Loading...
2016-03-15 Regular Meeting ARCH ITECTURAVENGIN EERING REVIEW BOARD REGULAR MEETING March 15, 2016, 5:30 p.m. Projects Office Conference Room CALL TO ORDER CHAIR ARNDT called the meeting to order at 5:30 p.m. ROLL CALL Board Members present were Chair Scott Arndt, Bill Barton, Cliff Ford, and Colin Young. Kelsea Kearns, Steven Neff, and Rick Ryser were absent. Also present were Dave Conrad, KIB Construction Inspector/Engineer, Kathie Peters, KIB Projects Assistant, and Tony Yorba from Jensen Yorba Lott. Brian Pekar and Zach Cawvey from RSA were present telephonically. A QUORUM WAS ESTABLISHED. APPROVAL OF AGENDA YOUNG moved to approve the agenda. VOICE VOTE ON MOTION CARRIED UNANIMOUSLY. APPROVAL OF MINUTES FORD moved to approve the minutes from March 8, 2016. VOICE VOTE ON MOTION CARRIED UNANIMOUSLY. REVIEW OF 95% DRAWINGS FOR PETERSON BOILERS AND CONTROLS Tony Yorba discussed changes from the 65% drawings. Brian Pekar walked through the mechanical/electrical specifications; he indicated very few changes from 65%. YOUNG moved to approve the 95% documents for the Peterson Boilers and Controls ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY, REVIEW OF 95% DRAWINGS FOR PETERSON/MAIN GYM FLOORING Tony Yorba discussed changes from the 65% drawings; he also went over new contractor access plan. YOUNG moved to approve the 95% documents for the Peterson/Main . w....s �El VE ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY. Architectural/Engineering Review Board Regular Meeting Page 1 of 2 ARC HITECTURAVENGINEERING REVIEW BOARD REGULAR MEETING March 15, 2016, 5:30 p.m. Projects Office Conference Room REVIEW OF 95% DRAWINGS FOR EAST ELEMENTARY ROOF Tony Yorba discussed changes from the 65% drawings. Scott Arndt noted that the Middle School metal roof has been removed and will now be a separate project. YOUNG moved to approve the 95% documents for the East Elementary Roof ROLL CALL VOTE ON MOTION CARRIED UNANIMOUSLY. PUBLIC COMMENTS None STAFF COMMENTS Tony Yorba indicated that it is most cost effective to replace the structural steel with galvanized steel on the KMS canopy, provided that no foundation work is required. BOARD COMMENTS Bill Barton pointed out on the East Roof drawings sheet A201 references A301, which was not included, Tony Yorba will add to package. He also pointed out on page A101 the word "distrub" should be"disturb". ADJOURNMENT YOUNG moved to adjourn the meeting VOICE VOTE ON MOTION CARRIED UNANIMOUSLY. MEETING ADJOURNED AT 6:19 P.M. Respect! mitte , ZIKathie Oeters, Projects Assistant Date Scott Arndt, Chair Date rch itectural/Engi neering Review Board Architectural/Engineering Review Board March 1 ,2016 Regular Meeting Page 2 of 2