2023-11-09 Work SessionKodiak Island Borough
Assembly Work Session
Assembly Chambers
Thursday, November 9, 2023, 6:30 p.m.
Work Sessions are informal meetings of the Assembly where Assembly members review the upcoming regular
meeting agenda packet and seek or receive information from staff. Although additional items not listed on the
work session agenda are discussed when introduced by the Mayor, Assembly, or staff, no formal action is taken
at work sessions and items that require formal Assembly action are placed on regular Assembly meeting agenda.
Page
1. CITIZENS' COMMENTS 1-907-486-3231 or Toll Free 1-855-492-9202
(Limited To Three Minutes Per Speaker)
�►WITe121►1OYUII121LTA 601
a. Discuss Resolution No. FY2024-11 Adopting A State Legislative 3-41
Capital Improvement Project Priority List For The 2024
Legislative Session
Aaenda Item Report - Pdf
b. Assembly Review Of Alaska Municipal League Resolutions 42-54
Agenda Item Report - Pdf
3. PACKET REVIEW
a. PUBLIC HEARING
• Ordinance No. FY2024-08 An Ordinance Of The Assembly
Of The Kodiak Island Borough Amending Kodiak Island
Borough Title 15 Buildings And Construction, Chapter 40
Building And Lot Numbering, Section 15.40.080 Procedure
For Addressing Newly Created Lots
RESOLUTIONS
• Resolution No. FY2024-11 Adopting A State Legislative
Capital Improvement Project Priority List For the 2024
Legislative Session
OTHER ITEMS
• Approval Of Reimbursement To Providence Kodiak Island
Medical Center For The Approval From 35% Design
Status To 65% Design Of Air Handling Unit Fan Wall At A
Cost Of $38,000
• Approval Of Reimbursement To Providence Kodiak Island
Medical Center For Payment For The Design Of Automatic
Transfer Switches To 35% At A Cost Of $45,033
Page 1 of 54
• Approval Of Reimbursement To Providence Kodiak Island
Medical Center For Payment For The Design Of Chiller
Replacement To 65% At A Cost Of $187,824
• Approval Of The Parks and Recreation Committee By -
Laws
• Approval Of The Amendments To The Solid Waste
Advisory Board's By -Laws
4. MANAGER'S COMMENTS
5. CLERK'S COMMENTS
7. MAYOR'S COMMENTS
8. OFFICIAL TRAVEL CALENDAR
• December 4, Newly Elected Officials Training
• December 5, Alaska Conference of Mayors
• December 6, NEO Virtual Training
• December 6-8, AML 73rd Annual Conference, Anchorage
This meeting is open to the public and will be broadcast on the Borough's YouTube Channel. Meeting packets are available
online. Please subscribe to get meeting notifications when meeting packets are published. For public comments, please call
(907) 486-3231 or (855) 492-9202.
Page 2 of 54
AGENDA ITEM #2.a.
KODIAK ISLAND BOROUGH
STAFF REPORT
NOVEMBER 9, 2023
4 '
x ASSEMBLY WORK SESSION
SUBJECT: Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital
Improvement Project Priority List For The 2024 Legislative Session
ORIGINATOR: Meagan Christiansen, Grant Writer/Special Projects Support
RECOMMENDATION:
For discussion of the Assembly.
DISCUSSION:
The Assembly annually passes a resolution identifying capital projects deemed as priorities to
submit to the Alaska Governor and State Legislative delegation for consideration of funding
opportunities at the State level.
Staff have produced a suggested list for your consideration. The Assembly was presented
this item during the discussion with Lobbyist Mark Hickey on October 26.
ALTERNATIVES:
FISCAL IMPACT:
OTHER INFORMATION:
Kodiak Island Borough
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
Page 3 of 54
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
AGENDA ITEM #2.a.
KODIAK ISLAND BOROUGH
RESOLUTION NO. FY2024-11
A RESOLUTION OF THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH ADOPTING A
STATE LEGISLATIVE CAPITAL IMPROVEMENT PROJECTS PRIORITY LIST FOR THE 2024
LEGISLATIVE SESSION
WHEREAS, the Kodiak Island Borough represents approximately 13,000 residents of the
Kodiak Island Archipelago living in six incorporated cities and one community governed by a tribal
council government; and
WHEREAS, a Borough—wide capital improvement program has been adopted by the Kodiak
Island Borough Planning & Zoning Commission which identifies major needs of the island
community for the next five years; and
WHEREAS, the Kodiak Island Borough Assembly has reviewed the borough -wide capital
improvement program adopted by the Planning & Zoning Commission and identified major
projects to submit to the Alaska Governor and State Legislative Delegation for funding
consideration.
NOW, THEREFORE, BE IT RESOLVED BY THE ASSEMBLY OF THE KODIAK ISLAND
BOROUGH that:
Section 1: The Kodiak Island Borough's State Legislative capital improvement project
priorities (unranked) for the 2023 legislative session are as follows:
Hospital Facility Sterilizer and Boiler Replacement
Estimated Project Cost $1,000,000
Needed Funds $1,000,000
The Kodiak Island Borough owned hospital facility boilers and associated system components
are aging along with the facility. The system components that have been identified for major repair
or replacement include the oil -fired boilers, chiller unit, reverse osmosis water system, steam
generation equipment and sterilization equipment are all in consideration. The oil -fired boilers
provide the major hydronic heating component for several associated systems at the hospital
facility. They include the production of facility heat, hot water and the hot water component for
conversion to steam via a steam generator that is distributed to the sterilizers required for the
hospital operations. The sterilizer equipment has been maintained at an operational level. Due to
the age of the existing equipment, increased frequent failures associated with the steam generator
and sterilization equipment has affected the operational capacity of the hospital to the point where
operating room availability is managed at times with the functional capacity of the facility to ensure
properly sterilized equipment. All of the system components need to be evaluated for replacement
Resolution No. FY2024-11
Page 1 of 6
Page 4 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
AGENDA ITEM #2.a.
timeframes as and of the individual component failures may lead to services being suspended at
the hospital facility.
Kodiak Community Health Center Expansion
Estimated Total Project Cost $25,850,000
Funding acquired $8,317,901
Estimated Design Cost $1,200,000
Needed Funds $1,200,000
The Kodiak Community Health Center (KCHC) is currently housed within the Kodiak Island
Borough owned hospital facility and co -located with Providence Kodiak Island Medical Center.
KCHC is in need of increasing their clinic space and is planning an expansion project. Due to
various changes in the community in the past five years, patient and provider counts have
increased and pushed this organization to the maximum of their space limitations. Additionally,
an increase in patient population is expected to coincide with a local US Coast Guard base
increase in employees and their families in the next few years.
With appropriate funding KCHC proposes to expand and improve the clinic space and continue
to provide needed services in the Kodiak community. KCHC has acquired funding in the amount
of $8.3 million toward this project, however design activities are not eligible within this funding.
KCHC is seeking design funds in order to move forward with the project and will continue to fund
raise for the balance needed.
Bells Flats Commercial Truck Route Road Improvements
Estimated Project Cost $10,475,000
Funding Acquired 47,150
Needed Funds 10,427,850
This project will improve an existing circuit of roads in the Womens Bay area of the Kodiak Road
System. The roads included in this project are traveled by commercial trucks transporting product
from a gravel extraction site on Middle Bay Drive which produces the bulk of the gravel materials
for concrete and asphalt production in the Kodiak community. It is estimated that this site can
continue to produce a significant supply of gravel until at least the year 2040. These roads also
support approximately 350 residents and other small business operations. A traffic pattern utilizing
this loop of roads has been established to minimize collision potential. Empty gravel hauling
trucks enter the gravel extraction site at one location and exit at a separate location, allowing the
trucks to travel one-way along the circuitous path.
This project will preserve improve road surfaces by reconstructing approximately three (3) miles
of roadway including Sargent Creek Road, Salmonberry Drive, Middle Bay Drive, and Bells Flats
Road in the Bells Flats Subdivision approximately eight miles south of the City of Kodiak. These
routes all link together and are the main loop through the Women's Bay Area. Reconstruction of
Resolution No. FY2024-11
Page 2 of 6
Page 5 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Inn...
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
AGENDA ITEM #2.a.
the Sargent Creek Road will begin at Rezanof Drive and extends to the intersection of Bells Flat
Rd. continuing from the intersection of Salmonberry Drive to the end of Middle Bay Drive
(approximately 2 miles of paved road surface). The intersection of Bells Flat Road and Sargent
Creed Rd, including all of Salmonberry Drive, back to the intersection Bells Flat Rd to Middle Bay
Dr will also be reconstructed (approximately 1 mile of gravel/RAP road surface). Existing
pavement will be milled and repaved, RAP surface areas will be paved, and subsurface
improvements to be completed on portions of the project as well as 8 culvert replacements.
Sargent Creek road, included in this project, is the single road for entry into and exit from the
subdivision, thus connecting all residents of the subdivision with goods and services such as
medical, educational, travel (airport and Alaska Marine Highway), grocery, home goods, repair,
etc. in the greater Kodiak city area.
Pedestrian Pathways to North Star Elementary School
Estimated Project Cost $2,000,000
Needed Funds $2,000,000
This project will provide safe pedestrian access to an elementary school located atop a hill and
surrounded by residential neighborhoods without sidewalks along the narrow unpaved roads. It
also connects to a pedestrian/bike path along an arterial road that is popular among residents
and visitors for commuting and recreational use, and a recreational trail that follows a nearby
creek.
A separated five -foot -wide pedestrian gravel pathway will be constructed along two residential
roads leading to an elementary school. A separated pedestrian pathway addresses the risk for
vehicle -pedestrian interactions, particularly when roads are snow and/or ice laden, by
constructing a gravel pathway outside of the roadway. The dangerous walking conditions during
winter have necessitated a hazardous bus route for students living within one mile of the school,
provided by the Kodiak Island Borough School District.
Chiniak School Well and Water Treatment System
Estimated Project Cost $600,000
Local Funds $75,000
Needed Funds $525,000
Water at the Chiniak school is supplied by a local well that produces a sufficient quantity but low
quality of water to the school. Because the water is non -potable it requires treatment prior to
consumption by students, staff, and visitors to the small community school. A previous chlorine
treatment system was removed many years ago due to age and difficulty of maintenance during
a several year school closure. Since the school re -opened different water sources have been
explored but found to be unusable. The best option is to re-establish a water treatment system
associated with the existing well for water supply.
Resolution No. FY2024-11
Page 3 of 6
Page 6 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Inn...
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
AGENDA ITEM #2.a.
North Star Elementary School Roof and Skylight Replacement
Estimated Project Cost $2,500,000
Local Funds $718,000
Needed Funds $1,782,000
The system of skylights within the North Star Elementary School roof provide daylight to the
school's library, common area and cafeteria. The skylight system has been leaking and
permeating the roof membrane, requiring replacement of both. This project provides for
replacement of the skylight with a new skylight system, along with a comprehensive replacement
of the low slope roofing membrane and associated assembly.
City of Larsen Bay Reservoir Spill Way
Estimated Project Cost $1,200,000
Needed Funds $1,200,000
The water reservoir spill way in the community of Larsen Bay is eroding and is nearing failure.
This reservoir provides drinking water and hydroelectric power to the residents in the second-
class city on Kodiak Island's west side.
City of Ouzinkie Electrical Distribution System Replacement
Estimated Project Cost $2,500,000
Needed Funds $2,500,000
The electrical distribution system in the second-class city of Ouzinkie which is in the Kodiak Island
Borough is in need of replacement. The electrical transformers in this community's electrical
distribution system have rusted due to exposure to the island's saltwater atmosphere, allowing
water into transformers which causes extreme loads, short circuits and the potential for explosion.
Further, the distribution cable is now beyond it's expected life and there are no alternatives for
providing power to many of the community residents should a failure occur.
City of Port Lions Fire Station Insulation
Estimated Project Cost $35,000
Needed Funds $35,000
The fire station in the second-class City of Port Lions is not insulated which necessitates that the
fire truck be left empty of water during the winter months when temperatures drop below freezing
and limits the time and ability to respond to a fire related emergency. The City of Port Lions
requests funds for the purchase and installation of building insulation materials.
Service Area Road Improvements and Paving
Estimated Project Cost $10,000,000
Local Funds $1,000,000
Needed Funds $9,000,000
Resolution No. FY2024-11
Page 4 of 6
Page 7 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
AGENDA ITEM #2.a.
This project addresses the on-going need to improve portions of the roads in the Kodiak Island
Borough's Road service areas: Service Area No. 1, Womens Bay Service Area, Bay View Road
Service Area, and Monashka Bay Road Service Area. These roads connect residential
neighborhoods with the greater Kodiak community.
Paving projects will address main thoroughfares or busy neighborhood roads. Improvements to
major drainage courses, installation of guard rails, and other identified road improvement needs
may also be addressed with this funding.
Priorities for expenditure of these funds are determined by the road service area boards. Local
contributions to road improvements may be funded through local improvement districts where
those in the district are taxed a proportion of the project cost.
Mill Bay Beach Access and Recreation Upgrade
Estimated Project Cost $500,000
Needed Funds $500,000
Mill Bay Beach is a recreational area heavily used by residents, sport fishermen and community
groups who come to access this beach site located close to town. Time, tide, and use have eroded
safe access to the two stretches of beach at this site. This project includes new stairs, walkways
and trail enhancements between the two beaches, as well as a small raft/kayak launch.
Anton Larsen Bay Road Extension to Ice Free Water
Estimated Project Cost $10,450,000
Funding Acquired $450,000
Needed Funds $10,000,000
An extension of the Anton Larsen Bay Road will be a public road of approximately 2.2 miles to ice
free waters just outside Anton Larsen Bay. The project will include a boat launching ramp. The
road will provide year around road access to Kodiak for residents of Port Lions, Ouzinkie and
much of the west side of Kodiak Island and all of Afognak Island without having to travel around
Spruce Cape.
Year-round travel by vessel to Kodiak around Spruce Cape is treacherous. Extending the Anton
Larsen Bay Road makes winter traveling safer and provides access to critical services located in
the City of Kodiak — including hospitals and businesses. The road extension will support existing
commercial operations in Marmot Bay such as Kodiak Electrical Association hydro -electric plant,
Koniag Inc. rock quarry, and Kodiak Regional Aquaculture Association's Kitoi hatchery. Moreover,
an extended road will enhance summer and winter recreational opportunities and activities for all
Kodiak residents.
