Loading...
FY2024-20 Agreement between Jensen Yorba Wall & KIB for the KIB UST Removal Fee & ScopeContract FY2024-20 Jensen Yorba Wall Inc. 522 West 10th Street, Juneau, Alaska 99801 907.586.1070 jensenyorbawall.com Designing Community Since 1935 Date: September 1, 2023 To: Patricia Valerio From: Corey Wall Re: KIB UST Removal (JYW No. 23018) Fee & Scope Thank you for requesting design services for the KIB Underground Storage Tank Removal project. The project will be completed as part of our existing term contract with KIB. Our understanding is that the project scope is removal of two approximately 300 -gallon underground storage tanks, one located at the Red Cross Building and one at the Mental Health Buildings. The tanks are under grassy lawns and, based on previous investigations by KIB, are not believed to have significant contaminated soils. Given the small size of the project, we propose to provide: • One or two diagrammatic site drawings with sheet notes describing the project to assist potential contractors in developing cost proposals for the project. • Drawings will be based on site information provided by KIB. • Sheet notes will contain general instructions for excavation, tank decommission and removal, backfill, and lawn seeding. • Please see the attached proposal from PND with additional details on the civil engineering services. Exclusions: • Specifications, including front-end bid specifications are not included at this time with the assumption that this small project can be procured without requiring full bid documents. • Environmental engineering services are not included at this time. If significant contaminated soils are discovered during excavation, these engineering services will need to be added. These services are proposed on a Time and Expense basis with a cap of $5,000. Kodiak Island Borough Manager Approvat.tg Move Forward: VNINID Aimee Williams eP to ; Borough Manager Jensen Yorba Wall FK- . () J `q1� Date ier ^F rk or-13ep*ty"G" Architecture Interior Desion Construction page 1 of 1 I- NGINEERS,INC. August 29, 2023 Corey Wall Principal Architect Jensen Yorba Wall, LLC 522 West 101h Street Juneau, AK 99801 SuBJEcr: KIB UST Removal Assistance Fee Proposal Dear Mr. Wall: 231096 PND Engineers, Inc. (PND) appreciates the opportunity to provide this fee proposal to Jensen Yorba Wall, LLC (JYW) for assistance in preparing design documents for the removal of (2) underground storage tanks (UST) in Kodiak, Alaska. The tanks are located adjacent to Kodiak Island Borough (KIB) offices in landscaped areas. Details of the tanks are generally unknown, and you have indicated that contamination in the surrounding soil is not expected based on testing by others. The scope of requested services is limited to PND providing civil sheet notes for incorporation on project drawings to be prepared by JYW. The notes will consist of general instructions for excavation, tank decommissioning, and backfill. Addressing comments from one client review submittal is anticipated. The proposed scope excludes: • Participating in client meetings; • Bidding and construction phase services; • Coordination with DEC or environmental subconsultants regarding formal tank closure with DEC; • Addressing soil contamination, if encountered. PND proposes to provide the services described herein for a fixed fee of $1,500. The proposed fee is valid for 60 days from the date of this proposal. If written authorization is not received within that period, PND may re-evaluate the proposal and make adjustments based on staff availability and billing rates. We appreciate the opportunity to provide these services to JYW this important project. We are available to commence immediately upon receiving writing authorization to proceed. Sincerely, PND Engineers, Inc. I Juneau Office axr- �- Dick Somerville, P.E. Vice President Sean Sjoste t, P.E. Principal Engineer 9360 GLACIER HIGHWAY 0 JUNEAU, AK 99801 9 P: 907.586.2093 9 F: 907.586.2099