FY2023-49 Agreement for Kodiak Landfill Progress Topography Surveying 2023 with Kodiak Land SurveyingPage 2
KIB Landfill Progress Topographic Survey 2023
KODIAK LAND SURVEYING
ALASKA LICENSED LAND SURVEYOR, 35 YEARS EXPEREINCE PO BOX 232
DEDICATED TO YOUR PROJECT. KODIAK AK 99615
907-486-1945
kodi klandsurve in .com
Jena Hassinger April 26, 2023
Solid Waste Mgr/Env Spec
Engineering and Facilities
Kodiak Island Borough
RE: Topographic and As -built Survey of Kodiak Island Borough Landfill
AutoCAD Drawing of Landfill
Jena:
I appreciate the chance to offer Professional Land Surveying Services in support of the KIB
Landfill Management.
Kodiak Land Surveying has conducted the "KIB Landfill Progress Topographic Survey"
starting since the original survey in 2003. We conducted this survey every two years per DEC
permit in 2004, 2006, 2008, 2010, 2012 and 2019. No Topographic Progress Survey has
been conducted since that time.
Kodiak Land Surveying, (Alaska Business License No. 279165.) is the oldest surveying
company in Kodiak with 35+ years' surveying in Alaska and 24 years as a Kodiak Business.
We are happy to be able to offer the unusual service of an experienced Alaska Licensed
Land Surveyor as the dedicated person performing the field work, calculations and AutoCAD
drafting work for this project.
Thank you for the opportunity and if you have any questions, please call anytime.
Included please find proposal outlining these services.
wrk 486-1945 / mbl 539-1945.
Sincerely,
Jim Purdy PLS
Page 3
KIB Landfill Progress Topographic Survey 2023
Understanding of the Project
I have provided Professional Land Surveying Services to support the landfill operations since
1987 and Kodiak Land Surveying has handled the Topographical Progress Surveys and
Monitoring since its inception in 2003.
1 have conducted a recent site visit to inspect the survey area.
Schedule
The prices outlined are dependent on winter season vegetation cover.
Kodiak Land Surveying plans to complete the project by June 15tH
Cost Proposal
Provide all Labor, Materials to deliver:
-Research contractor utility and construction as-builts to convert to Landfill Datum and
include in AutoCAD deliverable for future management and construction design.
-Topography of existing ground conditions, including break lines, sufficient for 2 -foot contour
interval mapping and grid surface for quantity calculations.
- Provide GPS RTK survey control points, - Construct, Horizontal and Vertical Control Survey
Historical Landfill Control Datum. To be used for all future Construction, Management,
Surveying and Design Tasks.
-ASCII file with all topographic and control points.
-Profile Cross -x -tions on Landfill baseline that show finish grades and current internment
level. These profiles show wedge fill areas and are a key management tool for areas
approaching closure grades within the original Landfill Cell.
- Professional Surveyor Stamped Paper and AutoCAD digital copies of Topographic As -Built
Survey.
- Flag slope monitoring monuments for KIB clearing
-Topography surveyed during this project of Asbestos Area, Stockpiles, and Active Landfill
Area would be utilized to assist generating the 2023 management quantities and active area
submittals.
-2019 costs for this project - $19,850
2023 Proposed project cost Total = $19,850
Page 4
KIB Landfill Progress Topographic Survey 2023
This cost reflects less than comparable services for 2008, 2010, 2012 & 2019 Progress
Surveys.
All work would be done as per your specifications.
This estimate represents maximum figures for the work listed within.
Kodiak Land Surveying provides experienced professionally licensed staff to conduct all
project tasks. This ensures the best quality product and limits client liability and lowers
management costs.
Our hourly rates are some of the lowest in the industry and charges are based on actual
hours worked and not projected costs.
Kodiak Land Surveying maintains surveying and construction records from Kodiak Projects
since the 1940's. You can depend on us having your project in our records for whenever you
may need it in the future.
If you have any questions about anything within this proposal, please call anytime.
Sincerely,
Jim Purdy PLS
Page 5
KIB Landfill Progress Topographic Survey 2023
In the event additional work is requested by KIB during the course of this project, - the
following rates would apply.
RATES SET -1/2012
RPLS - PROJECT RESEARCH, CONSULTATION $75 HR
RPLS - CALCULATIONS $110 HR
AUTOCAD DRAFTING $95 HR
RPLS -1 PERSON FIELD SURVEY- ROBOTIC TOTAL STATION INSTRUMENT
OR GLOBAL POSITIONING SYSTEM
RPLS & TECH - 2 PERSON FIELD SURVEY $230 HR
REQUESTED OVERTIME IS AN ADDITIONAL 40%
ACKNOWLEDGEMENTS
jaw'�' �4 t. '6 -"AA --
Aimee Williams
Kodiak Island Borough Manager
Nova M. Javier
Kodiak Island Borough Clerk
$175 HR