Resolution No. FY2024-11
Page 5 of 6
Page 8 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
AGENDA ITEM #2.a.
The Anton Larsen Bay Road extension is envisioned as a project undertaken by the Native Village
of Ouzinkie or the Spruce Island Develop Corporation. It will be built on a road right-of-way
donated by the Ouzinkie Native Corporation and Koniag, Inc. The road extension is also in the
road inventory of the Sun'aq Tribe of Kodiak. Maintenance of the extension is expected to be by
one or both tribal entities. The route is identified in the Kodiak Transportation Plan as in important
upland facility. Routing is complete and most of the design work is finished. An environmental
assessment was completed in 2020. It is requested that this project be included in State of
Alaska's State Transportation Improvement Program (STIP). Funding will be from State and/or
Federal funds with Ouzinkie Native Corporation and Tribe providing the right-of-way and in-kind
services.
Section 2: The Kodiak Island Borough administration is hereby instructed to advise our State
of Alaska Governor and Legislative Delegation of the Capital Improvement Projects Priority List
adopted by the Kodiak Island Borough Assembly.
ADOPTED BY THE ASSEMBLY OF THE KODIAK ISLAND BOROUGH
THIS DAY OF , 2023
KODIAK ISLAND BOROUGH
Scott Arndt, Borough Mayor
VOTES:
Ayes:
Noes:
Resolution No. FY2024-11
ATTEST:
Nova M. Javier, MMC, Borough Clerk
Page 6 of 6
Page 9 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
AGENDA ITEM #2.a.
Introduced by:
CDD
Requested by:
P&Z Commission
Drafted by:
CDD
Introduced on:
9/13/2023
Adopted on:
9/20/2023
KODIAK ISLAND BOROUGH
RESOLUTION NO. FY2024-27
A RESOLUTION OF THE KODIAK ISLAND BOROUGH PLANNING AND ZONING
COMMISSION RECOMMENDING A CAPITAL IMPROVEMENT PROJECTS PRIORITY
LIST FOR FY 2024-2027
WHEREAS, the Kodiak Island Borough represents approximately 15,000 residents of the
Kodiak Island Archipelago living in six incorporated cities and one community governed by
a tribal council government; and
WHEREAS, a Borough -wide capital improvement program is adopted annually by the
Kodiak Island Borough Assembly with recommendations from the Planning & Zoning
Commission. This list identifies the major needs of the island community for the next five
years; and
WHEREAS, THE Kodiak island Borough identifies priority projects to be submitted to the
Alaska State legislative delegation and the Federal legislative delegation when applying for
grants;
NOW, THEREFORE, BE IT RESOLVED BY THE PLANNING AND ZONING COMMISSION
OF THE KODIAK ISLAND BOROUGH THAT:
Section 1: The Kodiak Island Borough Planning and Zoning Commission recommends the
following capital improvement projects, in order of priority, for adoption into the Kodiak Island
Borough FY 2022-2026 CIP list of Capital Projects:
1. Service Area One, Women's Bay Service Area, Bayview Service Area and
Monashka Bay Service Area Road and Paving Improvements
$10,500,000
To be applied to priority projects identified by the road service districts including Service
Area One, Womens Bay Service Area, Bayview Service Area, and Monashka Bay Service
Area. Priorities will be based on recommendations made by the elected service area
boards and professional engineering study. Local contributions to project engineering and
design may be funded through local improvement districts where those in the district are
taxed a proportion of the project.
2. Kodiak Island Borough Mission Road (Including Spruce Cape) Safety
Improvements
$20,000,000
Mission Road is a major collector street for the community, and one of the roads that lead
to downtown. The project will widen the existing two (2) lanes and provide a pedestrian and
bike path on the shoulder or on the sidewalks. This request funding will provide for the
needed planning and design that will help develop a scope of work and the overall project
cost.
Kodiak Island Borough, Alaska
Resolution No. FY2024-27
Page 1 of 15
Page 10 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
AGENDA ITEM #2.a.
3. Kodiak Island Borough Mill Bay Beach Access and Recreation Upgrade
$163,000
This beach is heavily used by residents, sports fishermen and the community who come to
view this bay located close to town. New construction items proposed here would include
new stairs, walkways, and trail enhancements between the two beaches, as well as a small
raft/kayak launch.
4. The City of Larsen Bay Reservoir Spill Way
$1,200,000
The spill way is eroding and will eventually fail. The City of Larsen Bay gets 70 percent of
our drinking water from the reservoir. The City also operates the Hydro Electric plant from
the same reservoir.
5. The City of Ouzinkie's Electrical Distribution System
$2,500,000
Age and exposure to salt -water atmosphere have revealed that all of the transformers on
Ouzinkie's electric distribution system have rusted out. When the lids rust thru, water gets
into the transformer causing extreme loads, short circuits, and the potential, (due to buildup
of gas pressure), of explosion with consequences to individuals and property in the vicinity.
It is expected that this preventive renovation will reveal other situations such as individual
poles that need replacement and rerouting of transmission lines. A highly critical and
significant section of Ouzinkie's power is connected to the hydroelectric plant. This
connection is by direct burial concentric neutral 7,200 -volt power lines. This quality of
cable as it was installed has been estimated by Jim Develin, KEA's Electrical Engineer to
have exceeded its normal expected life and is subject to failure any day. The western
section of town is serviced by the same type of cable and there is no possibility of
delivering power to these residents, temporary or otherwise when this failure occurs.
It is desired that this project be engineered, and project managed thru The Alaska Energy
Authority.
6. The City of Port Lions Water Distribution Replacements and Expansion
$8,000,000
The original water and sewer distribution system for our community was built after the 1964
Good Friday earthquake and tsunami forced the displaced residents of Afognak to relocate
in what is now known as Port Lions. In 1994 a new system was installed. However, the
contractor did not complete the job correctly. Many homes were not connected to the new
system and many homes were connected incorrectly. The now connected system is
considered aged out because it is over twenty-five (25) years old. The City of Port Lions
Public Works crew consistently has a list of leaks and blockages to repair. In some places
the system is beyond repair. We are consistently over budget for our water and sewer
utility due to the unexpected expense of purchasing parts and paying our crew to repair
and replace section of the distribution system. The outdated system drastically hinders
community expansion efforts. The City of Port Lions are working closely with the Alaska
Native Tribal health Consortium (ANTHC) for replacement project to be included in their
funding pipeline as soon as possible.
7. The City of Old Harbor Hydroelectric Power Project
$10,500,000 (2012 Projected Cost)
This project is to construct a run -of -the -river hydroelectric facility with a diversion structure,
pipeline, powerhouse, and electric transmission line. The project will have a low flow
capacity of 140 kW and a peak capacity of 525 kW. This renewable resource will provide
electrical power for the residents of Old Harbor, along with reducing diesel fuel use for
power generation by at least 95%. It will help provide opportunities for economic growth
Kodiak Island Borough, Alaska
Resolution No. FY2024-27
Page 2 of 15
Page 11 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
108 and business development in the community.
109
110 8. The City of Old Harbor Septic Tank Replacement
111 $100,000
112 Install a sewer septic tank in downtown Old Harbor, Alaska.
113
114 9. Anton Larsen Bay Road Extension to Ice Free Water
115 $10,450,000
116 An extension of the Anton Larsen Bay Road to ice -free waters will provide year-round access
117 to those communities located in the Kupreanof Strait and Kizhuiak Bay area as well as those
118 who use the Island's West side for commercial and recreational purposes. Many times during
119 the year travel by vessel to Kodiak is treacherous. Extending the road to ice -free waters
120 makes traveling safer, providing access to critical services located in the City of Kodiak
121 including hospitals and businesses. This is envisioned to be a cooperative effort between
122 KIB, AKDOT, Ouzinkie Native Corporation (surface estate owner), Koniag Inc. (surface
123 estate owner) and other tribal entities. This route was identified in the Kodiak Transportation
124 Plan as an important upland facility. Some or all of the aforementioned parities may
125 participate in funding this.
126
127 10. Womens Bay Service District West Rezanof Drive Pedestrian Improvements
128 $5,000,000
129 The section of West Rezanof Drive near Sargent Creek and the Russian River
130 frequently has visitors taking advantage of fishing opportunities and other wildlife
131 viewing activities. Roadside parking and pedestrian activity along this corridor are
132 not compatible with the high-speed vehicular traffic on the roadway. To enhance
133 and eliminate conflicts between user groups, new construction items are being
134 proposed. This includes, but is not limited to, additional off-street parking,
135 boardwalks, pedestrian bridges, and other pedestrian improvements.
136
137 11. Chiniak Highway Paving
138 $42,000,000
139 The residents of Chiniak are requesting to seek funding for paving the Chiniak
140 Highway from mile maker 30 to mile marker 42. The road, owned by the State,
141 requires grading, drainage work, paving and construction pedestrian facilities.
142 Currently the road is gravel which possess increased icy conditions in the winter and is
143 dusty at all times of the year when dry. The gravel road requires continual
144 maintenance. The residents believe that maintenance will be reduced, and public
145 health and safety will increase with the paving of the road. Cost was estimated at
146 $3,500,000.00 per mile per state and federal calculations.
147
148 12. The City of Karluk Community Water Tank Distribution Systems
149 $250,000
150 The current water tank in Karluk has been condemned by the DEC. The Karluk IRA Tribal
151 Council has a new water tank sitting in the Native Village of Karluk. Funds are requested
152 for installation for the water distribution to the Village.
153
154 13. Women's Bay Service District South Russian Creek Road Repaving
Kodiak Island Borough, Alaska Resolution No. FY2024-27
Page 3 of 15
Page 12 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
155 $1,800,951.75
156 The roadway was originally paved circa 1985 using mostly federal financing under the
157 Intermodal Service Transportation Efficiency Act. Since that time the roadway has been
158 maintained by the Womens Bay Service District with taxes collected from the residents for
159 that purpose. The Service District mill rate is currently 2.5 mill s which is the highest of all
160 Borough Service Districts. The current budget has barely been sufficient to keep roads
161 cleared of snow and ice and also maintain the 12 miles of road in the district. Over the
162 years the maintenance for the South Russian Creek Road paved area has increased as
163 the asphalt has deteriorated and at this time maintenance attempts are becoming futile and
164 exponentially more expensive. The estimate from Brechan Construction, LLC to repave the
165 roadway is $1,800,951.75 (see attached estimate). If the road is repaved, it would reduce
166 the overall maintenance costs and allow the Service District to re -allocate money to other
167 needed projects.
168
169 14. The City of Port Lions Anton Larsen Dock, Launch Ramp, and Parking
170 Improvements
171 $2,000,000
172 The Anton Larsen Dock is heavily used by Port Lions and Ouzinkie residents, as well
173 as others living on the Island's West side, commercial fishermen, charter operations,
174 and citizens living on Kodiak's Road system. Improvements to this facility have been
175 made in the recent past. However, given the sites popularity, an expansion of the
176 parking facilities is needed. Additionally, a floating dock space is needed at the ramp so
177 that users can more safely pull boats or cargo to shore.
178
179 15. The City of Ouzinkie Municipal All -Purpose Complex
180 $4,807,500
181 The Ouzinkie City Offices have been housed, for decades, in an old BIA territorial school
182 that is home to hundreds of bats, old lead paint, and an electrical and plumbing system that
183 needs rigorous upgrading. The City Office Building consists of: offices, a conference room
184 and meeting area, maintenance equipment rooms, supply rooms and a small apartment.
185 We estimate that it would be less expensive to build from the ground up.
186 Each year the community faces various emergencies like: earthquakes generating tsunami
187 warnings and evacuations; winter storms that knock out power, downpours resulting in
188 water facility breakdown to winter ice and summer potholes wrecking equipment. New
189 situations such as the pandemic we are in bringing to the fore the lack of physical location
190 for locals seeking care, isolation, and resources. This building with its own generator for
191 power, would have storage of water, food and sleeping areas and would serve as a
192 command center for the whole community and the surrounding areas on Spruce Island.
193 Being placed as or above the 100 -foot inundation zone would be for the safety of the
194 community, building, equipment, and employees. It would also ensure that the community
195 would have a post emergency safe haven.
196 The complex would enhance basic operations. Emergency management addresses
197 extreme events, across all hazards and through the phases of mitigation, preparedness,
198 response, and recovery. A place for our heavy equipment, fire engine, ambulance etc.
199 would also be housed up in this area above the 100' mark to ensure that all this
200 equipment's would be available for post emergencies.
Kodiak Island Borough, Alaska
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Inn...
Resolution No. FY2024-27
Page 4 of 15
Page 13 of 54
AGENDA ITEM #2.a.
201 There would be several areas along with offices and a conference/meeting room that
202 could house other much needed facilities for the community. A Teen and Youth Center,
203 one or two studio apartments, a Rural Training Center and an entrance or outdoor area
204 that would pay proper tribute to our men in uniform for their dedicated service to our
205 country is something that is valued by our community. A memorial would be a welcome
206 addition in recognition of their bravery, selflessness, and commitment to the defense of our
207 nation.
208 A Teen and Youth Center where Ouzinkie's youth would have a fun and safe place to
209 socialize, exercise and have appositive interaction with peers and adults affiliated with the
210 center. The Center could bring a strong character and realize our youth's development,
211 healthy living, and social responsibility. The mission would be to provide a safe, enjoyable
212 environment where teenagers can engage in beneficial educational, and leisure -time
213 activities.
214 Part of the building could also be used as a Rural Training Center with the conference and
215 meeting room serving a dual purpose as training and meeting rooms. Having a designated
216 area for classes would broaden the opportunities available for both agency programs and
217 actual opportunities for residents that have employment skill needs that are currently
218 unmet. The intent would be to keep the scale of operation flexible and small in size so as to
219 be able to adapt to changing vocation skill needs as well as providing focused individual
220 instruction.
221 • Phase One -Design: $550,000
222 This would include design of the building which would include but not be limited to
223 the administration offices, meeting and conference area/training areas, library,
224 apartments, supply and maintenance/parts area.
225 • Phase Two -Construction: $4,257,500
226 Moving of the office into temporary quarters. The City of Ouzinkie has a lot where a
227 temporary office trailer could go while this construction is underway. It is believed
228 that if construction starts in the early spring, then by late fall the project would be
229 completed. This phase would also include site preparation and construction.
