Loading...
2021-09-27 Regular MeetingARCHITECTURAUENGINEERING REVIEW BOARD REGULAR MEETING September27, 2021, 5:30 p.m. KIB Assembly Chambers CALL TO ORDER MELIN called the meeting to order at 5:32 P.M. ROLL CALL Board Members present were Tyler Andersen, Cliff Ford, Jon Melin and Tyler Swanson. Also present were Matt Gandel, KIB Project Manager/Inspector and Assembly Representative Scott Arndt. Brian Pekar of RSA Engineering and Cory Hinds of Jacobs Engineering were present via Zoom. A QUORUM WAS ESTABLISHED. APPROVAL OF AGENDA SWANSON moved to approve the agenda. VOICE VOTE ON MOTION CARRIED UNANIMOUSLY. APPROVAL OF MINUTES FORD moved to approve the minutes from March 15, 2021. VOICE VOTE ON MOTION CARRIED UNANIMOUSLY. PUBLIC COMMENTS None. REVIEW OF 100% PKIMC BOILER DAY TANK REPLACEMENT. GANDEL introduced the project and reviewed the scope with the Board. Brian Pekar of RSA Engineering provided additional information. Board discussion ensued. FORD moved to approve the 100% drawings as presented. ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY. REVIEW OF 80% LANDFILL STAGE 3 CLOSURE. GANDEL introduced the project and reviewed the scope with the Board. Cory Hinds of Jacobs Engineering provided additional information. Board discussion ensued. SWANSON moved to approve the 80% Landfill Stage 3 Closure drawings and specifications. ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY. Architectural/Engineering Review Board September 27, 2021 Page 1 of 2 ARCHITECTURAL/ENGINEERING REVIEW BOARD REGULAR MEETING September27, 2021, 5:30 p.m. KIB Assembly Chambers REVIEW OF 80% LEACHATE TREATMENT PLANT AERATION TANK. GANDEL introduced the project and reviewed the scope with the Board. Cory Hinds of Jacobs Engineering provided additional information. Board discussion ensued. SWANSON moved to accept the 80% Leachate Treatment Plant Aeration Tank drawings and specifications. ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY. BOARD COMMENTS None. ADJOURNMENT SWANSON moved to adjourn the meeting. VOICE VOTE ON MOTION CARRIED UNANIMOUSLY. MEETING ADJOURNED AT 6:13 P.M. Respectively submitted: G Matt Gandel, Prcjec anager Date errol Frie Chair Date Architectural/Engineering Review Board Architectural/Engineering Review Board September 27, 2021 Page 2 of 2