfied or the property of the delinquent person is sold at foreclosure sales. The lien has priority over all other liens and encumbrances except those for property taxes and special assess- ments; provided, however, that the lien is not valid as against a person in the position of a prior mortgagee, pledgee, or judgment creditor until notice of the lien is filed in the office of the recorder for the Kodiak Recording District in the manner provided for federal tax liens in AS 43.10.090 through 43.10.150 and the lien is not valid against a purchaser who, prior to the recording of it, in good faith and without actual notice of the lien or the underlying tax liability, has acquired for fair market value an interest in property otherwise subject to the lien. Upon recordation a copy of the lien shall be sent to the last known address of every person named in the lien. Failure to comply with this requirement shall not, however, affect the validity of the lien or the borough's right or authority to foreclose upon it. Kodiak Island Borough, Alaska Ordinance No. 96-19 Paye 10 of 13 Page 96 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. B. Fees for the filing and releasing of liens authorized by this section shall be established by resolution of the assembly. 3.30.250 Foreclosure against real property. A lien for the tax, interest, and penalties created by this chapter may be foreclosed, when authorized by the assembly, by commencement of an action in the superior court pursuant to the procedure set forth in AS 09.45.170 220. 3.30.260 Collection by distraint and sale. A. The borough may collect taxes, with interest, penalties, and other additional amounts permitted by law, by distraint and sale of the property of the person liable to pay the taxes, interest, penalty or other additional amount, who neglects or refuses to pay them within ten (10) days after receipt of notice and demand for payment. B. In case of neglect or refusal to pay taxes or deficiencies as provided in this section, the finance director may obtain a warrant authorizing the finance director to levy upon, seize, and sell any property, except exempt property, belonging to the person for the payment of the amount due, with interest and penalty. When distraint is made as provided in this section, the finance director shall make an inventory of the property served and leave a signed copy of that inventory with the owner or possessor of the property, or at the dwelling or usual place of business, if a person of suitable age and discretion can be found, or if the taxpayer is a corporation or other type of organization with an officer, manager, general agent, or agent for process, with a notation of the amount demanded and the time and place of sale. C. The finance director shall immediately publish a notice of the time and place of sale at public auction, together with a description of the property distrained, in a newspaper published in the borough and post a copy of the notice at the post office nearest the place where the sale is to be made. D. The time of sale shall be not less than fifteen (15) or more than sixty (60) days from the date of the notification to the owner or possessor of the property, and the place proposed for the sale shall not be more than five (5) miles from the place of making the distraint. The sale may be continued from time to time in the discretion of the finance director, but not for more than thirty (30) days after the date specified in the notice. E. The property distrained shall be restored to the owner or possessor if, before the sale, payment of the amount due is made to the finance director charged with the collection, together with the fees and other charges. F, The finance director shall give to the purchaser a certificate of sale on payment in full of the purchase price. The certificate of sale: 1. Is prima facie evidence of the right of the finance director to make the sale, and conclusive evidence of the regularity of the proceedings in making the sale; 2. Transfers to the purchaser all right, title, and interest of the delinquent taxpayer in and to the property sold; 3. Where the property consists of stock, is notice, when received, to the corporation to record the transfer on their books and records in the same manner as if the stock were transferred or assigned by the party holding the stock in lieu of an original or prior certificate, which is void, whether cancelled or not; and Kodiak Island Borough, Alaska Discussion Of Changing The Transient And All -Inclusive Package Accommoda... Ordinan cc No. 96-19 Page 11 of 13 Page 97 of 109 AGENDA ITEM #2.d. 4. Where the subject of the sale is security or other evidence of debt, is a good and valid receipt to the person holding it, as against a person holding or claiming to hold possession of the security or other evidence of debt. G. If property seized and sold is not sufficient to satisfy