FY2020-03 Kodiak High School and Fisheries Research Center Boiler ReplacementRECORDS RETENTION EXTENSION FORM
The Manager and Department Directors can extend the retention period of a record in the records center
and delay the disposal of a record for up to five years if there is a valid administrative purpose.
REQUESTED BY: Patricia Valerio
DATE: 03/10/2025 LOCATION: EF
DEPARTMENT: Eng & Fac
RECORDS SERIES: CL -09
CONTENT SUMMARY: FY2020-03 KHS & KFCR Boiler Replacement
YEARS REQUESTED: 5
(Not to exceed 5 years)
EXTENSION EXP. DATE: 06/30/2030
IDENTIFY THE REQUIRED BOROUGH ADMINISTRATIVE PURPOSE BELOW:
History of changes to buildings. Has detailed information on boilers. Need time to verify the
information has been documented for the O&Ms being held for the building documents.
FILL OUT BELOW FOR ANY SUBSEQUENT REQUESTS
(MUST be approved by the Manager and Clerk)
REQUESTED BY: DEPARTMENT: Select One
DATE:
CONTENT SUMMARY:
YEARS REQUESTED:
(Not to exceed 5 years)
LOCATION:
RECORDS SERIES:
EXTENSION EXP. DATE:
IDENTIFY THE REQUIRED BOROUGH ADMINISTRATIVE PURPOSE BELOW:
APPROVED BY:
MANAGER CLERK
The Records Management Code can be found here.
Rev. 07/25/2024
KODIAK ISLAND BOROUGH CONTRACT CHANGE ORDER
710 MILL BAY ROAD Project Name: Project Number:
KODIAK, ALASKA 99615 KFRC/KHS Electric Boiler Replacement 19002.5A/19001.5A
Contractor: Wolverine Supply, Inc.
ContractNo.: FY2020-03
Change Order No.: 02
Original Project Budget:
$ 775,000.00
Original Contract:
$ 642,780.00
Previous Budget Changes:
S 0.00
Previous Changes:
S 0.00
Adjusted Project Budget:
$ 775,000.00
This Change:
S 0.00
To -Date Project Expenses:
S 189,502.47
% of Original Contract
0.0%
To -Date Project Encumbrances:
$ 540,163.57
Adjusted Contract:
$ 642,780.00
Current Remaining Budget:
$ 45,333.96
o
Description of Change
Cost
The current substantial completion date is January 10, 2020. Due to logistical issues with getting the
$ 0.00
new electric holler inside Kodiak High School as well as additional Contractor coordination issues,
the substantial completion date is now being extended to February 28, 2020.
The time provided for completion of the contract is (❑ unchanged) (®increased) (❑decreased) by 49 calendar days. This
document shall become an amendment to the contract and all provisions of the contract will apply thereto.
Per Borough Code 3.30.100, a change order that does not exceed five percent of the original contract amount or 850,000,
whichever is !raver, requires approval by the mayor and deputy presiding officer, the mayor and one assembly »reurber in the
absence of the deputy presiding office, or the deputy presiding officer and one assembly member in the absence of the mayor.
Change orders greater than rive percent of approved contract amount or 850,000, whichever, is lower, require assembly approval
Accepted By:
Approved By:
Borough
Mayor and Deputy Presiding Officer Approval (does not exceedfive percent ofthe original contract
Approved By:
Borough Mayor
Date:
Deputy Presiding Officer
Borough Assembly Approval (greater trot five percent ojapproved contract amount or 550,000, whichever is /rover)
Approved By: Date: Attest:
Borough Manager
Borough Clerk
Date:
Revised 09119 Page I of I
Date: January 16, 2020
Kodiak Island Borough
Engineering & Facilities Department
Projects Office
710 Mill Bay Road
Kodiak, Alaska 99615
Phone (907) 486-9210 Fax (907) 486-9347
To: Dave Conrad, E/F Director
From: Matt Gandel, Project Manager/Inspector/4-
RE: Contract 2020-03 Change Order #02
Attached is change order #02 to contract 2020-03 for Wolverine Supply, Inc. for the KFRC/KHS
Electric Boilers project. The original completion date for this project was September 30, 2019,
however due to an extended bid/award process this was extended to January 10, 2020 in change
order #01. Now, due to problems with getting the new electric boiler inside Kodiak High School,
as well as a variety of self-inflicted Contractor coordination issues, the completion date is being
extended to February 28, 2020. Recent positive construction progress is indicative that this
revised completion date is reasonable and achievable. Since both KFRC and KHS still have
operable boilers this extension will have minimal impact on the operations of both facilities.