230 16. The City of Ouzinkie Electrical Distribution System
231 $2,500,000
232 Age and exposure to salt -water atmosphere have revealed that all of the transformers on
233 Ouzinkie's electric distribution system have rusted out. When the lids rust through, water
234 gets into the transformers causing extreme loads, short circuits, and the potential, (due to
235 buildup of gas pressure), of explosion with consequences to individuals and property in the
236 vicinity. It is expected that this preventive renovation will reveal other situations such as
237 individual poles that need replacement and rerouting of transmission lines. A highly critical
238 and significant section of Ouzinkie's power is connected to the hydroelectric plant. This
239 connection is by direct burial concentric neutral 7,200 -volt power lines. This quality of cable
240 as it was installed has been estimated by Jim Develin, KEA's Electrical Engineer to have
241 exceeded its normal expected life and is subject to failure any day. The western section of
242 town is serviced by the same type of cable and there is no possibility of delivering power to
243 these residents, temporary or otherwise when this failure occurs.
244 /t is desired that this project be engineered, and project managed through The Alaska
245 Energy Authority.
246
247 17. The City of Ouzinkie Renewable Energy Projects
Kodiak Island Borough, Alaska Resolution No. FY2024-27
Paqe 5 of 15
Page 14 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
248 A. Alternative Energy Wind Generation $2,500,000
249 Ouzinkie has utilized alternative energy with the use of hydro power for 20
250 years. This has worked well for the community, and has resulted in a large
251 saving of fuel vs. diesel generation. The community wishes to enhance this
252 component of our generation facilities with the addition of wind power. Spruce
253 Island is located in an area with high potential for wind generation. The project
254 is expected to take four phases to be incorporated into the present grid.
255 Construction Phase
256 Phase One: Analyze the two years of wind data collected in the process of site
257 investigation for the new airport. Expected expenses $10,000
258 Phase Two: Construct a site-specific data collection wind tower for sizing of
259 wind generation tower and generator. An engineering feasibility study to the applicable
260 aspects of connecting solar to the present system. Running in tandem with diesel and
261 hydroelectric. Expected expense $100,000
262 Phase Three: Construct and install generator and tower of estimated size of
263 200KW. Expected expense $2,090,000
264 Phase Four: Install power control equipment to integrate equipment into the
265 present grid utilizing the hydro/diesel combination of generation.
266 Expected expense $100,000
267 Phase Five: Design and engineering, installation of SCADA computer controls and
268 programmable logic controllers. Expected expense $200,000
269 The creation of green alternative energy is an increasingly promising solution to multiple
270 challenges. Sustainable business and energy independence are keys to our economic
271 revitalization. Solar could be part of the answer to affordable power for housing and
272 business that will help offset the cost of electricity by diesel powered generators.
273 B. Alternative Energy Solar Panels
274 $7,750,000
275 Ouzinkie has an ideal area at the old Ouzinkie Airport for development of a solar farm that
276 would power much of the energy needs of the community. With the need to cut our
277 dependence on diesel fuel the community is looking at various alternative energy projects.
278 Having a hydroelectric system has helped with the consumption of diesel, additional
279 alternative energy working in tandem with the hydro would make Ouzinkie completely
280 independent of diesel.
281 The tremendous growth in the U.S. solar industry is helping to pave the way to a cleaner,
282 more sustainable energy future. Over the past few years, the cost of a solar energy system
283 has dropped significantly — helping to give more families and businesses access to
284 affordable, clean energy.
285 When converted to thermal energy, solar energy can be used to heat water for use in
286 homes and building; to heat spaces inside homes, greenhouses, and other buildings.
287 Solar energy can be converted to electricity by Photovoltaic (PV devices or solar cells).
288 Solar cells change sunlight directly into electricity. Individual PV cells are grouped into
289 panels and arrays of panels that can be used in a wide variety of systems that power single
290 homes, to power plants.
Kodiak Island Borough, Alaska Resolution No. FY2024-27
Page 6 of 15
Page 15 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
291
292 18. The City of Ouzinkie Landfill Storage Facility
293 $60,000
294 Landfills are excavated or engineered sites where non -liquid hazardous waste is deposited
295 for final disposal and covered. The construction of a Storage Facility here is intended to
296 protect human health and the environment from the risks posed by waste. The containment
297 building will be 60'x80' completely enclosed, self-supporting structure (i.e., have four walls,
298 a roof, and a floor) used to store or treat non -containerized hazardous waste. Since
299 landfills are permanent disposal sites and are closed with waste in place installing such a
300 structure will enhance health and safety for operators maintaining the islands dump station.
301 The fabrication of covered storage will extend the life of this landfill a benefit for limited
302 island area.
303
304 19. The City of Ouzinkie Equipment Replacement
305 $1,100,000
306 The city's equipment is aging out and needs to be replaced. Heavy equipment has
307 been compromised due to being open to the salt air and other elements. A storage
308 building for housing heavy equipment for both the Native Village of Ouzinkie and
309 the City of Ouzinkie has been funded and is in its initial stages.
310
311 • Fork Life $250,000
312 • Dump Truck $200,000
313 • Caterpillar Excavator 320 $300,000
314 • Sewage Pumping Truck $200,000
315 • Backhoe/Loader $150,000
316
317 20. The City of Ouzinkie Municipal Port Facility Upgrades
318 • Zinc Replacement for Harbor and Dock $50,000
319 The Ouzinkie Boat Harbor was competed in 2001 and the dock was completed in 2012 and
320 the zinc anodes on the metal pilings and dock face are in need of replacement due to
321 electrolysis. Cathodic protection is a technique used to control the corrosion of metal
322 surface. The simplest method to apply cathodic protection is by connecting the metal to be
323 protected with another more easily corroded metal to act as the anode. Zinc is one of the
324 metals commonly used as anodes. Due to the zincs being welded on means that drivers
325 will have to replace these zincs on both the harbor and dock.
326 • Electrical Upgrade and Water to Boat Harbor $50,000
327 The Ouzinkie Boat Harbor, when it was built, was designed with very limited electrical
328 outlets. One group of 4 plug -ins at the end of each float. Our harbor is full and the need for
329 electricity by the vessels has outgrown what is available. An upgrade to existing meter
330 bases and additional bases to be put in at intervals along the three fingers to get rid of the
331 multitude of electrical cords being used by individual users.
332 The Harbor also does not have access to any fresh water. The installation of water lines to
333 the three floats would eliminate the need to haul water from the central part of town. Fresh
334 water would allow for local access to boats and skiffs that moor at the Harbor and for
Kodiak Island Borough, Alaska
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
Resolution No. FY2024-27
Page 7 of 15
Page 16 of 54
AGENDA ITEM #2.a.
335 transients that are overnighting and traveling through to other destinations and fishing
336 grounds.
337 Access Ramp at Harbor
338 Engineering $1,500,000
339 Engineering will provide background and engineering design guidance for the Boat Harbor
340 Vehicle Access Ramp. The study will address the needs of the project, identification and
341 evaluation of available data that can be used to describe environmental (earth, water and
342 weather) conditions affect the land above the harbor and develop a detailed design and
343 construction cost estimate based on the environmental concerns.
344 Construction $1,500,000
345 Ouzinkie has a boat harbor breakwater for the protection of marine vessels and skiffs in the
346 harbor area. Use of this facility has restrictions for commercial fishermen, skiff owners, and
347 tourism vessels. Currently, access is restricted to a narrow gravel road from Spruce Street
348 that goes down a hill to a narrow 10'x3' wooden ramp that accesses the harbor grated
349 walkway ramp. It does not allow for skiff to car/4-wheeler loading access. You have to
350 unload your freight from your boat by hand, into carts, hand cart the freight up the grated
351 ramp, up the wooden ramp, up a one lane S shaped gravel route to your vehicle. A vehicle
352 accessible ramp would allow for skiff to car unloading. Handicap/Elder accessibility is
353 almost non-existent.
354 • Fish Cleaning Station $50,000
355 Stainless steel will not rust or corrode, making them ideal for coastal use: the cleaning
356 station design is for unsupervised operation in publicly accessible areas. It could
357 accommodate multiple users at a time and can be integrated with water. Water access can
358 be done with one -inch HTP pipe running across access ramp with hose bib on end. The
359 disposal of fish waste will benefit Spruce Island Farms our food project which composts for
360 rich soil. The fish cleaning station will have signs that list the rules and regulations for use.
361 • Public Restrooms $170,000
362 For comfort and convenience of community members and visitors to the village we would
363 like to install a concrete slab enclosed restroom facility at the Ouzinkie Boat Harbor and at
364 the new Municipal Dock. Currently the closest public facilities for the boat harbor are half a
365 mile away, at the Tribal Cultural Center. There is a septic station at the start of the harbor
366 road, it would not take much effort to construct and install such a facility.
367 With Ouzinkie now being on the Alaska Marine Highway System people are waiting at the
368 dock area where there are no restroom facilities available. This could be incorporated with
369 a shelter for protection against inclement weather while waiting for the ferry. As part of the
370 economic development of the municipal dock this public restroom facility would enhance
371 the other projects that are planned for future development.
372
373 21. The City of Ouzinkie Community Road's Upgrade -Construction
374 $3,275,000
375 The City of Ouzinkie has not had available, since original construction in the 1970's,
376 material for maintenance and repair of the Village roads. Road improvements would
377 include road shaping and crowning, drainage and culvert improvements, chip seal
378 surfacing and dust control. The road improvements would improve vehicle and pedestrian
379 safety and eliminate destructive potholes.
Kodiak Island Borough, Alaska
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
Resolution No. FY2024-27
Page 8 of 15
Page 17 of 54
AGENDA ITEM #2.a.
380 Recent construction of a sewer project in the village has required digging up the village
381 streets, causing damage that is not restorable under the constraints of the village and
382 water project budget. The net effect is excess wear and damage to not only the village
383 utility vehicles such as the dump truck, electric utility vehicles, fire and ambulance services,
384 but to the vehicles utilized by residents in the normal pursuit of personal or vocational
385 business. Excess wear and damage have been noted on the grader used for snow
386 removal. Repair of this item requires sending eh equipment out of the village on a landing
387 craft at a considerable expense for repair. Individual residents can only afford to absorb
388 their own personal losses.
389 There was a planned airport construction project in Ouzinkie in 2008; the project has
390 provided the opportunity for tremendous cost -savings for small local projects that would
391 otherwise not be practical from a construction mobilization standpoint. Throughout Alaska,
392 agencies and communities look for these cooperating project opportunities. Ouzinkie
393 understands this is an opportunity to focus their efforts.
394
395 22. The City of Ouzinkie Public Facilities Development
396 • Boardwalk Repair/Replacement $100,000
397 Ouzinkie's wooden boardwalk is an identifying feature of the community and provides for a
398 scenic stroll along our coastline. Unfortunately, City budget constraints have not allowed
399 for proper routine maintenance and our boardwalk is in desperate need of extensive
400 repairs or a complete replacement. Ouzinkie residents frequently travel the boardwalk to
401 get from one end of the community to the other and it is highlight of our village tour.
402 Ensuing its continued presence in our community is a priority for many Ouzinkie residents.
403 • Community Development $200,000
404 The City of Ouzinkie has many trails and recreational spots that have been in existence for
405 time immemorial and should be taken care of especially that Ouzinkie is working on
406 drawing tourism to the village. Scenic outlook viewing shelters, fire pits, benches, outdoor
407 toilet facilities, trail maintenance, small bridges, and camping facilities would contribute to
408 the development of this tourism and economic development. In keeping with tourism, a
409 water -front area of shops downtown would be an attraction to tourists where they could buy
410 form local artists.
411 The community needs an outdoor recreation site. A place where activities such as a
412 baseball, volleyball, basketball, tennis, track, etc. can be conducted. The facility could also
413 include a camping and barbecue area for outdoor community events and tourist events.
414 • Upgrade to Freezer Building/Fish Processing Facility $350,000
415 The existence of our community's freezer building/fish processing facility represents a
416 great deal of opportunity and un -utilized potential. The primary reason for its non -
417 operational status is that the cost of operation is too high, and the village cannot afford its
418 associated costs. Some modifications are required to update the facility and maximize its
419 job -creating and income -earning potential, such as a ramp and an easy access point for
420 unloading fish and finished products.
421 However, the primary issue which must be addressed is lowering the costs of utilities.
422 Having the facility linked up with solar panels, wind turbines, etc. would lower the cost of
423 the round-the-clock power consumption required to keep the catch cold and allow the
424 village to realize a profit from its efforts. This would also catch cold and allow the village to
425 realize a profit from its efforts. This would also facilitate the community in its ability to
Kodiak Island Borough, Alaska Resolution No. FY2024-27
Page 9 of 15
Page 18 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
426 "brand" itself, selling an array of top-quality, locally caught fish to a wide range of
427 consumers.
428
429 23. The City of Port Lions Disaster Emergency Preparedness
430 $50,000.00
431 The City of Port Lions has an active Volunteer Fire Department and Village Response
432 Team, both of which consist of fairly new members who are acquiring the necessary
433 training to be effective First Responders. We also have a strong Public Safety Department
434 (Village Public Safety Officer) and a community health clinic.
435 We have used our available resources to properly outfit our Volunteer Firefighters, but we
436 still have a need for additional gear.
437 The Quonset in which our fire truck is housed lacks heat and insulation, so we are not able
438 to keep water in the truck tank in the winter months. We must rely on hydrants and hoses
439 during the cold months. We would like to use foam insulation and install a waste oil burning
440 heater in the Quonset garage. Our firetruck could then be used all year round.
441 Our community has received tsunami warning sirens through SOA and NOAA funding.
442 However, one of the sirens is not connected to permanent electricity. We must contract
443 with the local electric provider to get it installed.
444 We also need to obtain some basic disaster preparedness survival items such as
445 emergency blankets, cots, dehydrated meals and a portable water purification system.
446
447 24. Demolition and Replacement of the Port Lions City shop
448 $750,000.00
449 The City of Port Lions Public Works Department provides essential services (water and
450 sewer, refuse collection, fuel delivery) to the approximately 175 residents of our off-road
451 Kodiak community.
452 The Public Works Department operates out of our city shop facility, which is at least 45
453 years old and is deteriorating rapidly. The interior is unfinished, unheated, with two small
454 equipment bays (one has a concrete floor, and one has a dirt floor), and no running water
455 or restroom.