the claim of the borough for which distraint or seizure is made, the finance director may, thereafter, and as often as is necessary, proceed to seize and sell in like manner any other property subject to the lien created by this chapter until the amount due from the taxpayer together with all expenses is fully paid. H. A person in possession or control of property subject to distraint, upon which a levy is made, shall, upon demand by the finance director making the levy, surrender the property to the finance director, unless the property is, at the time of the demand, subject to an attachment under judicial process. A person who fails or refuses to so surrender the property is personally liable to the borough for a sum equal to the value of the property not so surrendered, but not exceeding the amount of the taxes or deficiencies, including penalties and interest for the collection of which levy is made, together with costs and interest from the date of the levy. I. All persons shall, on demand of a police officer about to distrain or having distrained on property or rights of property, exhibit all books containing evidence or statements relating to the property liable to distrain for the tax due. J. The provisions of this chapter are not exclusive but are in addition to all other existing remedies provided by law for the divorcement of a levy and collection of taxes of the borough. 3.30.270 Prohibited acts. A. No person may: 1. Fail or refuse to file a completed tax return required by this chapter, upon demand or falsify any material statement in that return; 2. Fail or refuse to collect taxes levied by this chapter and remit those taxes to the borough as required; 3. Conduct any business in the borough relating to rentals subject to taxation under this chapter without first applying for and obtaining a certificate of registration to collect the taxes imposed on rentals; or 4. Falsify any portion of an application for a certificate of exemption. 3.30.280 Definitions. A. As used in this chapter the following definitions shall apply: 1. "Accommodations" mean a structure or portion of a structure which is occupied or intended for occupancy by transients for dwelling, lodging, or sleeping purposes. This term includes hotels, motels, tourist homes, houses or courts, lodges, lodging houses, inns, rooming -houses, youth hostels, trailers, bed and breakfasts, and dormitories. This term does not include any hospital, medical clinic or nursing home. 2. "Buyer" or "purchaser" means a person who acquires an interest in real or personal property, or the right to use real or personal property, or who acquires services for consideration. 3. "Charitable organization" means an organization having as its primary purpose relief of the poor and distressed or of the underprivileged. Kodiak Island Borough, Alask++ Ordin, nc,, No. 96-19 Faye 12 of 13 Page 98 of 109 Discussion Of Changing The Transient And All -Inclusive Package Accommoda... AGENDA ITEM #2.d. 4. "Rental" means permitting the use or occupancy of real or personal property for consideration other than by means of a capital lease. 5. "Residential unit" means one or more rooms and a single kitchen in a dwelling designed as a unit for occupancy by not more than one (1) family for living or sleeping purposes. 6. "Residential uses" means for use within a residential unit. 7. "Sale" means a transfer or exchange of any property of every kind and description, or the right to use or occupy such property, for consideration. 8. "Sales price" or "charge" means the consideration, whether money, credit, or other property or interest in property, without deduction for delivery costs, taxes, or any other expense. The receipt of property or an interest in property as consideration, the "sales price" or "charge" shall be based on the fair market value of the property or interest in property. 9. "Seller" means a person, whether acting as a principal, agent, or broker, who sells, leases, or rents real or personal property or provides services to another for consideration. 10. "Transient" means a person who occupies or rents and has available for the person's own occupancy or occupancy by any other person a suite, room or rooms in a hotel -motel for fewer than thirty (30) consecutive days. An employee who occupies or has available for fewer than thirty (30) days a suite, room or rooms rented c1r leased for more than thirty (30) consecutive days by an employer for use on a roti+ring basis ny employees is not a transient. ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH THIS FIFTH DAY OF DECEMBER, 1996 KODIAK ISLAND BOROUGH Jer e M. Selby, Borough Robin Heinrichs, Presiding Officer ATTEST: �Dorina F. Smith,CMC/AAE, Borough Clerk Kodiak Island Borough, Alask. Discussion Of Changing The Transient And All -Inclusive Package Accommoda... Ordin.n�a: No. 96-13 P"p. 13 of 13 Page 99 of 109 i AGENDA ITEM #4.a. Kodiak Island Borough OFFICE of the MANAGER TO: Kodiak Island Borough Assembly FROM: Aimee Williams RE: Managers Report, December 14, 2023 710 Mill Bay Road Kodiak, Alaska 99615 Phone (907) 486-9301 Manager's Department Federal Legislators — Received confirmation from Seb O'Kelly that our federal contingency of legislators all signed a letter to go to the Secretary of the Department of the Interior. In the letter attached, you will see that the group reinforces our opinion that leasing the mental health buildings for workforce housing should be deemed consistent with the public use restriction in the deed. Staffing changes — Since our last meeting, the Finance Department has lost two employees and currently has advertisements out for three jobs, Accounts Payable Technician, Payroll Technician, and General Accountant. The Assessing Department had an Appraiser Technician resign and is now advertising for that position. Community Development had Joe Grochmal start this week as the new Associate Planner. Alaska Municipal Managers Association (AMMA) and Alaska Municipal League — Traveled to Anchorage to attend these annual meetings. Learned about best practices from other communities, networked with professionals from across the state and country, and learned about what our state and federal legislators were planning for the next year. Additionally, I was elected to serve on the AMMA Board of Directors. City of Kodiak Lease — Agreement was reached with the City of Kodiak on the building lease today. The City Manager agreed to the lease and plans to sign. The new lease has a modest rent increase and a 357 square -foot space expansion by the City of Kodiak. Green Waste — KIB hired a contractor to assist with the burning of green waste today in the Dark Lake area. Residents of that area have been improperly dumping waste in that area outside of the dumpsters. Engineering & Facilities staff removed all of the non- organic waste and brought it to the landfill. Borough Manager's Report AGENDA ITEM #4.a. Alaska Marine Highway System — The summer schedule is open for public comment. If you are interested in more information, please call me and I will send you a link. Holiday Cheer — Many KIB employees are participating in a holiday door decorating contest. If you are in the building next week, please take a look around and see all of the festive decorations. There will be a Gingerbread House contest, a Holiday Cookie Contest, and a potluck taking place on December 22nd at 3:30PM. The Assembly is invited to help staff celebrate the holiday season. Engineering and Facilities Tree Blow Down — • December 5, 2023 - Staff has been involved after a high wind event in Bells Flats. Multiple trees were damaged and blown over on both Borough land, road right of way and private property. One structure was reported as damaged. KIB insurance is not a factor as the damage was determined to be an "Act of God". Solid Waste Advisory Board — • SWAB and Staff are collaborating with Boy Scout Troop 626 for the collection of natural Christmas trees. January 6, 2024, the scouts will come to your location and pick up your bare tree. Please call or contact the scouts via Facebook to arrange pick up. The trees will be taken to the landfill and ground for landfill cover. • December 16, 2023, from 3:OOpm to 5:OOpm — Join SWAB at the Kodiak Public Library for a Holiday Craft Day. Children can make handmade ornaments of natural materials. Adults will be offered candle painting and decoration. Both items can be prepared as a gift to give. Solid Waste Contract Committee — First meeting was scheduled for December 12, 2023, however, there was not a quorum of assembly members available. Landfill — • New Excavator is scheduled to ship on December 13 sailing with Sampson Tug and Barge. Brechan Construction has been hired to transport the machine to the landfill. Brechan rental excavator will be utilized until factory training can be arranged. Staff is in discussions with the vendor. • Staff has been contacted by the Denali Commission to proceed into the second - round consideration for funding associated with funding request for landfill planning. This is a collaboration with KANA to investigate and identify potential processing of Haz mats at the KIB landfill from the various villages. A meeting will be held next week to discuss roles and the path forward. KFRC- • Discharge Permit —Permit has been accepted and begins January 2024. Anticipate advertisement of the RFP for the decontamination System Upgrade in December or early January. Borough Manager's Report AGENDA ITEM #4. a. Awaiting discussion with Long Technologies regarding upgrade and review of system coverage and possible additional monitoring. This meeting is being delayed minimizing cost and perform work and analysis on several facilities. Sewage lift station has been rewired and electrical removed from the interior of the lift