KODIAK ISLAND BOROUGH CONTRACT CHANGE ORDER
710 MILL BAY ROAD Project Name: Project Number:
KODIAK, ALASKA 99615 KFRCIKHS Electric Boiler Replacement 19002.5.A/19001.5A
Contractor: Wolverine Supply, Inc.
ContractNo.: FY2020-03
Change Order No.: 01
Original Project Budget:
$ 775,000.00
Original Contract:
S 642,780.00
Previous Budget Changes:
$ 0
Previous Changes:
S 0
Adjusted Project Budget:
S 775,000.00
This Change:
S 0
To -Date Project Expenses:
S 57,129.82
% of Original Contract
0.0%
To -Date Project Encumbrances:
S 659,934.50
Adjusted Contract:
S 642,780.00
Current Remaining Budget:
$ 57,935.68
Description of Change
Cost
The substantial completion date in the contract documents is September 30, 2019. Due to the
$ 0.00
extended contract award process and long lead times for the boilers and disconnects, the substantial
completion date is extended to January 10, 2020.
The time provided for completion of the contract is (❑ unchanged) (®increased) (❑decreased) by 102 calendar days. This
document shall become an amendment to the contract and all provisions of the contract will apply thereto.
Per Borough Code 3.30.100, a change order that does not exceed five percent of the original contract amount or $50,000,
whichever is lower, requires approval by the mayor and depnty presiding officer, the mayor and one assembly member in the
absence of the deputy presiding office, or lire deputy presiding officer and one assembly member in the absence of the mayor.
Change orders greater than five percent or approved contract anoint or $50,000, whichever is lower, require assenrb/y approval.
Accepted By:
Contractor's Representative
Recommend`e y am kAm;� GrcV( yl Date: 103/1e1
Engt a nglFlIc�ilities;Director Finance D ech
Approved By: / Date: Attest:
orough ager Borough
Mayor and Deputy Presiding Officer Approval (does not exceed five percent ofthe original
Approved By:
Borough Mayor
Date:
Date: l e)Al l J
or S30;F)_00(jvhlediQr/is lower)
Deputy Presiding Offt%L-Ki{ {2
Borough Assembly Approval (greater thanfive percent' ofapproved conract amount or 550,000, whichever is lower)
Approved By:
Borough Manager
Date: Attest:
Borough Clark
Date:
Revised 09119 Page 1 of I
Date: October 2, 2019
Kodiak Island Borough
Engineering & Facilities Department
Projects Office
710 Mill Bay Road
Kodiak, Alaska 99615
Phone (907) 486-9210 Fax (907) 486-9347
To: Dave Conrad, E/F Director
From: Matt Gandel, Project Manager/Inspectort06f
RE: Contract 2020-03 Change Order #01
Attached is change order #01 to contract 2020-03 for Wolverine Supply, Inc. for the KHS/KFRC
Electric Boiler project. This change order is to modify the substantial completion date from
September 30, 2019 to January 10, 2020. Because the bids for this project came in higher than
anticipated there was an extended negotiation process that delayed the anticipated contract award
date, making the completion date of September 30 unreasonable. Because the installation process
for these boilers has minimal impact to the existing building systems there is no concern among
KIB or KIBSD personnel about extending this completion date.