456 The shop facility is crucial to all City of Port Lions functions, as it is our only enclosed area
457 for equipment repair and maintenance, supply and tool dry storage, fabrication shop for
458 small welding projects, staging area for water and sewer projects.
459 This project is our top priority for FY24. With funding a Quonset style building with running
460 water, a waste -oil burning heater, and a restroom will replace the existing structure.
461
462 25. City of Port Lions Streets and Roads Resurfacing
463 $2,500,000.00
464 Port Lions is a small off-road community in the Kodiak Archipelago. The Port Lions Road
465 system spans approximately seven (7) miles and is vital to our community for commuting
466 to work, school, church, the airstrip (located 2 miles from the Village), boat harbor (located
Kodiak Island Borough, Alaska
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
Resolution -No. FY2024-27
Page 10 of 15
Page 19 of 54
AGENDA ITEM #2.a.
467 1 miles from the village), ferry dock (located 3 miles from the village), evacuation to high
468 ground in the event of a tsunami. We have no store, so access to daily planes, the boat
469 harbor and ferry dock is critical for our residents to receive groceries, fuel, and other
470 necessities. We have approximately five (5) miles of State of Alaska road and two (2) miles
471 of residential roads in Port Lions, but the State Road has never been resurfaced (even
472 though unpaved roads are usually resurfaced every 10-15 years on average).
473 Driving conditions have become hazardous in area due to lack of guard railings, bare
474 surface, washed out culverts, and damaged signage. The City of Port Lions does not have
475 funding to support a project that would resurface the five miles of State Road in our village.
476 We struggle to perform regular maintenance on the two (2) miles of residential routes that
477 we own. This project would ensure community member's safe travel to and from work,
478 school, or during an emergency mass evacuation.
479 The funds we receive from the SOA in "revenue sharing" (Community Assistance Program)
480 have steadily decreased for many years whiles, at the same time, the Alaska Municipal
481 League Joint Insurance Association has continually raised our premiums. The result is that
482 over half of our revenue sharing funds now go to paying for our annual insurance. The
483 remainder is split between supporting our Library, our public safety program, and our
484 streets and roads department.
485
486 26. The City of Port Lions Equipment Fleet
487 $65,000.00
488 The City of Port Lions operates an aging fleet of equipment that includes a small motor
489 grader, a small backhoe, and a small bulldozer. We also own a 2013 front end loader,
490 excavator, garbage truck, and shop truck.
491 All of the aging equipment is in very poor condition. The public works crew spends a
492 number of hours each year working to keep them running.
493 We own and operate a State of Alaska permitted landfill. In order to stay in compliance with
494 the permit, we must regularly move and cover refuse. We also must regularly move ash
495 from our landfill burn box. These activities require the use of a small, reliable bulldozer. Our
496 current bulldozer does not start without pouring gasoline in the starter, the door does not
497 close, and the floor is rotting (we have attached a piece of plywood over the hole for safety
498 purposes).
499 With funding, we would work to procure used or modestly priced heavy equipment to fulfill
500 our community's needs.
501
502 27. Heating and Insulation Installation for the City of Port Lions Fire Station
503 $35,000.00
504 The City of Port Lions fire station houses the fire truck and volunteer fire department
505 equipment. The fire truck bay does not have adequate insulation or heating for winter
506 weather conditions. Prolonged cold temperatures create freezing conditions within the
507 building which can cause the water inside the fire truck to freeze. During winter months, we
508 do not fill the firetruck with water, rather the Volunteer Fire Department has been trained to
509 use hydrants and hoses instead.
Kodiak Island Borough, Alaska Resolution No. FY2024-27
Pape 11 of 15
Page 20 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
510 We also have a small Code Red suppression unit that can be towed to buildings that are too
511 far away from a hydrant. But, in spite of our efforts to be prepared to respond to fires without
512 a fire truck, our community is still at risk for loss of property or life in the event of a fire.
513 The majority of Port Lions residents rely on wood stoves during the winter months. Our off -
514 road community is very spread out, and many structures are not in close proximity to a fire
515 hydrant. Our Code Red unit works well, but it is too small to be relied upon to suppress any
516 large fire.
517 With funding, the fire truck bay would be insulated with spray foam, and adequate heating
518 would be installed in the fire station to allow the fire truck to be filled and ready to respond to
519 emergency situations.
520
521 28. The City of Port Lions Harbor Crane
522 $75,000.00
523 The community of Port Lions is a small fishing community on Kodiak Island. The harbor
524 facilities offer a small range of commodities such as pot storage, harbor storage, and a
525 gridiron. The hoist for the harbor is aged out, broken, and would cost more to repair than
526 replace it. The lack of a hoist greatly impacts our community members who fish
527 commercially, transport heavy cargo or fuel, or need to remove equipment from their vessels
528 for repairs. The crane is also used to move freight off landing crafts and barges. Most
529 importantly drums of fuel and pallets of groceries coming into the village.
530 With funding, we would be able to remove and replace the broken crane with a reliable one
531 that would serve the community's needs for decades.
532
533 29. The City of Port Lions Water Distribution Replacement and Expansion
534 $8,000,000.00
535 The original water and sewer distribution system for our community was built after the 1964
536 Good Friday earthquake and tsunami forced the displaced residents of Afognak to relocate
537 in what is now known as Port Lions.
538 In 1994 a new system was installed. However, the contractor did not complete the job
539 correctly. Many homes were not connected to the new system, and many homes were
540 connected incorrectly.
541 The system is now considered aged out because it is over 25 years old. The City of Port
542 lions Public Works crew consistently has a list of leaks and blockages to repair. In some
543 places the system is beyond repair. We are consistently over budget for our water and sewer
544 utility due to the unexpected expense of purchasing parts and paying our crew to repair and
545 replace sections of the distribution system. The outdated system drastically hinders
546 community expansion efforts and has become financially crippling to the community
547 members when water mains burst. We are working closely with the Alaska Native Tribal
548 Health Consortium (ANTHC) for a replacement project to be included in their funding pipeline
549 as soon as possible. ANTHC leverages funding from multiple sources, including the State of
550 Alaska, to get projects funded as quickly as possible and we are committed to fully
551 participating in their process. We have also received a generous donation from the NVPL
552 (Native Village of Port Lions) in the amount of $250,000.
Kodiak Island Borough, Alaska Resolution No. FY2024-27
Page 12 of 15
Page 21 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
553 We would be grateful for any support from our partners to ensure state and federal funding
554 is allocated to keeping important rural Alaskan water and sewer projects such as ours
555 moving forward as quickly as possible.
556
557 30. The City of Port Lions Youth Activity Program
558 $20,000.00
559 Port Lions has identified a need for safe regularly scheduled events and activities for the
560 youth of our community. Our community has shown and proved that success shortly
561 follows graduates of all ages of our preschool, kindergarten, elementary, middle school,
562 and high school levels. We are seeking funding to instill a youth activity program in
563 partnership with popular local entities that will enable our youth to flourish. Indoor and
564 outdoor winter and summer activities as well as activities reflecting the school districts
565 calendar will be our base focus.
566
567 31. The City of Port Lions Harbor Building
568 $250,000.00
569 The City of Port Lions has identified a need to demolish and replace the Port Lions harbor
570 building. The building is beyond repair and the cost to repair it nears the cost to replace it.
571 The harbor building is important to our community as we are a strong and popular fishing
572 community. We hope to benefit and support our fishing community by providing a space for
573 our harbor master to shelter and complete their work while caring for the facility. Fishing
574 vessels would also be allowed a spacious dry storage locker for their equipment and career
575 needs.
MR
577 32. The City of Port Lions Energy Independence
578 $250,000.00
579 The City of Port Lions would like to create energy independence for our community. As a
580 part of the Kodiak Electric Association Coop, we are already part of an energy efficient,
581 renewable energy electricity grid. However, we are concerned about the rising cost of
582 heating oil for our residents, especially our elders.
583
584 We would like to partner with the Native Village of Port Lions and the State of Alaska to
585 leverage resources that will help us complete a comprehensive community energy plan (with
586 audit and/or feasibility study).
587
588 Building on community energy planning that began in 2014, and using US Department of
589 Energy resources that are available to federally recognized Tribes, we propose a total budget
590 of approximately $250,000 to accomplish this planning effort.
591
592 33. The City of Port Lions Airport Expansion Project
593 $25,000,000.00
594 The DOT & PF and FAA have identified multiple function, operational and safety needs at
595 the Port Lions Airport through previous engineering analysis and scoping efforts. The
596 purpose of the project is to provide safety improvements to the Port Lions Airport and
Kodiak Island Borough, Alaska Resolution No. FY2024-27
Page 13 of 15
Page 22 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
597 associated facilities that would address these deficiencies with the objective that the airport
598 would continue to fulfill its role as a community class airport.
599 The Alaska Department of Transportation and Public Facilities (DOT&PF) proposes to
600 design and construct improvements to the Port Lions Airport. The project would realign,
601 lengthen and widen the existing airport to meet Federal Aviation Administration (FAA)
602 guidelines to ensure continued service as a safe and efficient facility.
603 The airport is vital to the City of Port Lions as it serves as one of the only forms of
604 transportation in and out of the village during the winter months. Residents in the village
605 rely on flights in and out of the village for medical travel, grocery shopping and other
606 necessary appointments.
607
608 34. Kodiak Island Borough Bells Flats Commercial Truck Route Road Improvements
609
610 $10,475,000
611 This project will improve an existing circuit of roads in the Womens Bay area of the Kodiak
612 Road System. The roads included in this project are traveled by commercial trucks
613 transporting product from a gravel extraction site on Middle Bay Drive which produces the
614 bulk of the gravel materials for concrete and asphalt production in the Kodiak community.
615 It is estimated that this site can continue to produce a significant supply of gravel until at
616 least the year 2040. These roads also support approximately 350 residents and other
617 small business operations. A traffic pattern utilizing this loop of roads has been established
618 to minimize collision potential. Empty gravel hauling trucks enter the gravel extraction site
619 at one location and exit at a separate location, allowing the trucks to travel one-way along
620 the circuitous path. This project will preserve improve road surfaces by reconstructing
621 approximately three (3) miles of roadway including Sargent Creek Road, Salmonberry
622 Drive, Middle Bay Drive, and Bells Flats Road in the Bells Flats Subdivision approximately
623 eight miles south of the City of Kodiak. These routes all link together and are the main loop
624 through the Women's Bay Area. Reconstruction of the Sargent Creek Road will begin at
625 Rezanof Drive and extends to the intersection of Bells Flat Rd. continuing from the
626 intersection of Salmonberry Dr to the end of Middle Bay Drive (approximately 2 miles of
627 paved road surface). The intersection of Bells Flat Road and Sargent Creed Rd, including
628 all of Salmonberry Drive, back to the intersection Bells Flat Rd to Middle Bay Dr will also be
629 reconstructed (approximately 1 mile of gravel/RAP road surface). Existing pavement will be
630 milled and repaved, RAP surface areas will be paved, and subsurface improvements to be
631 completed on portions of the project as well as 8 culvert replacements. Sargent Creek
632 road, included in this project, is the single road for entry into and exit from the subdivision,
633 thus connecting all residents of the subdivision with goods and services such as medical,
634 educational, travel (airport and Alaska Marine Highway), grocery, home goods, repair, etc.
635 in the greater Kodiak city area.
636
637 35. Kodiak Island Borough Pedestrian Pathways to North Star Elementary School
638
639 $2,000,000
640 This project will provide safe pedestrian access to an elementary school located atop a hill
641 and surrounded by residential neighborhoods without sidewalks along the narrow unpaved
642 roads. It also connects to a pedestrian/bike path along an arterial road that is popular
Kodiak Island Borough, Alaska Resolution No. FY2024-27
Page 14 of 15
Page 23 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
643 among residents and visitors for commuting and recreational use, and a recreational trail
644 that follows a nearby creek.
645 A separated five -foot -wide pedestrian gravel pathway will be constructed along two
646 residential roads leading to an elementary school. A separated pedestrian pathway
647 addresses the risk for vehicle -pedestrian interactions, particularly when roads are snow
648 and/or ice laden, by constructing a gravel pathway outside of the roadway. The dangerous
649 walking conditions during winter have necessitated a hazardous bus route for students
650 living within one mile of the school, provided by the Kodiak Island Borough School District.
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
ADOPTED BY THE PLANNING AND ZONING COMMISSION OF THE KODIAK ISLAND
BOROUGH
THIS September 20, 2023
ATTEST:
Bronwyn Currie, Permit Technician
Kodiak Island Borough, Alaska
KODIAK ISLAND BOROUGH
A, L L5rDA4-
Alan Schmitt, Chair
Resolution No. FY2024-27
Page 15 of 15
Page 24 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
CITY OF KODIAK
RESOLUTION NUMBER 2023-04
A RESOLUTION OF THE COUNCIL OF THE CITY OF KODIAK ADOPTING A
FY2024 STATE CAPITAL IMPROVEMENT PROGRAM LIST
WHEREAS, the City of Kodiak uses a Capital Improvements Program planning process to
identify the capital improvement project needs of the community: and
WHEREAS, this identification and planning process plays a vital role in directing the
City's administration and is utilized as a long-range planning and policy setting tool for City
infrastructure maintenance and enhancement: and
WHEREAS, the City of Kodiak is committed to paying its way to the greatest extent
possible. but the cost of some of the City's capital project needs are greater than the resources
available locally; and
WHEREAS, the Kodiak City Council has identified and prioritized capital improvement
projects for submission to the Alaska State Legislature and Governor for funding consideration
due to their significance and/or magnitude; and
WHEREAS, the City of Kodiak relies upon the State of Alaska's legislative and matching
grant programs and the Community Assistance Program to continue to keep its economy strong.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Kodiak, Alaska,
that the following infrastructure replacementlimprovement projects and issues are considered of
primary importance and are hereby adopted as the City of Kodiak's FY2024 State capital
improvement project and issues list:
1. St. Herman Harbor Infrastructure Replacement. (Phase I & H) $16,000,000
(Phase III & IV) $40,000,000
St_ Herman Harbor (SHH) was built by the State of Alaska in 1982 and has been a vital facility
for Kodiak's large and diverse commercial fishing fleet for over 40 years. The State of Alaska
turned over all state owned facilities in St. Herman Harbor to the City of Kodiak in 1999. The
facility provides safe moorage for more than 400 vessels from all over Alaska and the West
Coast. With the exception of a few minor upgrades over the years, the original float system is
beyond its useful life and is in critical need of replacement.