station. New pumps and guide rails are installed. New floats and interior components have been upgraded. Staff is monitoring for proper function and performance. KIBSD — • North Star Windows & Siding Phase 2 — Capital Project is being finalized and closed. Thank you to Wolverine Construction for completing this project. • East Roof Proposal Package — Work has been ordered. • North Star Roof Replacement and Skylight Replacement — Architect is focused on this roof and skylight replacement. • Karluk and Larsen Bay — Replacement parts are on order for planning of a final repair trip to these two facilities. KIB has been informed that the KIBSD will not be going to Karluk. KIB will plan to travel and facilitate repairs after the holidays. • Petersen Roof — Regular bi -monthly meetings are being held. Submittal process has started. Upon submittal approval contractor will begin ordering materials. Anticipate on site work to begin in Spring of 2024. Weather dependent. Leachate Treatment Plant — Leachate Treatment Plant process equipment is functional. Alterations to the piping are required and are being discussed to adapt for maximum design flows to be achieved. Design and construction teams are collaborating to diagnose not providing the 200 gallons per minute that the specification required. KIB staff is asking for consideration due to not meeting the designed specifications. Discussions are ongoing. Due to performance issues a request for an end date extension will be made for a date in the future. Health and Facilities Advisory Board — Met on December 11, 2023. Discussions regarding reimbursement for design was held. Status update on the various funded design stages was given. Architectural Review Board members will be sent email specific to the sterilization and associated component design at the 65% design level for informational purposes. Next meeting is scheduled for January 8, 2024, at 3:00pm in the KIB Conference Room. Long Term Care — Spill costs and lease are to be discussed soon. Furnace upgraded and repairs are completed, and the heating is functioning and stabilized. Borough Building — Concrete has been poured. Contractor is heating the tented concrete for a minimum of ten days. KEA has energized the new transformer and power is provided to the electric boiler. Proctor Sales will be scheduled for a site visit and boiler startup. Generator work will continue. No projected completion date has been provided to the KIB. Asphalt patching required cannot be completed until summer of 2024. Borough Manager's Report AGENDA ITEM #4.a. Finance Department Property Taxes — Delinquent Notices are in the mail to those taxpayers who have not paid their taxes. Staff will start preparing the real property foreclosure documents and annual newspaper publication in January for those properties with balances due. Staffing — Currently advertising for three open positions: a General Accountant, an Accounts Payable Technician, and a Payroll Technician. Taxation Software — The Enterprise Assessment and Tax Project Kickoff meeting was held today. A high-level presentation and document request started the process that will take about eighteen months to complete. IT Department Network Infrastructure Backups - Our Network Analyst (Mitchell) is continuing to work on updating and documenting the KIB switch infrastructure — currently testing out firmware pre -installation. i. Project to harden and standardize our network devices. a. Shut down unneeded ports. b. Update passwords and password policy C. Documentation of network devices d. Evaluate management software. e. Update any end -of -life devices either via patches or replacement. f. 802.11 x Wireless implementation. g. Evaluate VPN solutions. h. Audit DMZ and public facing network devices and servers. Exchange 2019 upgrade — IT is working on upgrading our Exchange on premise server to 2019 and migrating it and the Borough mailboxes to a new resource Forest named mail. kodiakak.us. Upgrade kib.local to kib.kodiak.us — IT is researching a project to rename the kib.local Microsoft Windows forest to kib.kodiakak.us — this will align our systems with Microsoft best practices, and provide a solid foundation for subsequent additional infrastructure and security measures. GIS- Aggregating and simplifying tools for Borough and public use: i. Spoke to GIS about this and he is continuing to create map tools that are deployed via ARCGS Online, expect this to be an ongoing process as needed by the rest of the Borough. ii. Working on moving archival data to current GIS website for backwards compatibility. Borough Manager's Report AGENDA ITEM #4.a. iii. Working on the Parcel Fabric (Basically making the parcel lines more accurate to reality through a long arduous process) iv. Working on Documentation of our GIS Data and what's critical/how we edit it/why we edit it in this way. v. Working on Identification of Missing Parcel