--
rie•unmelt9a•R
va
eere
OeenTTOMwwnBll
lee,
100%
TIUY13N9
T19 etl3
2
sBe.nlpl..na
lery
10054
Ta s2vla
ra ursmueavl9 lut rum
-
l
CmndEseMlaenerd
tory
100%
Tp Y3Y1B
Tpe2v19 612
a
NcaeTO Repee
Id.,
10014
Tue9Y19
Tue7,11119
To T9
'Submittals
53d
9--�
NYnmIMna Gorwaals
Seam
50%
Wee7110,19
Fn920119
1110
IYm
_ 9
MBelledal Briberies
5]tlays
25%
Wee7n0,19
Fe 9211'19
7110
I9I20
T
EktlrcelsWmnm
16 Ears
100%
WaE7/101I9
weE7mna
m9
7131 -
^SubmlttalRe9kw
55d
- B
Ele..MSlAmeak
teeam
IBB%
Mon71151111
TIm 0,151111
YIS
9
Ftlnvne4enre BWmillels
in ears
5016
M IrMll9
FH921119
- to
MecM1anolSWnalYf
snw,
75%
M..72919
Fri 9127119
- -
Metedal Prgcuremmt
91d
11
".
Ralvb Selklre MSWRC 9oia 0e heels)
116 ears
50%
Fel/19119
Fit 11115119
7
13
Bdbn n Freels
B9eam
45%
We,17124119
Fe 11=19
7
Flsherles ResearTh Center llcti9iaes
Sed
- 13
Mdeka To Pmpe Ste
teem
0%
MonaGW119
T. 101tn9
IYt
-1<
EapraumtflorkJ
Beam
0%
Mon920119
nu 10,]119
M 102
15
uNcgoval CmlBub
•tlM
9%
T. 11111,19
Fe 10,0,19
YOf
111
Edna Q,ametl PW
2dam
0%
Mon 102119
Ta 10,0,19
IM +0,e
11-
Form a Ppr Bdkrds
2dM
0%
Wee 10,0,19
Tb110,10,19
101
1E
EISINwl Pa9B In a FeWeNMrm
10eam
0%
LBW tmiwis
T.11/12119
i1beY
N-
ImW Perm 0Ywnwd
]ears
0%
Will II11Yl9
WW 1120119
1111e
- 19
Eledeal Bsmo® Emtera Bdkrs
2dM
0%
Mon lis l9
T. 11261iB
limp a
31
ColorEa Bdp76 Pump
2dM
0%
Mon 112Y1a
I.1120119
H2 1 B
R
Flinn a Pwr Balla, Heuakasdnp Rd
Sears
0%
Tp t1MMI
I9W 1127119
lineal
23
Bdbr Bremen
Idry
0%
Mon 19219
Mm 13219
-
193 I=
-24
Oelas New El. MM,
Seam
0%
Mon 42119
Fn 19Yt9
1L3 1 us
25
CPBBeie Ppng"C"Terw
6dM
0%
We 132119
Fn 1711Y19
'+ 1]
M
Bbn
Bdlnpuep Ebdmsl com,dbm n N
]esm
0%
WW 1911119
Fn I91Y19
1 Tt l0
37
OOC Penal Is CmnlCmleclka
]dam
0%
Mm 1916na
WW 13n 11,19
tate; tate'
]H
Sesrvwr p
Ie,
0%
leu 1919'19
Thu 191928
1311 1910
Tank
RWW110CdeplTwk
® Prel aurleee,
pw�
Medd Tmk
® Fekelton2Y
]
Cereal Teak
®
Rorer lb Meesbm O
BrouO BY Sremnn
m.n.—Il -
- - - Peelers,
Pp1kk HS n Fiederes R C. Or Rep
Mkdmr •
ResW up Pm9nn
IIMdNr Tnk
- Mamal Summary Rdbp enel
Dina
v
Oate'Trrad7119
Bpi
....................,....