The proposed project would result in the reconstruction of St. Herman Harbor with the
replacement of most of its float system in four phases. Currently. the harbor has been losing
one dock per year due to aging and the saltwater elements. A dock loss results in 2 vessel berths
along with the revenue generated for the harbor. This rate of failure is likely to increase in
future years as the existing docks further deteriorate. The latest inspection report shows many
portions of the facility are in very poor condition. The forty -year old float systems suffer from
Resolution No. 2023-04
Page 1 of 4
Page 25 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
failing concrete, rotting walers and bullrails, and an outdated electrical system. These floats
contain electrical pedestals, fire suppression water lines, safety ladders and supply water.
In 2022, the City contracted with PND Engineers, Inc. (PND) to prepare a St. Herman Harbor
Planning and Scoping Report that includes concept harbor layouts, cost estimates and
construction phasing recommendations. The City is requesting $16 million to complete the
first two phases. Phases III & IV estimated project development cost is approximately
$40,000,000.
Modernizing and expanding our port infrastructure is critical to remaining competitive in
maintaining our status as an important commercial fishing community. Waterfront facilities
and marine infrastructure are a critical element to the City of Kodiak and the State of Alaska,
supporting a large portion of the City's commerce, industry, transportation, and recreational
needs.
2. Waste Water Treatment Plant Facility $1,900,000
The City of Kodiak Treatment Plant operates under an Alaska Department of Environmental
Conservation (ADEC) APDES permit. The first phase of a larger project to upgrade the City
of Kodiak Waste Water Treatment Plant was to evaluate the facility for immediate system
needs. The last major maintenance upgrade to the facility was in 1999. The condition and
evaluation assessment included all major components within the plant interior and exterior, the
out -buildings and three aeration basins; including all mechanical equipment needs. Alaska
Pollutant Discharge Elimination System (APDES) permitting requirements were included
during this assessment. Included in the facility rebuild assessment is the supervisory control
and data acquisition (SCADA) system to interface with the 34 sewer lift station pumps and
waste treatment at the facility. This facility with its labyrinth of connecting sewer lines, directly
serves 2667 City of Kodiak and Kodiak Borough households including commercial businesses.
The Treatment Plant also serves the U.S. Kodiak Coast Guard Base and the Pacific Spaceport
Complex indirectly with our certified laboratory testing and waste disposal; not to mention
NOAA vessels, the Alaska Marine Highway vessels and the expanding cruise ship industry
stopovers in our Kodiak Harbors.
The City of Kodiak is requesting Federal funding in the amount of $1.9M to begin design
efforts leading to the construction of this critical infrastructure Waste Water Treatment Plant
project that will support the wastewater needs of the community for the next twenty years.
3. New Fire Department Emergency Response Vehicle $2,350,000
The City of Kodiak has an important request to replace a critical need fire suppression vehicle,
the city's lone ladder truck. The current vehicle is twenty-three years old and the industry
standard requirements subject this aging ladder truck to complete inspection each year to
certify its continued use. This requires a U.L. certified inspection causing the city to prioritize
limited funding each year. The age of the apparatus also corresponds to increased maintenance
needs. Some of the systems built-in to the apparatus are no longer supported causing increased
difficulty and cost to maintain the apparatus in a `ready' state.
Resolution No. 2023-04
Page 2 of 4
Page 26 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
The primary purpose of this 105' foot ladder truck is used for fire suppression of the shoreside
seafood processor plants which have vehicle access from the upland side. The need to reach
out over the buildings or any other multi-level buildings provides critical suppression and
rescue capabilities when many lives are at risk. This unique vehicle also serves as the high -
angle rope rescue platform for emergency calls over vertical terrain.
4. Transportation Infrastructure Projects
$3,750,000
• Mill Bay Road Rehabilitation — $2,000,000
Bristol Engineering Services Company LLC has completed the City of Kodiak's Long
Range Transportation Plan, Mill Bay Road is the city's top priority. This project would
remove and replace existing 4 -inch asphalt pavement from the intersection of Upper Mill
Bay Road to Benny Benson Drive (approximately 1.4 miles or 7400' in length). Paved
width is 34 feet wide. This primary arterial city road provides access to schools, medical
services, food and goods supplies, and many other support businesses. The average daily
traffic volume is 7,680 vehicles per day.
• Mission Road Rehabilitation — $1,750,000
Mission Road is identified as another high priority road in the city. Perhaps one of the
earliest built road in Kodiak's history and a clear public priority. The pavement and
underground utilities is among the worst of the roads in the city. Reconstruct with
modification to create a one-way road section (including complete replacement of the road
bed to a depth of at least 3 feet) beginning at Erskine St and ending at intersection of
Ismailov and 12th (approximately 0.5 miles or 2600' in length). Project would
include new 6 -foot wide sidewalk located on the uphill side of the street, drainage
(presently there is no storm drainage infrastructure the entire length) and
lighting improvements to tie into existing facilities at both termini. Bed rock should be
anticipated on the uphill side of the road. Additional utility work anticipated by the City is
replacement of 1956 -era water and sanitary sewer mainlines (and service reconnects) for
the entire length. This work scope would be accomplished concurrent with the other work
but the cost is not included in this estimate. This urban major collector, experiences 1,610
to 2,330 vehicles per day.
FY 2024 City of Kodiak Supported State Issues:_
1. Requesting an increase of State funding for Community Jails.
2. Investments in infrastructure to address food security.
3. Support continued investment in Ports and Harbors.
4. Support Water and Wastewater State Revolving Fund Program and Loan Forgiveness
Resolution No. 2023-04
Page 3 of 4
Page 27 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
ATTEST:
CITY CL41tK
Resolution No. 2023-04
Page 4 of 4
AGENDA ITEM #2.a.
CITY OF KODIAK
l�j 01�/��� -
MAYOR
Adopted: February 13, 2023
Page 28 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
CITY OF KODIAK
RESOLUTION NUMBER 2023-07
A RESOLUTION OF THE COUNCIL OF THE CITY OF KODIAK AMENDING
RESOLUTION NO. 2023-05 ADOPTING THE FEDERAL FISCAL YEAR 2024 SUP-
PORTED FEDERAL ISSUES LIST AND FISCAL YEAR 2024 FEDERAL CAPITAL LIST
WHEREAS, the City of Kodiak uses a Capital Improvements Program planning process to
identify the capital needs of the community and
WHEREAS, this identification and planning process plays a vital role in directing the
City's administration and is utilized as a long-range planning and policy setting tool for City in-
frastructure maintenance and enhancement; and
WHEREAS, the City of Kodiak is committed to paying its way, to the greatest extent pos-
sible, but the cost of some of the City's capital project needs are greater than resources available
locally; and
WHEREAS, Kodiak City Council has identified capital project needs for submission to the
Alaska Congressional Delegation for funding consideration due to their significance and/or mag-
nitude; and
WHEREAS, changes may be required as to how capital funding contributions for smaller
communities like Kodiak, Alaska can be made at the Federal level; and
WHEREAS, the City of Kodiak faces several issues generated by Federal legislation or
rulemaking that are of importance to the City of Kodiak, Alaska, and which may adversely impact
life in Kodiak by placing undue burdens on those who work and live in the community.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Kodiak. Alaska,
that the following projects and issues are high priorities for the community and are hereby adopted
as the City of Kodiak Federal Fiscal Year 2024 supported federal issues list and Federal Fiscal
Year 2024 prioritized federal capital projects list:
FFY 2024 City of Kodiak Prioritized Federal Capital Proiects List
1. St. Herman Harbor Infrastructure Replacement. (Phase I & Ill) $1.6,000,000
(Phase III & IV) $40,000,000
St. Heenan Harbor (SHH) was built by the State of Alaska in 1982 and has been a vital facility
for Kodiak's large and diverse commercial fishing fleet for over 40 years. The State of Alaska
turned over all state owned facilities in St. Herman Harbor to the City of Kodiak in 1999. The
facility provides safe moorage for more than 400 vessels from all over Alaska and the West
Coast. With the exception of a few minor upgrades over the years, the original float system is
beyond its useful life and is in need of replacement.
Resolution No. 2023-07
Page 1 of 4
Page 29 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
The proposed project would result in the reconstruction of St. Herman Harbor with the replace-
ment of most of its float system in four phases. Currently, the harbor has been losing one dock
per year due to aging and the saltwater elements. A dock loss results in 2 vessel berths along
with the revenue generated for the harbor. This rate of failure is likely to increase in future
years as the existing docks further deteriorate. The latest inspection report shows many por-
tions of the facility are in very poor condition. The forty -year old float systems suffer from
failing concrete, rotting walers and bullrails, and an outdated electrical system. These floats
contain electrical pedestals, fire suppression water lines, safety ladders and supply potable wa-
ter.
In 2022, the City contracted with PND Engineers, Inc. (PND) to prepare a St. Heenan Harbor
Planning and Scoping Report that includes concept harbor layouts, cost estimates and con-
struction phasing recommendations. The City is requesting $16,000,000 to complete the first
two phases. Phases III & IV estimated project development cost is approximately $40,000,000.
Modernizing and expanding our port infrastructure is critical to remaining competitive in main-
taining our status as an important commercial fishing community. Waterfront facilities and
marine infrastructure are a critical element to the City of Kodiak and the State of Alaska, sup-
porting a large portion of the City's commerce, industry, transportation, and recreational needs.
2. Waste Water Treatment Plant Facility
$1,900,000
The City of Kodiak Treatment Plant operates under an Alaska Department of Environmental
Conservation (ADEC) APDES permit.The first phase of a larger project to upgrade the City of
Kodiak Waste Water Treatment Plant was to evaluate the facility for immediate system needs.
The last major maintenance upgrade to the facility was in 1999. The condition and evaluation
assessment included all major components within the plant interior and exterior, the outbuild-
ings and three aeration basins; including all mechanical equipment needs. Alaska Pollutant
Discharge Elimination System (APDES) permitting requirements were included during this
assessment. Included in the facility rebuild assessment is the supervisory control and data ac-
quisition (SCADA) system to interface with the 34 sewer lift station pumps and waste treat-
ment at the facility. This facility with its labyrinth of connecting sewer lines, directly serves
2667 City of Kodiak and Kodiak Borough households including commercial businesses. The
Treatment Plant also serves the U.S. Kodiak Coast Guard Base and the Pacific Spaceport Com-
plex indirectly with our certified laboratory testing and waste disposal; not to mention NOAA
vessels, the Alaska Marine Highway vessels and the expanding cruise ship industry stopovers
in our Kodiak Harbors.
The City of Kodiak is requesting Federal funding in the amount of $1.9M to begin design
efforts leading to the construction of this critical infrastructure Waste Water Treatment Plant
project that will support the wastewater needs of the community for the next twenty years.
3. New Fire Department Emergency Response Vehicle $2,350,000
Resolution No. 2023-07
Page 2 0£4
Page 30 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
The City of Kodiak has an important request to replace a critical need fire suppression vehicle,
the city's Ione ladder truck. The current vehicle is twenty-three years old and the industry
standard requirements subject this aging ladder truck to complete inspection each year to cer-
tify its continued use. This requires a U.L. certified inspection causing the city to prioritize
limited funding each year. The age of the apparatus also corresponds to increased maintenance
needs. Some of the systems built-in to the apparatus are no longer supported causing increased
difficulty and cost to maintain the apparatus in a `ready' state.
The primary purpose of this 105' foot ladder truck is used for fire suppression of the shoreside
seafood processor plants which have vehicle access from the upland side. The need to reach
out over the buildings or any other multi-level buildings provides critical suppression and res-
cue capabilities when many lives are at risk. This unique vehicle also serves as the high -angle
rope rescue platform for emergency calls over vertical terrain.
4. Transportation Infrastructure Projects
$3,750,000
• Mill Bay Road Rehabilitation — $2,000,000
Bristol Engineering Services Company LLC has completed the City of Kodiak's Long
Range Transportation Plan. Mill Bay Road is the city's top priority. This project would
remove and replace existing 4 -inch asphalt pavement from the intersection of Upper Mill
Bay Road to Benny Benson Drive (approximately 1.4 miles or 7400' in length). Paved
width is 34 feet wide. This primary arterial city road provides access to schools, medical
services, food and goods supplies, and many other support businesses. The average daily
traffic volume is 7,680 vehicles per day.
• Mission Road Rehabilitation — $1,750,000
Mission Road is identified as another high priority road in the city. Perhaps one of the
earliest built road in Kodiak's history and a clear public priority. The pavement and under-
ground utilities is among the worst of the roads in the city. Reconstruct with modification
to create a one-way road section (including complete replacement ofthe road bed to a depth
of at .least 3 feet) beginning at Erskine St and ending at intersection of Ismallov and
12' (approximately 0.5 miles or 2600' in length). Project would include new 6 -foot wide
sidewalk located on the uphill side of the street, drainage (presently there is no storm drain-
age infrastructure the entire Iength) and lighting improvements to tie into existing facilities
at both termini. Bed rock should be anticipated on the uphill side of the road. Additional
utility work anticipated by the City is replacement of 1956 -era water and sanitary sewer
mainlines (and service reconnects) for the entire length. This work scope would be accom-
plished concurrent with the other work but the cost is not included in this estimate. This
urban major collector, experiences 1.610 to 2,330 vehicles per day.
FY 2024 City of Kodiak Supported Federal Issues:
Resolution No. 2023-07
Page 3 of 4
Page 31 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
• Authorization & appropriation for a General Investigation Study with the USACE for
future development of a deep -water turning basin and additional pier space in the Ko-
diak vicinity
• Defense Community Infrastructure Program for USCG communities
• Immigration Office in Kodiak
• Kodiak Fisheries Disaster — Local Government Fish Tax Reimbursement
ATTEST:
�taTLt�I iq-As
CITY CLOkK
Resolution No. 2023-07
Page 4 of 4
CITY OF KODIAK
MAYOR
Adopted: March 23, 2023
Page 32 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
CITY OF OUZINKIE
RESOLUTION 2023-07
CAPITAL IMPROVEMENT PROJECT LIST
A RESOLUTION OF THE OUZINKIE CITY COUNCIL APPROVING THE
REVISED FY 2024-2028 CAPITAL IMPROVEMENT PROJECT LIST
WHEREAS, the Ouzinkie City Council has evaluated the Capital Improvement needs of the
City of Ouzinkie and Developed a Capital Improvement Program List to address these needs;
and;
WHEREAS, the capital projects included in the attached Capital Improvement Program are
necessary, to improve the health, safety and well-being of the residents of Ouzinkie and;
NOW, THEREFORE BE IT RESOLVED that the attached Capital Improvement Program List
establishes the 2024-2028 Capital Improvement Project Priorities for Ouzinkie.