IDs within our system. vi. Continuing with his project to Identify, organize and standardize our GIS data. Windows 11 Deployment -approximately 85% completed. Roughly 3 more workstations need to be updated to 11. These are located at the two fire stations and so IT will be coordinating with Engineering and Facilities to get them upgraded with minimal interruption. ii. Roughly 9 more laptops need to be updated - need to coordinate with the users to bring in. Two -Factor Authentication - IT is reviewing the 2 -factor authentication system we have so we can deploy it. Should have a timeline for this project by next week barring issues. i. Project is pending until we complete the rename of kib.local and the migration of exchange 2019. Network Security - Ongoing efforts to improve overall network security. i. Active directory accounts review 1. Active Directory reorganization ii. Group policy review iii. Firewall and network review iv. Network device vulnerability scanning V. System Patch policy and enforcement Office 365 training and deployment - Microsoft Teams will be rolled out for communication use. i. Review deployment methods and group policy settings ii. Put together training material for users to review. iii. Offer training via zoom for interested employees. iv. Deploy software. V. Review and refine deployment for issues and learned lessons. Engineering Leachate Plant software upgrade - IT is working with the Jacobs engineering firm to upgrade the PLC and HMI software at the leachate plant. i. This is approximately 80% completed. IT met with Jacobs engineer to install software on control panel at the plant. Still need to install additional software on the user workstation as well. Borough Manager's Report AGENDA ITEM #4.a. Win911 review — IT is also working with Jacobs engineering and our Engineering department to review and update if needed our Win911 system. Assessing Department — Senior Citizen / Disabled Veterans Exemptions- Assessing has successfully mailed out 850 Senior and 106 Disabled Veteran reminders that the period is now open to apply for those exemptions. Reminder Post Cards- Reminders for Senior Citizen/Disabled Veteran application due dates were sent to the printer for a December 13, 2023 mail out date. . Tax Roll — There are two outstanding applications that we are awaiting information on from the PFD that cannot be processed until the applicants contact the PFD office themselves. Assessing checks for updated information weekly. Applicants have until December 29, 2023, to provide information to the PFD for us to adjust their taxes. Up Next — Entering the results of inspections into the Assessing software and completing work on building permits and new discovery changes that occurred after the roll was certified. Vacancy- The Assessing Department has one open position for Appraiser tech, due to a resignation. Community Development — New Planner — Joe Grochmal, the new associate planner had his first day of work on December 11. Joe is excited to begin his work with the Borough. Planning & Zoning Commission — The Planning and Zoning Commission held a work session on December 13 to review a variance case. The public hearing for this case will be at the Planning and Zoning Commission's regular meeting on December 20. PRO -Housing Grant Update — Applications for the grant are still under review. No timeline for completion of the application review has been posted. Community Development staff is reviewing the criteria for an AARP grant for technical assistance to assist with housing research in case the Borough is not selected for the PRO -Housing Grant. Calls for AARP grant applications typically begin in mid-January. Borough Manager's Report (Congress of t4e 31niteb Ottttes was4linaton, OT, 20515 December 7, 2023 The Honorable Deb Haaland Secretary Department of the Interior 1849 C Street, NW Washington DC 20240 Secretary Haaland: AGENDA ITEM #4.a. We write to request the Department of the Interior (Department) provide a determination regarding a "public purposes" deed restriction on former Bureau of Indian Affairs land currently held by the Kodiak Island Borough. The Borough seeks to lease the infrastructure on this property for the development of much-needed housing for seafood processor workers. The property in question was conveyed to the borough in 1980 from the State of Alaska, who acquired it from the Bureau of Indian Affairs in 1971 in the form of two adjoining lots, approximately 8 acres total. The deed contains a restrictive covenant that limits the use of the property "for school or other public purposes only." The Borough is considering a proposal from a seafood company to convert the buildings into housing sufficient to accommodate 60 to 80 processing workers. The company would restore the facilities at its own cost, with the Borough leasing the underlying property. Using the property to develop housing