leldm Miwbn
Maori 6ummey
6nnrrery
Rdbd Up Trek 9—
EMmd Task,
� - IrwAve SunarleY
- -_ -_
--• 9terluyy C
Pon. I
BYenm9P T.'ina
tam
o%
ma un9•i9
Fn 12126119 i
----'Ivk1,IHIgh
SCtM1 Ad1Wtlo
59d
( pBy SMFmery Pm®
ROPeee
1(Wilk HS 6 FIY%Ne R C. 6oler Rep
Wbalvle ♦
ROW UP Pnamse
InsdYe Tank_
MMMY Summary RdWp
Oladlm +l
_30_
ExOvOloMa[Mll
sem
0%
Man108n9
Fn Wln9
41
upper dCOMub
4 d
a%
T. 101N19
Fd 1O'nn9
--32
.l Pad
2dW'
0%
Mm 10,1429
T. 1N1N19
]l
Ektl l RWO In 6 FeetlmyDmn
'a.,
0%
Mm 1W14119
T. 10,1999
m
Fonn B Pour BalbNa
2dM
0%
Wed I0,1N19
Th110,1Tn9
0.5
O E. Bois6Punm
3 d
0%
W 101IN19
Fd loltel19
T
EYGUI Dama®EYWIq BPYn
]dM
0%
Vhd ldlNl9
Fn101I8/19
m
Fame d Pour Bwbr If..Mpprg Ped
2dm
0%
M. 1=1110
T. 10,22/19 �
39
Imta/9irO..d
]dM
0%
Wed iNM19
Fn 12/0,19
e9
Instal New El. Stlbr
5 d
0%
Man 12110n9
FX 1280119
--A0
CPB WIV P',n9
5dM
0%
Fn 12 19
Fn 10,10
<t
BnbrFuerye EletlRel fnmetlme 65bder
]dm
0%
Tue IMI r19
Fn IMO
1
Q
- Btlbr51anL0
t d,
0%
Mm IMOD
Mon two
40
BYnm96 TeYe9
2dM
0%
Mon IMMO
1. tfla0
-----;aPa♦Mt
7d
14
sWYYnY Comdmm inpdbn
Idey
0%
VAP 1280
Wed 1220
–45
SubnI OMn1Rn 6 M..*.. Manuel'
tday
0%
10u IN=
T0u 1/0'20 _
ae
sub m -BUN'
Iday
0%
TtM I2a0
TIM Imat,
–.)
PmdLLIY
5dM
0%
Fn InOM
TIw 111980
-al
FlnY Colryle6on
1 dry
0%
Tim 111980
Thu 1116211 _
TeA ®
ROIn!lp Cn"I Ten L
Pt*d 6unanary Co
^ MemYTnk ®
RnNwYy O
Cnial TaskGau+:br�
RoledW 1,11.0- O
( pBy SMFmery Pm®
ROPeee
1(Wilk HS 6 FIY%Ne R C. 6oler Rep
Wbalvle ♦
ROW UP Pnamse
InsdYe Tank_
MMMY Summary RdWp
Oladlm +l
2Ye: TMOI17119MamYSum
SPM .........................
Ind. MMabrc
�1
S.,���
ftdbtl UP Tna 1®
_.
Enemy Taab
...
-- Inacera 5u^a^vY -
----'
_ 6laduay C
Proe2
Contract No. FY2020-03
KODIAK ISLAND BOROUGH, ALASKA
CONSTRUCTION CONTRACT
KODIAK HIGH SCHOOL AND FISHERIES RESEARCH CENTER BOILER REPLACEMENT
#19001 & 919002
PROJECT NAME AND NUMBER
This CONTRACT ("Contract"), between the Kodiak Island Borough, Alaska, herein called the Borough,
acting by and through its Borough Manager, and
Wolverine Supply, Inc.
Company Name
5099 E. Blue Lupine Drive. Wasilla. AK 99654
Company Address (Street or PO Box, City, State, Zip)
a/an ❑ Individual ❑Partnership ❑Limited Liability Company ❑Sole Proprietorship ❑X Corporation
incorporated under the laws of the State of Alaska its successors and assigns, herein called the Contractor, is
effective the date of the signature of the Borough Manager on this document.