PASSED AND APPROVED by the Ouzinkie City Council on this 16th day of August, 2023.
SIGNED: &—.'q
Elijah Jackson, Mayor
ATTEST: C
Frei icori, Ofrk
RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 1 of 9
Page 33 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
CITY OF OUZINKIE
CAPITAL IMPROVEMENT PROJECT LIST
FY 2024-2028
1. Ouzinkie Municipal All -Purpose Complex $4,807,50
The Ouzinkie City Offices have been housed, for decades, in an old BIA territorial school
that is home to hundreds of bats, old lead paint, and an electrical and plumbing system
that needs rigorous upgrading. The City Office Building consists of: offices, a conference
room and meeting area, maintenance equipment rooms, supply rooms and a small
apartment. We estimate that it would be less expensive to build from the ground up.
Each year the community faces various emergencies like: earthquakes generating
tsunami warnings and evacuations; winter storms that knock out power, downpours
resulting in water facility breakdown to winter ice and summer potholes wrecking
equipment. New situations such as the pandemic we are in bringing to the fore the lack
of a physical location for locals seeking care, isolation and resources. This building with
its own generator for power, would have storage of water, food and sleeping areas and
would serve as a command center for the whole community and the surrounding areas
on Spruce Island. Being placed at or above the 100 -foot inundation zone would be for
the safety of the community, building, equipment, and employees. It would also ensure
that the community would have a post emergency safe haven.
The complex would enhance basic operations. Emergency management addresses
extreme events, across all hazards and through the phases of mitigation, preparedness,
response, and recovery. A place for our heavy equipment, fire engine, ambulance etc.
would also be housed up in this area above the 100' mark to ensure that all this equipment
would be available for post emergencies.
There would be several areas along with offices and a conference/ meeting room that
could house other much needed facilities for the community. A Teen and Youth Center,
one or two studio apartments, a Rural Training Center and an entrance or outdoor area
that would pay proper tribute to our men in uniform for their dedicated service to our
country is something that is valued by our community. A memorial would be a welcome
addition in recognition of their bravery, selflessness and commitment to the defense of
our nation.
A Teen and Youth Center where Ouzinkie's youth would have a fun and safe place to
socialize, exercise and have positive interaction with peers and adults affiliated with the
center. The Center could build strong character and realize our youth's development,
healthy living and social responsibility. The mission would be to provide a safe,
enjoyable environment where teenagers can engage in beneficial educational, and leisure -
time activities.
RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 2 of 9
Page 34 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
Part of the building could also be used as a Rural Training Center with the conference
and meeting room serving a dual purpose as training and meeting rooms. Having a
designated area for classes would broaden the opportunities available for both agency
programs and actual opportunities for residents that have employment skill needs that
are currently unmet. The intent would be to keep the scale of operation flexible and small
in size so as to be able to adapt to changing vocation skill needs as well as providing
focused individual instruction.
♦ Phase One -Design: $550,000
This would include design of the building which would include but not be limited
to the administrative offices, meeting and conference area/ training areas, library,
apartments, supply and maintenance/ parts area.
♦ Phase Two -Construction: $4,257,500
Moving of the office into temporary quarters. The City of Ouzinkie has a lot where
a temporary office trailer could go while this construction is underway.
It is believed that if construction starts in the early spring, then by late fall the
project would be completed. This phase would also include site preparation and
construction.
2. Electrical Distribution System
$2,500,000
Age and exposure to salt -water atmosphere have revealed that all of the transformers on
Ouzinkie's electric distribution system have rusted out. When the lids rust thru, water
gets into the transformer causing extreme loads, short circuits and the potential, (due to
buildup of gas pressure), of explosion with consequences to individuals and property in
the vicinity. It is expected that this preventive renovation will reveal other situations
such as individual poles that need replacement and rerouting of transmission lines. A
highly critical and significant section of Ouzinkie's power is connected to the
hydroelectric plant. This connection is by direct burial concentric neutral 7,200 -volt
power lines. This quality of cable as it was installed has been estimated by Jim Develin,
KEA's Electrical Engineer to have exceeded its normal expected life, and is subject to
failure any day. The western section of town is serviced by the same type cable and there
is no possibility of delivering power to these residents, temporary or otherwise when this
failure occurs.
It is desired that this project be engineered and project managed thru The Alaska Ener
Authority.
RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 3 of 9
Page 35 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
3. Renewable Energy Projects
A. Alternative Energy Wind Generation $2,500,000
Ouzinkie has utilized alternative energy with the use of hydro power for 20 years. This
has worked well for the community, and has resulted in a large saving of fuel vs. diesel
generation. The community wishes to enhance this component of our generation facilities
with the addition of wind power. Spruce Island is located in an area with high potential
for wind generation. The project is expected to take four phases to be incorporated into
the present grid.
Construction Phases
Phase One: Analyze the two years of wind data collected in the process of site
investigation for the new airport. Expected expenses $10,000
Phase Two: Construct a site-specific data collection wind tower for sizing of wind
generation tower and generator. An engineering feasibility study to the applicable
aspects of connecting solar to the present system. Running in tandem with diesel and
hydro -electric. Expected expense $100,000
Phase Three: Construct and install generator and tower of estimated size of 200 KW.
Expected expense $2,090,000
Phase Four: Install power control equipment to integrate equipment into the present
grid utilizing the hydro/diesel combination of generation.
Expected expense $100,000
Phase Five: Design and engineering, installation of SCADA computer controls and
programmable logic controllers. Expected expense $200,000
The creation of green alternative energy is an increasingly promising solution to multiple
challenges. Sustainable business and energy independence are keys to our economic
revitalization. Solar could be part of the answer to affordable power for housing and
business that will help offset the cost of electricity by diesel powered generators.
B. Alternative Energy Solar Panels $1,750,000
Ouzinkie has an ideal area at the old Ouzinkie Airport for development of a solar farm
that would power much of the energy needs of the community. With the need to cut our
dependence on diesel fuel the community is looking at various alternative energy
projects. Having a hydroelectric system has helped with the consumption of diesel,
additional alternative energy working in tandem with the hydro would make Ouzinkie
completely independent of diesel.
RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 4 of 9
Page 36 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
The tremendous growth in the U.S. solar industry is helping to pave the way to a cleaner,
more sustainable energy future. Over the past few years, the cost of a solar energy system
has dropped significantly -- helping to give more families and businesses access to
affordable, clean energy.
When converted to thermal energy, solar energy can be used to heat water for use in
homes and buildings; to heat spaces inside homes, greenhouses, and other buildings.
Solar energy can be converted to electricity by Photovoltaic (PV devices or solar cells).
Solar cells change sunlight directly into electricity. Individual PV cells are grouped into
panels and arrays of panels that can be used in a wide variety of systems that power
single homes, to power plants.
4. Landfill Storage Facility $60,000
Landfills are excavated or engineered sites where non -liquid hazardous waste is
deposited for final disposal and covered. The construction of a Storage Facility here is
intended to protect human health and the environment from the risks posed by waste.
The containment building will be 60' x 80' completely enclosed, self-supporting structure
(i.e., have four walls, a roof, and a floor) used to store or treat non -containerized
hazardous waste. Since landfills are permanent disposal sites and are closed with waste
in place installing such a structure will enhance health and safety for operators
maintaining the islands dump station. The fabrication of covered storage will extend the
life of this landfill a benefit for our limited island area.
5. Equipment Replacement $1,100,000
The city's equipment is aging out and needs to be replaced. Heavy equipment has been
compromised due to being open to the salt air and other elements. A storage building
for housing heavy equipment for both the Native Village of Ouzinkie and the City of
Ouzinkie has been funded and is in its initial stages.
1. Fork Lift $250,000
2. Dump Truck $200,000
3. Caterpillar Excavator 320 $300,000
4. Sewage Pumping Truck $200,000
5. Backhoe/Loader $150,000
6. Municipal Port Facility Upgrades
A. Zinc Replacement for Harbor and Dock $50,000
RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 5 of 9
Page 37 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
The Ouzinkie Boat Harbor was competed in 2001 and the dock was completed in 2012
and the zinc anodes on the metal pilings and dock face are in need of replacement due to
electrolysis. Cathodic protection is a technique used to control the corrosion of metal
surface. The simplest method to apply cathodic protection is by connecting the metal to
be protected with another more easily corroded metal to act as the anode. Zinc is one of
the metals commonly used as anodes. Due to the zincs being welded on means that
divers will have to replace these zincs on both the harbor and dock.
B. Electrical Upgrade and Water to Boat Harbor $50,000
The Ouzinkie Boat Harbor, when it was built, was designed with very limited electrical
outlets. One group of 4 plug -ins at the end of each float. Our harbor is full and the need
for electricity by the vessels has outgrown what is available. An upgrade to existing
meter bases and additional bases to be put in at intervals along the three fingers to get rid
of the multitude of electrical cords being used by individual users.
The Harbor also does not have access to any fresh water. The installation of water lines
to the three floats would eliminate the need to haul water from the central part of town.
Fresh water would allow for local access for the boats and skiffs that moor at the Harbor
and for transients that are overnighting and traveling through to other destinations and
fishing grounds.
C. Access Ramp at Harbor
Engineering $1,500,000
Engineering will provide background and engineering design guidance for the Boat
Harbor Vehicle Access Ramp. The study will address the needs of the project,
identification and evaluation of available data that can be used to describe environmental
(earth, water and weather) conditions affect the land above the harbor, and develop a
detailed design and construction cost estimate based on the environmental concerns.
Construction $1,500,000
Ouzinkie has a boat harbor breakwater for the protection of marine vessels and skiffs in
the harbor area. Use of this facility has restrictions for commercial fishermen, skiff
owners, and tourism vessels. Currently, access is restricted to a narrow gravel road from
Spruce Street that goes down a hill to a narrow 10' x 3' wooden ramp that accesses the
harbor grated walkway ramp. It does not allow for skiff to car/4-wheeler loading access.
You have to unload your freight from your boat by hand, into carts, hand cart the freight
up the grated ramp, up the wooden ramp, up a one lane S shaped gravel route to your
vehicle. A vehicle accessible ramp would allow for skiff to car unloading.
Handicap/Elder accessibility is almost non-existent.
D. Fish Cleaning Station
$50,000
RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 6 of 9
Page 38 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
Stainless steel will not rust or corrode, making them ideal for coastal use: the cleaning
station design is for unsupervised operation in publicly accessible areas. It could
accommodate multiple users at a time and can be integrated with water. Water access can
be done with one -inch HTP pipe running across access ramp with hose bib on end. The
disposal of fish waste will benefit Spruce Island Farms our food project which composts
for rich soil. The fish cleaning station will have signs that list the rules and regulations for
use.
E. Public Restrooms $170,000
For comfort and convenience of community members and visitors to the village we
would like to install a concrete slab enclosed restroom facility at the Ouzinkie Boat
Harbor and at the new Municipal Dock. Currently the closest public facilities for the boat
harbor are half a mile away; at the Tribal Cultural Center. There is a septic station at the
start of the harbor road, it would not take much effort to construct and install such a
facility.
With Ouzinkie now being on the Alaska Marine Highway System people are waiting at
the dock area where there are no restroom facilities available. This could be incorporated
with a shelter for protection against inclement weather while waiting for the ferry. As
part of the economic development of the municipal dock this public restroom facility
would enhance the other projects that are planned for future development.
7. Community Road's Upgrade - Construction $3,275,000
The City of Ouzinkie has not had available, since original construction in the 1970's,
material for maintenance and repair of the village roads. Road improvements would
include road shaping and crowning, drainage and culvert improvements, chip seal
surfacing and dust control. The road improvements would improve vehicle and
pedestrian safety and eliminate destructive potholes.
Recent construction of a sewer project in the village has required digging up the village
streets, causing damage that is not restorable under the constraints of the village sewer
and water project budget. The net effect is excess wear and damage to not only the village
utility vehicles such as the dump truck, electric utility vehicles, fire and ambulance
services, but to the vehicles utilized by residents in the normal pursuit of personal or
vocational business. Excess wear and damage have been noted on the grader used for
snow removal. Repair of this item requires sending the equipment out of the village on a
landing craft at considerable expense for repair. Individual residents can only afford to
absorb their own personal losses.
There was a planned airport construction project in Ouzinkie in 2008; the project has
provided the opportunity for tremendous cost -savings for small local projects that would
otherwise not be practical from a construction mobilization standpoint. Throughout
RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 7 of 9
Page 39 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
Alaska, agencies and communities look for these cooperating project opportunities.
Ouzinkie understands this is an opportunity to focus their efforts.
8. Alaska Marine Highway - Tustumena Replacement
Replacing the troubled Tustumena ferry, which was out of commission for nearly a year,
is the top priority of both the Marine Transportation Advisory Board, and the coastal
communities that the M/ V Tustumena serves.
The M/V Tustumena provides year-round service to Kodiak area, and journeys to the
Aleutian chain ten times each year, providing a critical transportation and tourism link
that affects the economies of each community served by this vessel. The ferry is also a
critical piece of infrastructure necessary for the viability of economic development in
rural coastal communities in the Gulf of Alaska. Recent vessel aging problems and repair
delays are well documented and have created significant, recurring service disruptions
and outages in the region. The M/ V Tustumena is at the top of the queue in the AMHS
Vessel Replacement Fund, and the legislature appropriated $10 million from this fund in
2013 for the design of a new ocean-going vessel to replace the M/ V Tustumena.
The Alaska Department of Transportation and Public Facilities has begun the design
process and estimates that it will take 18 months to complete with construction of the
new vessel costing as much as $210 million; since it will take another two to three years
to construct the new vessel and ready it for service, it is imperative to develop and
implement a strategy to ensure construction funding is in place by 2015 to allow an
immediate start of vessel construction.
