2020-12-07 Regular MeetingARCHITECTURAL/ENGINEERING REVIEW BOARD SCANNED.
REGULAR MEETING
December7, 2020, 5:30 p.m. Date: 411:ktlt: �—
KIB Assembly Chambers — Via Zoom
CALL TO ORDER
CHAIR FRIEND called the meeting to order at 5:30 P.M.
ROLL CALL
Board Members present via Zoom were Chair Jerrol Friend, Vice Chair Jascha Zbitnoff, Jon Melin,
and Cliff Ford. Tyler Swanson was present in person.
Also present in person were Matt Gandel, KIB Project Manager/Inspector and Assembly
Representatives Aimee Williams and Scott Arndt. Brian Pekar of RSA Engineering, Corey Wall of
Jensen Yorba Wall and Chris Gianotti of PND Engineers were present via Zoom.
A QUORUM WAS ESTABLISHED.
APPROVAL OF AGENDA
ZBITNOFF moved to approve the agenda.
VOICE VOTE ON MOTION CARRIED UNANIMOUSLY.
APPROVAL OF MINUTES
ZBITNOFF moved to approve the minutes from September 28, 2020.
VOICE VOTE ON MOTION CARRIED UNANIMOUSLY.
REVIEW OF 95% DRAWINGS FOR KFRC FUME HOOD.
Matt Gandel (KIB) introduced the project to the Board. Brian Pekar of RSA Engineering provided
detailed information on each drawing sheet. Board discussion ensued.
ZBITNOFF moved to approve the 95% drawings for the KFRC Fume Hoods.
ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY.
REVIEW OF 95% DRAWINGS & SPECIFICATIONS FOR PKIMC RETAINING WALL
Matt Gandel (KIB) introduced the project to the Board. The Board had reviewed the 65% drawings
in September. Chris Gianotti (PND) provided detailed information on each drawing sheet. Board
discussion ensued.
ZBITNOFF moved to approve the 95% drawings for the PKIMC Retaining Wall with changes as
noted.
ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY.
Architectural/Engineering Review Board December 7, 2020
Page 1 of 3
ARCHITECTURAL/ENGINEERING REVIEW BOARD
REGULAR MEETING
December 7, 2020, 5:30 p.m.
KIB Assembly Chambers — Via Zoom
REVIEW OF 65% DRAWINGS FOR KFRC EXTERIOR RENOVATION
Matt Gandel (KIB) introduced the project to the Board and asked Corey Wall of Jensen Yorba Wall
to present the project. Corey went over project details thoroughly with the Board. Discussion
ensued.
ZBITNOFF moved to approve the 65% drawings for KFRC Exterior Renovation.
ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY.
REVIEW OF 65% DRAWINGS FOR NORTH STAR ELEM EXTERIOR — PHASE II
Matt Gandel (KIB) presented the project to the Board with a brief introduction. Corey Wall reviewed
the drawings in detail. Discussion regarding alternate 1 replacing windows, alternate 2 skylight and
adding a phenolic panel wainscot ensued.
ZBITNOFF moved to approve the 65% drawings for Phase II North Star Elementary Exterior.
ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY.
PUBLIC COMMENTS
None.
BOARD COMMENTS
None.
STAFF COMMENTS
None.
ADJOURNMENT
FRIEND moved to adjourn the meeting.
ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY.
MEETING ADJOURNED AT 8:01 P.M.
Respectively submitted:
Martha Barnett, Project Assistant
Architectural/Engineering Review Board
Q, y
ate
December 7, 2020
Page 2 of 3
ARCHITECTURAL/ENGINEERING REVIEW BOARD
REGULAR MEETING
December 7, 2020, 5:30 p.m.
KIB Assembly Chambers — Via Zoom
Ci �Q.e%4�ZAi
Jerr riend, Chair
Arc itectural/Engineering Review Board
Feb 22 2021
Date
Architectural/Engineering Review Board December 7, 2020
Page 3 of 3