The Contractor, for and in consideration of the payment or payments herein specified and agreed to by the
Borough, hereby covenants and agrees to furnish and deliver all the materials and to do and perform all the
work and labor required in the construction of the above -referenced project as bid by the Contractor, which
bid and prices named, together with the Contract Documents (as hereinafter defined) are made a part of this
Contract and accepted as such. It is distinctly understood and agreed that no claim for additional work or
materials, done or furnished by the Contractor and not specifically herein provided for, will be allowed by
the Borough, nor shall the Contractor do any work or furnish any material not covered by this Contract,
unless such work or materials is ordered in writing by the Borough. In no event shall the Borough be liable
for any materials furnished or used, or for any work or labor done, unless the materials, work, or labor are
required by the Contract or on written order furnished by the Borough. Any such work or materials which
may be done or furnished by the Contractor without written order first being given shall be at the
Contractor's own risk, cost, and expense and the Contractor hereby covenants and agrees to make no claim
for compensation for work or materials done or furnished without such written order.
Payment under this Contract shall not exceed Six Hundred Forty Two Thousand Seven Hundred Eighty
Dollars and Zero Cents ($642.780.00) for the Base Bid.
The Contractor further covenants and agrees that all materials shall be furnished and delivered and all work
and labor shall be done and performed, in every respect, to the satisfaction of the Borough, on or before:
Member 30. 2019. It is expressly understood and agreed that in case of the failure on the part of the
Contractor, for any reason, except with the written consent of the Borough, to complete the furnishing and
delivery of materials and the doing and performance of the work before the aforesaid date, the Borough shall
have the right to deduct from any money due or which may become due the Contractor, or if no money shall
be due, the Borough shall have the right to recover liquidated Damages as described in the General
Kodiak Island Borough Construction Contract
Page 1 of 3
-0
AUG - 8 2019
Contract No. FY2020-03
Conditions for each calendar day elapsing between the time stipulated for achieving completion of an
individual phase and the actual date of completion of that phase in accordance with the terms hereof, such
deduction to be made, or sum to be recovered, not as a penalty but as liquidated damages. Provided,
however, that upon receipt of written notice from the Contractor of the existence of causes over which the
Contractor has no control and which must delay furnishing of materials or the completion of the work, the
Contracting Officer may, at his or her discretion, extend the period specified for the furnishing of materials
or the completion of the work, and in such case the Contractor shall become liable for liquidated damages for
delays commencing from the date on which the extended period expires.
The bonds given by the Contractor in the sum of $321.390.00 Payment Bond, and $321.390.00 Performance
Bond (50% of Contract Amount), to secure the proper compliance with the terms and provisions of this
Contract, are submitted herewith and made a part hereof.
The Contractor further covenants and agrees that the entire construction will be done under the
administration of and to the complete satisfaction of the Borough subject to the inspection at all times and
approval by any regulatory agency, and in accordance with the laws of the State of Alaska and the Borough.
For purposes of this Contract, Contracting Officer means Michael Powers or any other person designated by
the Borough Manager.
The Contractor is an independent contractor and not an employee or agent of the Borough.
Contract Documents shall have the meaning ascribed by the General Conditions of the Construction
Contract, and include but are not limited to this Contract, the General Conditions of the Construction
Contract, the Supplementary Conditions. and the following listed documents:
1) Drawings dated February 27, 2019
2) Project Manual dated March 26, 2019
3) Addendum #1 dated April 4, 2019
4) Addendum 42 dated April 11, 2019
5) Addendum 43 dated April 12. 2019
6) RFP -001 Response dated June J. 2019
Kodiak Island Borough Construction Contract
Page 2 of 3
Contract No. FY2020-03
IN WITNESS WI IEREOF the parties hereto have executed this Contract and agree to its terns and
conditions.
CONTRACTOR
Wolverine Supply. Inc.
Comnanv Name
Representative
Middle O.Cp, Vioe R sii�
Name and Title
Jung 24, 2D19
Date
KODIAK ISLAND
Signature of Borough
Michael Powers
Typed Nagle
Date
TAM Welinsky
Borough Clerk
(ATTEST)
Kodiak Island Borough Construction Contract
Page 3 of 3