9. Anton Larsen Bay Road Extension $8,000,000
Year around boat access to the Anton Larsen Bay Road has public safety and emergency
preparedness components as well as recreational and economic efficiency/ development
elements. The prevailing Kodiak weather pattern, especially in the winter, is from the
North East. This pattern often brings fog, rain, wind and large seas. During N.E. "blows'
vessels often cannot travel to Kodiak via Spruce Cape and frequently smaller bush
airplanes, and sometimes the U.S. Coast Guard, cannot fly to small communities like
Ouzinkie, Port Lions, Afognak Island Russian Village, Danger Bay Logging settlement,
and numerous, hunting, sport fishing, and commercial fishing camps and recreation and
cultural development sites. However, access to Kodiak is possible by boat via Anton
Larsen Bay as the route lies in the lea of the N.E. winds. Nevertheless, access to Anton
Larsen Bay is stopped during most of January, February, March and sometimes April due
to Anton Larsen Bay freezing over. Year -around Anton Larsen Bay Road salt water
access would give residents of Ouzinkie, Port Lions as well as the whole west side of
Kodiak Island access to Kodiak for emergencies during bad N.E. weather and give
Kodiak residents access to the west side of Kodiak Island. In addition, the route is closer
RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 8 of 9
Page 40 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.a.
to these communities and Kodiak residents would use the extended "year around" road
access to increase economic and recreational opportunities during the winter.
10. Public Facilities Development
A. Boardwalk Repair/Replacement $100,000
Ouzinkie's wooden boardwalk is an identifying feature of the community and provides
for a scenic stroll along our coastline. Unfortunately, City budget constraints have not
allowed for proper routine maintenance and our boardwalk is in desperate need of
extensive repairs or a complete replacement. Ouzinkie residents frequently travel the
boardwalk to get from one end of the community to the other and it is a highlight of our
village tour. Ensuring its continued presence in our community is a priority for many
Ouzinkie residents.
B. Community Development $200,000
The City of Ouzinkie has many trails and recreational spots that have been in existence
for time immemorial and should be taken care of especially that Ouzinkie is working on
drawing tourism to the village. Scenic outlook viewing shelters, fire pits, benches,
outdoor toilet facilities, trail maintenance, small bridges, and camping facilities would
contribute to the development of this tourism and economic development. In keeping
with tourism, a water -front area of shops downtown would be an attraction to tourists
where they could buy from local artists.
The community needs an outdoor recreation site. A place where activities such as
baseball, volleyball, basketball, tennis, track, etc. can be conducted. The facility could
also include a camping and barbecue area for outdoor community events and tourist
events.
C. Upgrade to Freezer Building/Fish Processing Facility $350,000
The existence of our community's freezer building/fish processing facility represents a
great deal of opportunity and un -utilized potential. The primary reason for its non-
operational status is that the cost of operation is too high and the village cannot afford its
associated costs. Some modifications are required to update the facility and maximize its
job -creating and income -earning potential, such as a ramp and an easy access point for
unloading fish and finished products.
However, the primary issue which must be addressed is lowering the costs of utilities.
Having the facility linked up with solar panels, wind turbines, etc. would lower the cost
of the round-the-clock power consumption required to keep the catch cold and allow the
village to realize a profit from its efforts. This would also facilitate the community in its
ability to "brand" itself, selling an array of top-quality, locally caught fish to a wide range
of consumers.
RESOLUTION 2023-07 Ouzinkie CIP List 2024-2028 Page 9 of 9
Page 41 of 54
Discuss Resolution No. FY2024-11 Adopting A State Legislative Capital Im...
AGENDA ITEM #2.b.
KODIAK ISLAND BOROUGH
STAFF REPORT
NOVEMBER 9, 2023
4 '
x ASSEMBLY WORK SESSION
SUBJECT: Assembly Review Of Alaska Municipal League Resolutions
ORIGINATOR: Lina Cruz, Deputy Clerk
RECOMMENDATION:
Discuss and determine which resolutions to support.
DISCUSSION:
The Kodiak Island Borough is a member of the Alaska Municipal League and sends delegates
to attend the annual conference each year. An important part of the Annual Local
Government Conference is to discuss and approve the AML Legislative Priorities, Position
Statements and adopt Resolutions on key legislative issues. The process is completed at the
73rd Annual Business Meeting on Friday, December 8th at 9:00 a.m. where the membership
will review and adopt the 2024 documents. Although multiple delegates are sent and could be
in attendance during the annual business meeting, the Kodiak Island Borough is entitled to
only one vote. Discussion is important so that the person who will be voting on behalf of the
Borough knows the official position of the majority of the Assembly.
It has been the practice of the Borough Assembly to discuss the AML resolutions. In the past,
the Assembly discussed each resolution and determined which ones to support. Those that
were contentious were placed on the regular meeting agenda for a vote of the Assembly. The
Mayor, during the work session will ask the Assembly to express any concerns to any of the
resolutions in the packet. This will be the opportunity for the members to express their
thoughts.
The mayor is the authorized representative to carry out the wishes of the Assembly during the
AML business meeting.
ALTERNATIVES:
FISCAL IMPACT:
OTHER INFORMATION:
Kodiak Island Borough
Assembly Review Of Alaska Municipal League Resolutions
Page 42 of 54
AGENDA ITEM #2.b.
•
•
•
•
ALASKA
MUNICIPAL
LEAGUE
2024 Resolutions
For Member Action:
Upon Approval by Resolutions Committee
Page 43 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-01
1 In support of necessary legal action to determine the full extent of the State's constitutional
2 obligation to provide for a system of public education.
3 WHEREAS, it is the State's constitutional obligation to establish and maintain a system of public
4 schools; and
5 WHEREAS, the value of the Base Student Allocation and Pupil Transportation Funding
6 programs have eroded due to inflation and have been in decline since 2009; and
7 WHEREAS, school districts face increasing energy, maintenance, personnel, and insurance
8 costs; and
9 WHEREAS, local governments cover an increasingly larger portion of education funding; and
10 WHEREAS, the State has underfunded school construction and major maintenance for decades,
11 with fewer than 14% of identified priorities addressed on average; and
12 WHEREAS, local governments have insufficient resources to address capital needs of the State's
13 schools, especially in Regional Education Attainment Areas, which are the responsibility of the
14 Department of Education and Early Development; and
15 WHEREAS, increasing local contributions to keep pace with rising costs means trade-offs for
16 each local government, including increasing taxes and decreased spending on other essential
17 programs, such as public safety and infrastructure; and
18 WHEREAS, the ending of the school bond debt reimbursement program has further limited the
19 opportunity to jointly address the needs of schools; and
20 WHEREAS, education is by far the largest budget item for those local governments with
21 education powers, and is required of all boroughs, and home rule and first class cities in the
22 Unorganized Borough; and
23 WHEREAS, the education funding formula designed by the State results in Alaska remaining
24 one of the few states that implements an equalization formula so that it can use federal impact
25 aid to offset its own obligations, and which is meant for localities; and
26 WHEREAS, AML has a resolution in place correctly identifying Impact Aid as local; and
27 WHEREAS, the local contributions plus required State funding are no longer adequate to
28 maintain Alaska's schools, with many districts facing school closures, growing class sizes, and
29 the loss of valuable educational programs due to budget cuts.
30 NOW THEREFORE BE IT RESOLVED that AML would consider support for litigation that
31 clarifies and/or establishes the responsibility of the State of Alaska to fund public education
32 adequately and equitably, including for school construction and maintenance; and
33 BE IT FURTHER RESOLVED that the outcome of this legislation should determine the scope of
34 local government's ability to contribute to local educational attainment and activities beyond the
35 obligation of the State.
SUBMITTED BY: ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 44 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-02
1 Requesting that the State of Alaska develop and implement a PFAS collection and clean-up
2 effort.
3 WHEREAS, PFAS chemicals break down very slowly and can build up in people, animals, and
4 the environment over time and are closely associated with a number of cancers, maternal health
5 problems and other serious health risks;
6 WHEREAS, the Alaska Department of Environmental Conservation lists more than 450 sites
7 contaminated by PFAS across the state; and
8 WHEREAS, PFAS chemicals have contaminated the drinking water in private wells and public
9 water systems in more than ten communities in Alaska, requiring some to rely on shipping in
10 bottled water at great cost; and
11 WHEREAS, most of the environmental PFAS contamination in Alaska is believed to have been
12 caused by use of firefighting foams at airports, where their use is mandated by the Federal
13 Aviation Administration; and
14 WHEREAS, more than 130 airports across the state house aging firefighting kits that are out of
15 date and at risk of creating new contamination from firefighting foam that contains PFAS
16 chemicals; and
17 WHEREAS the cost of proper disposal of the firefighting kits and other materials containing
18 PFAS is prohibitive to many smaller communities; and
19 WHEREAS, AML recognizes the broad and challenging nature of remediation as well as the
20 threat to public health; and
21 WHEREAS, it is in the public interest for the State to do what it can to manage and mitigate this
22 environmental and health threat to Alaska communities.
23 NOW THEREFORE BE IT RESOLVED that AML requests that the State of Alaska develop a
24 detailed plan for addressing the removal of all PFAS supplies and equipment from Alaska
25 communities and provide funding for implementation.
SUBMITTED BY: ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 45 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-03
1 In support of a strategic workforce recruitment and retention effort by and with the State
2 of Alaska to correct high public sector vacancy rates.
3 WHEREAS, national employment data show that private employment has fully recovered from
4 pre -pandemic levels, while state and local public employment remains below pre -pandemic
5 numbers; and
6 WHEREAS, the State of Alaska is operating with an average vacancy rate of 14.2%, with some
7 agencies, such as the Alaska Marine Highway System, facing vacancy rates greater than 50% at
8 times; and
9 WHEREAS, the current vacancy rates impede the ability of the State of Alaska and local
10 governments to provide public services to Alaskans, lower the State of Alaska's contributions to
11 PERS, and hurt the economy; and
12 WHEREAS, the State of Alaska and local governments play key roles in implementing the
13 provisions of the Bipartisan Infrastructure Law and Inflation Reduction Act and obtaining
14 funding for and building once -in -a -generation infrastructure projects; and
15 WHEREAS, the public sector faces specific barriers to hiring, like burnout, long hiring
16 processes, and pay competition with the private sector.
17 NOW THEREFORE BE IT RESOLVED that AML encourages the State of Alaska to address
18 vacancy rates within State agencies; and
19 BE IT FURTHER RESOLVED that the State's efforts be coordinated with local governments to
20 implement complementary workforce recruitment and retention strategies within cities and
21 boroughs.
SUBMITTED BY: ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 46 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-04
1 In support of requiring the Legislature to include fiscal notes that quantify costs to
2 municipalities and school districts in legislation that impacts these entities.
3 WHEREAS, an "unfunded mandate" is any statute, administrative regulation, or order that
4 demands action from a subordinate government without adequate provision for funding the cost
5 to the subordinate government of implementing the demanded action; and
6 WHEREAS, unfunded mandates are a problem because the federal and state governments have
7 tended to balance their budgets on the backs of subordinate governments, thereby shielding
8 themselves from taking the fiscal responsibility for their own policy and program decisions; and
9 WHEREAS, from a purely political standpoint, an unfunded mandate can ensure that the blame
10 for higher taxes or service cuts falls to local elected officials rather than the government that
11 made the decision; and
12 WHEREAS, unfunded mandates are a threat to municipal and school district governance and
13 operations in Alaska; and
14 WHEREAS, additional requirements of a municipality or school district, when not reimbursed,
15 result in a loss of capacity to deliver public services to community members and students; and
16 WHEREAS, AS 24.08.035 requires that bills and resolutions carry fiscal notes that contain an
17 estimate of the cost that would result from enactment for the current fiscal year and for five fiscal
18 years in the future; and
19 WHEREAS, this statute limits those estimates to the cost to the State of Alaska alone, excluding
20 costs that may fall to local governments and school districts to bear, obfuscating the true cost of
21 enacting legislation.
22 NOW THEREFORE BE IT RESOLVED that AML supports legislation that requires the State of
23 Alaska and Alaska State Legislature to include municipal and school district fiscal notes as part
24 of its process in evaluating legislation that impacts local governments and public education.
SUBMITTED BY: ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 47 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-05
1 In support of legislation that requires prompt payment of contracted and formula funding
2 obligations, including the distribution of Community Assistance.
3 WHEREAS, AS 36.90.200 requires the State of Alaska to pay contractors performing
4 construction or public works activities in a timely manner; and
5 WHEREAS, this statute introduces penalties for non-compliance, including interest on non -
6 payment, which reimburses the contractor for opportunity costs or additional burdens
7 experienced; and
8 WHEREAS, the need for prompt payment extends well -beyond construction contracts and
9 should be broadly applicable to all grantees and contractors of the State; and
10 WHEREAS, the State disburses money in multiple ways to many entities, including to healthcare
11 organizations and non -profits receiving Medicaid reimbursement, and to local governments
12 through programs like Community Assistance; and
13 WHEREAS, chronic delays in government payments are a serious problem for communities
14 across the country, as well as in Alaska, with private, public, and nonprofit providing crucial
15 health and human services to their communities; and
16 WHEREAS, many of these entities operate with less than 90 days in cash reserves, and some
17 with little or none - "reimbursable" grant agreements require them to fund all the costs of
18 services for 30 to 90 days before they can even invoice for payment; and
19 WHEREAS, delayed payments create hardships for organizations' ability to operate effectively,
20 and extended delays jeopardize the health and well-being of those they serve on behalf of state
21 agencies, as well as threaten the providers' financial stability and solvency, often forcing them to
22 exhaust reserves and resort to lines of credit; and
23 WHEREAS, municipalities and other entities suffer due to delays in disbursements that may
24 make them unable to fulfill their own obligations and provide their own services; and
25 WHEREAS, local governments have reported delayed payments that have affected property
26 insurance renewals, payroll and project payments, delayed construction and maintenance
27 activities, delayed bulk fuel commitments and contracting, inability to reflect non-federal match
28 for federal grants; and
29 WHEREAS, there is an opportunity cost that comes with non-payment as well, especially when
30 reserves have to be used that lessen investment returns, and otherwise interest and fees may
31 compound non-payment; and
32 WHEREAS, it is in the State's interest to ensure the solvency and sustainability public, private,
33 and nonprofit organizations and can facilitate this by ensuring prompt payment.