would seem to meet the "public purposes" restriction, but an official determination from the Department is necessary before moving forward. In addition, before moving forward with this proposal, the Borough understands it must make the property available to area tribes consistent with other requirements in the deed. The lack of affordable housing for ownership or rent in Kodiak is a major problem for the community. This housing shortage is compounded by the fact that most of the land in the community is in federal ownership as part of the Kodiak National Wildlife Refuge. This lack of available land for development further necessitates a broad interpretation of the "public purposes" deed restriction in this case. A recent survey by the Kodiak Island Housing Authority presents strong data that reveals the Island's significant housing challenge and the difficulties it presents Kodiak's residents, including many families with low and moderate incomes. The survey notes that "more than one- quarter (28%) of Kodiak households are `cost -burdened,' meaning they spend 30% or more of monthly household income on rent or owner costs. There are a total of 1,007 cost -burdened households in Kodiak." Survey interviewees cite the lack of available land for construction as the most significant barrier to increasing housing. These impacts are not only being felt by the seafood industry, Kodiak's largest private employer, but also in the public sector, as it has Page 106 of 109 Borough Manager's Report AGENDA ITEM #4.a. become extremely difficult for the community to attract and retain teachers, police officers, dentists, nurses, and other important professionals. The U.S. Coast Base — Kodiak is also undergoing a significant expansion and investment as it welcomes the homeporting of four new vessels (Offshore Patrol and Fast Response Cutters) later this decade. While many Coast Guard personnel will be housed on base, others will seek housing elsewhere in the community, further exacerbating Kodiak's housing stock stress. The Borough's lease proposal would also free up more rental housing in the community and open up lower to moderate -income housing supplies. This lease proposal may not solve the housing shortage at large in the community, but it will make a difference in addressing the immediate issue at hand. We agree with the Borough that the leasing the property for the development of housing meets the "public purposes" restriction in the deed conveyance and the Department should make a favorable determination in this case. Thank you for your consideration and we look forward to your reply. Lisa Murkowski United States Senator Borough Manager's Report Sincerely, 1��M 4157c� Dan Sullivan United States Senator Marg Sattler Peltola Representative for All Alaska Page 107 of 109 BOROUGH December 14, 2023 CLERK'S REPORT 1. AAMC Conference Q The Clerk's Office Staff attended the AAMC Conference in Anchorage. The theme for this year's conference was "Dare Greatly. " Clerks Dare Greatly every single day knowing that what we do for our communities matter. Our two-day conference was filled with a lot of learning and networking with our fellow Alaska Clerks. We are grateful that we were afforded the opportunity to attend. 2. Projects Q Processing transfer of liquor licenses Q Recording of Plats AGENDA ITEM #5.a. Q Worked with the Assessor and finalized our timeline and tasking for the Board of Equalization in May 3. Records Projects IA We have been working diligently on our electronic records. Backtracking and correcting/adding records and information that were missing in our files. • There have been deleted vital records that we were able to retrieve from our backup. • Those that we were not able to retrieve, we are rescanning back into Laserfiche. Page 108 of 109 Boroughberk's Report AGENDA ITEM #5.a. • Finalizing our work with Department Directors regarding records retention series revisions. • Reviewing archived contracts in Laserfiche (electronic records software). Produced new formats for naming contracts, extensions, amendments, & change orders. • Working on a records destruction list. We hope to present the list at the next meeting. • Working with IT to rebuild our folder paths and configure our meta data for our electronic files. 4. Travel and Leave Dates Q Please send me your travel dates if you are travelling or taking any time off for the upcoming Holidays. Q April 2024, Cook Inlet Regional Citizens Advisory Council, Kenai, Alaska 5. Upcoming Meetings Q December 21 Regular Meeting December 28 Work Session January 4 regular meeting Page 109 of 109 Borough?Clerk's Report KODIAK ISLAND BOROUGH Meeting Type: hc,5t,1 o U11 wOf� C_>e5k iM Date: I l - l q - 416 Please PRINT your name legibly Phone number CC) + 7z 71 "iO -7 9 C-/ 9(2 7 q Z12 ,�5-_F,//.Z VL 4�WN q0 7 1-86 -PMz-- f SSS C �•-nom✓ �'o j- G 7 C �0,7 -91(12-�� 3 l -91/ -(Z -C/ ca Pat/d Vad4la, G ��