34 NOW, THEREFORE BE IT RESOLVED, that AML requests that the Alaska State Legislature
35 pass legislation requiring the State of Alaska to provide prompt payments in all of its contracted
36 and formula obligations, grants, or transfers; and
37 BE IT FURTHER RESOLVED that State agencies should increase their ability to meet this duty
38 and ensure appropriate levels of capacity to do so.
SUBMITTED BY: ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 48 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-06
1 In support of expanded funding for NOAA and partners to complete mapping and
2 bathymetry of Alaska's coastal zone.
3 WHEREAS, Alaska's 66,000 miles of coastline are the longest of any state in the nation — and
4 more than the rest of the nation combined — and are important places for economic activity,
5 community development, transportation, and subsistence; and
6 WHEREAS, completed mapping and bathymetry is especially lacking for Alaska and for the
7 Alaskan Arctic, which lack the comprehensive shoreline and nearshore maps available to much
8 of the rest of the nation; and
9 WHEREAS, informed decisions and improved safety in the coastal zone depend heavily on
10 accurate and up-to-date coastal mapping data; and
11 WHEREAS, community resilience to coastal hazards such as flooding, erosion, and tsunami
12 begins with mapping data to establish baseline conditions and model change; and
13 WHEREAS, increased efforts to map Alaska's coastal zone will lead to improved access to and
14 utilization of data; and
15 WHEREAS, mapping will bolster the shipping and fishing economy through safer maritime
16 navigation; and
17 WHEREAS, mapping will ensure more resilient coastal economies through flood and wave
18 impact modeling, data -driven coastal infrastructure development, improved emergency planning,
19 and more effective community management plans; and
20 WHEREAS, the November 2019 Presidential Memorandum on Ocean Mapping of the United
21 States Exclusive Economic Zone and the Shoreline and Nearshore of Alaska calls for the
22 National Oceanic and Atmospheric Administration (NOAA), the State of Alaska, and the Alaska
23 Mapping Executive Committee (AMEC) to develop an Alaska coastal mapping strategy; and
24 WHEREAS, sufficient funding will lead to seamless and accurate coastal mapping data that will
25 support the State of Alaska, local governments, Alaska's economy, Tribes, national security, and
26 the environment.
27 NOW THEREFORE BE IT RESOLVED that AML requests that Congress allocate the resources
28 necessary to complete the goals and objectives outlined in Mapping the Coast of Alaska: A 10-
29 Year Strategy in Support of the United States Economy, Security, and Environment by 2030.
SUBMITTED BY: ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 49 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-07
1 In support of changes to HUD regulations that limit participation of Alaska local
2 governments in HUD -funded programs.
3 WHEREAS, Alaska's existing housing stock is overcrowded, energy inefficient, and aging
4 rapidly, while new housing construction is unable to keep up with demand, leading to a growing
5 housing shortage across the state; and
6 WHEREAS, the shortage of housing means families struggle to find safe, stable, affordable
7 housing, straining their physical and mental health; and
8 WHEREAS, the shortage of housing affects the ability of communities to recruit and retain
9 professionals, including teachers, public safety officers, and healthcare workers, leading to
10 worsening economic outcomes; and
11 WHEREAS, the U.S. Department of Housing and Urban Development Community
12 Development Block Grant (CDBG) Entitlement Program exists to create transformative impact
13 within communities, improve the lives of residents, especially those with low- and moderate -
14 income levels, and develop strategies that bring partners and resources together; and
15 WHEREAS, Anchorage is the only Alaska city large enough to receive money directly from this
16 program, receiving $1.9 million in 2022, or 0.05% of the national total; and
17 WHEREAS, the State of Alaska is awarded funding for the balance of the state, receiving $2.7
18 million in 2022, or 0.08% of the national total;
19 WHEREAS, HUD's 2022 Annual Homelessness Assessment Report to Congress shows that with
20 a rate of 31.7 homeless individuals per 10,000 people, Alaska finds itself in the 8th position
21 nationwide and that Alaska has seen a notable increase, with a 19% growth in homelessness
22 since 2020, the 10th highest increase among all states; and
23 WHEREAS, in many communities across the state there are no emergency shelters, no vacancies
24 of habitable structures, and the environmental conditions are so harsh that living outdoors results
25 in freezing to death; and
26 WHEREAS, local governments continue to develop innovative solutions to the housing crisis,
27 yet find themselves unable to access CDBG funds.
28 NOW THEREFORE BE IT RESOLVED that AML requests that the U.S. Department of
29 Housing and Urban Development update the CDBG funding formulas and expand other
30 programs to address the needs of small and rural communities in Alaska that are otherwise
31 excluded.
SUBMITTED BY: ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 50 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-08
1 Requesting the Alaska State Legislature encourage economic development through housing
2 investments and policymaking.
3 WHEREAS, some estimates show, the national shortage on affordable housing is 7.2 million,
4 with an estimated 27,500 new housing units needed in Alaska over the next ten years;
5 WHEREAS, Alaska's rising rent, cost of building, and remodeling makes it one of the most
6 expensive markets nationwide, causing a barrier to attract and retain workforce and Alaskan
7 youth; and
8 WHEREAS, historically, the State of Alaska has played a role in encouraging housing
9 development through loans or bonding via state agencies like AHFC; and
10 WHEREAS, until 2022 and the creation of Housing Alaskans: A Public -Private Partnership
11 (HAPPP), Alaska was one of the last states in the country without a statewide housing trust; and
12 WHEREAS, multiple committees in the Legislature address housing, including Labor and
13 Commerce, State Affairs, and Community and Regional Affairs, with no singular Legislative
14 committee tackling this issue in a systemic way; and
15 WHEREAS, the lack of available land, which could be alleviated by land transfers from the
16 state and federal governments, and expensive infrastructure such as water, sewer, and road
17 access, causes overcrowding and under development in communities; and
18 WHEREAS, Alaska's housing issues are at the intersection of workforce and economic
19 development, family and youth retention and homelessness, and solving our housing issues can
20 help to alleviate these matters.
21 NOW, THEREFORE BE IT RESOLVED AML encourages the Alaska Legislature to make
22 meaningful investments into the statewide housing trust, HAPPP; and create a time-limited
23 Legislative Committee to explore statewide housing solutions with actionable goals; and
24 BE IT FURTHER RESOLVED, AML encourages the Alaska Legislature to assist in making
25 developable land available to local governments to spur housing construction; and create an
26 infrastructure revolving fund focused on water, sewer, and roads to assist in development of the
27 land.
SUBMITTED BY: ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 51 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-09
1 Requesting the Alaska State Legislature to assist local communities in addressing
2 homelessness.
3 WHEREAS, housing is the solution to homelessness, but until our housing shortage is
4 addressed, local communities must look at making investments in emergency shelter and
5 other supports; and
6 WHEREAS, the U.S. Department of Housing and Urban Development (HUD) defining
7 homelessness as: individuals or families who lack a fixed, regular, and adequate nighttime
8 residence; individuals or families who are temporarily couch surfing; unaccompanied youth
9 under 25 years of age who are unstably housed; and individuals or families fleeing or
10 attempting to flee domestic violence and have no other residence; and
11 WHEREAS, the unduplicated statewide total count of clients within the Alaska Homeless
12 Management Information System from August 1, 2022, to August 31, 2023, is 17,796
13 individuals; and
14 WHEREAS, tens of thousands of individuals and families have received some type of rental,
15 utility or energy assistance that keeps them out of homelessness, but the recent 7% increase in
16 rents statewide are putting the efficacy of these efforts in jeopardy; and
17 WHEREAS, a recent visit by HUD Secretary Fudge highlighted the need for review of HUD
18 funding formulas and the negative and inequitable impact they have on Alaska; and
19 WHEREAS, local communities, whether through local governments or through
20 philanthropy, have made significant investments to address homelessness across the state;
21 and
22 WHEREAS, emergency shelter includes large congregate shelter, non -congregate shelter,
23 churches, or other smaller facilities serving many different populations; and
24 WHEREAS, line -item budget vetoes of the State of Alaska FY20 budget led to a short-term
25 reduction in shelter capacity throughout the state, highlighting the fragility of operational
26 funding for the statewide shelter system; and
27 WHEREAS, there are limits on local government capacity to take on operational costs of
28 shelter year over year, especially winter shelter, but are making investments across the
29 system and need help from the State of Alaska to make these investments sustainable long
30 term; and
31 WHEREAS, the Governor appointed, Alaska Council on the Homeless, is responsible for
32 updating and reporting on the outcomes towards achieving the goals of its 10 -year plan
33 created in 2009 named the Alaska's Plan to End Long Term Homelessness.
34 NOW, THEREFORE BE IT RESOLVED that AML supports the Alaska Legislature
35 invest in regular operational funding for emergency shelters across the state; and
36 BE IT FURTHER RESOLVED, that AML requests that Governor Dunleavy task the
37 Alaska Council on the Homeless to update Alaska's Plan to End Long Term Homelessness.
SUBMITTED BY: ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 52 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-10
1 Requesting the Alaska State Legislature approve a coastal infrastructure general
2 obligation bond for the 2024 election.
3 WHEREAS, Alaska has the most miles of coastline of any U.S. state, and communities
4 maintain a total of 40 port and harbor facilities; and
5 WHEREAS, ports, harbors, and other maritime facilities are critical infrastructure for
6 residents and businesses, and serve important functions such as: food security, fuel delivery,
7 transportation and logistics, resource extraction, commercial fishing, tourism, hospitality,
8 national security, and military preparedness; and
9 WHEREAS, there is a critical need for coastal infrastructure repair and maintenance in
10 Alaska, according to the Report Card for Alaska's Infrastructure 2021 by the Alaska Section
11 of the American Society of Civil Engineers, awarded Alaska a grade of "D+" to its ports and
12 harbors; and
13 WHEREAS, the Bipartisan Infrastructure Law (BIL), signed November 2021, authorizes
14 $1.2 trillion dollars of much-needed federal infrastructure investment, including over $17
15 billion in funding for ports and maritime infrastructure over five years; and other financing
16 such as the Transportation Infrastructure Finance and Innovation Act (TIFIA) loan program
17 may be available but requires a dedicated fund source; and
18 WHEREAS, in August 2023, U.S. Department of Transportation Secretary Pete Buttigieg
19 visited several communities across Alaska to recognize recent investments and understand
20 Alaska's unique geography, environment, and logistical challenges, speaking on multiple
21 occasions to Alaska's reliance on maritime infrastructure and scale of investment needed; and
22 WHEREAS, Alaska communities have limited capacity to finance capital improvements,
23 even for facilities with a tariff structure to fund its operations; and
24 WHEREAS, a 2011 study on Alaska's ports and harbors recommended the State of Alaska
25 create a Transportation Infrastructure Development Program to create a comprehensive
26 baseline assessment of coastal infrastructure and state funding of such infrastructure; and
27 WHEREAS, the State of Alaska has supported infrastructure projects across the state
28 through voter -approved general obligation bonds, with a total of 51 bond packages being
29 approved since statehood totaling $2.2 billion, including a 2010 bond package for education
30 infrastructure; and
31 WHEREAS, the State Legislature must approve a general obligation bond package during the
32 2024 Legislative Session for a bond package to appear on the November 5, 2024, ballot; and;
33 NOW, THEREFORE BE IT RESOLVED that the Alaska Municipal League supports The
34 Legislature and Administration funding critical coastal infrastructure throughout the state with
35 general obligation bonds and other or braided state and federal funding, including BIL grant
36 funding, TIFIA financing, and other capital sources that leverage local match funding and
37 revenue streams.
SUBMITTED BY. ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 53 of 54
Assembly Review Of Alaska Municipal League Resolutions
AGENDA ITEM #2.b.
Alaska Municipal League
Resolution #2024-11
1 Requesting the Alaska State Legislature invest resources to address the state's behavioral
2 health needs, from crisis response to community-based services.
3 WHEREAS, the Alaska Behavioral Health Systems Assessment (2016) estimated that
4 approximately one in four Alaska adults and youth live with one or more behavioral health
5 conditions; and addressing behavioral health needs, at a population and community level, are a
6 form of public health, from promoting mental health and well-being to having appropriate crisis
7 response training and services; and
8 WHEREAS, the Alaska Constitution requires the State of Alaska to "provide for the promotion
9 and protection of public health" (Article VII, Section 4), and the State has statutory responsibility
10 for ensuring mental health services are provided, while Title 29 provides for certain types of
11 local governments to adopt health powers, but only some local governments have taken on this
12 authority, and most lack the necessary resources to implement an effective program; and
13 WHEREAS, since 2018 multiple partners are working together to improve Alaska's system of
14 care that responds to people experiencing a behavioral health crisis following the nationally
15 recognized Crisis Now model, which implements a continuum of services; and
16 WHEREAS, some Alaska communities are leading local implementation of the Crisis Now
17 model, including mobile crisis response teams in Anchorage, Fairbanks and Mat -Su, and crisis
18 stabilization centers in Anchorage and Juneau, and other communities are exploring local services
19 following the Crisis Now model; and the 988 Suicide & Crisis Lifeline was implemented in Alaska
20 in July 2022, and the Alaska Legislature has already made investments to implement Crisis Now
21 at a local level with $8 million in capital funding; and
22 WHEREAS, communities look to State leadership and investment to address system -wide
23 behavioral health needs, to ensure a stronger and more coordinated continuum of services that
24 bridges the needs and complements investments at the local level;
25 NOW, THEREFORE BE IT RESOLVED the Alaska Municipal League requests that the
26 Alaska Legislature increase investments in Crisis Now, both at the statewide system level with
27 investments such as permanent funding to operate the 988 Crisis Lifeline, and additional targeted
28 investments to assist local communities in building out their own behavioral health services; and
29 BE IT FURTHER RESOLVED, AML requests that the Alaska Legislature address gaps in the
30 overall behavioral health continuum of services, including investments in workforce and
31 housing, and removing regulatory barriers and programmatic inefficiencies.
SUBMITTED BY. ALASKA MUNICIPAL LEAGUE BOARD OF DIRECTORS
RESOLUTIONS COMMITTEE ACTION:
BUSINESS MEETING ACTION:
Page 54 of 54
Assembly Review Of Alaska Municipal League Resolutions
KODIAK ISLAND BOROUGH
Meeting Type: JA�a(-/�- Date: t' LO
Please PRINT vour name leaib
IT
Phone number
- SSL) -2