ALEUTIAN BK 13 LT 3 - Property CardOwner
Mailing
Permits
s� / ,Yr
Address
.
Rsb't
rev - :384.6
4-K 9516,T
Property Address
� n r
Liar LO keY Mita 130,t
c (do
Date Built
Observed Physical Condition
Exterior
Interior
Foundation
BUILDING TYPE AND USE
4. EXTERIOR
S- ingle
- Double
—Other
_- # Stories
Attic Finish
Basement
- Frame.
_Concrete Block
_Log
1. FOUNDATION
Concrete Thick
—Conc. Block
Wood Posts
- Skids
Wood Sills
Concrete Block
Sheathing Kind
Building Paper
Insulation Kind
Stucco
- Siding Kind
Shakes
Bricktex
Log Slab
Log Siding
_Metal
Plywood
6. INTERIOR (Continued)
7. Floors (Continued)
—Trim Kind
Grade A G
Floor
Number
Rooms
Number
Baths
Basement
1st Floor
FINISH
Wood
Concrete
Bath
Living Room
Bed Room
2nd Floor
3rd Floor
Attic
B. HEAT
Total #
5. ROOF
2. BASEMENT
__
Partial x S.F.
.Full
Cribbed
,Concrete
_.Outside Entrance
— Rec. Room Size
_Living Area Size
— Fin Walls Kind
— Fin Floor Kind
Fin Ceiling Kind
Flat _Goble Hip
Other •Kind
Shingle
_Shakes
Composition if
Insulation
Tar Paper
Metal
Built -up
—Other
Shingle
Kind
Kind
6. INTERIOR
3. FRAME
J
Walls _ - o.c.
Bracing
Roof a c
Floor o c
Ceiling o c
Other
Other Buildings
Area
Insulation Board
Plasterboard
Plaster
Masonry
W- ood Paneling
Plywood
- Finished
Unfinished
Open Stud
Floor Roof Interior
Grade of
Floor Plan _P _A ___G
Ceiling Height
Basement
1st Floor
2nd Floor
_Attic
Grade of
Kitchen —, P _A _G
Oven Built -in
—Range Built -in
Bath Room Finish
Attic Stairway .,
iJ
.Attic Unfinished
Attic Useful %
Number Dormers
Shed Type Size
Gable Size
_Stove
_Oil Furnace
Coal Stoker
_Hot Water
_Hot air Forced
Radiant
Space Heater Kind
—711/4— Floor Furnace
.._Number of Chimneys
_Kind
NUMBER OF FIREPLACES
Basement
_1st Floor Type
9. PLUMBII4.
—Water Source
Sewer Source
10. ELECTRICAL
Wired Grad
'220 Service .
TOTAL GRADE
11. GARAGE
9. PLUMBING
7. FLOORS
1st Floor o c
Bridged
Post Size . o c
Beam Size o c.
2nd Floor o c
Heat
Plumb
Unit Cost
# Tubsw /shower
# Toilets
# Basins
_# Kitchen Sinks
—# Shower Stalls_
_# Hot Water Tanks
# Gollons Kind
Grade
12 PORCHES
13. YARD IMPROVEMENTS
_# Laundry Trays
_Total Number Fixtures
Adds & Deducts Rep1. Cost
Age
Condition Building Cost
BUILDING VALUE CALCULATION
OPERATIONS AND PROCEDURES
BUILDING AREA CALCULATION
item
No.
Area or Quantity
Unit
Cost
Total
Performed By
Date
Square Feet — Ground Area
Inspection
Floor or Part
Width
Length.
Area
Classification
Calculation
Review
DEPRECIATION AND OBSOLESCENCE
DEPRECIATION
ADDITIONS AND DEDUCTIONS
a. Effective Age
Depreciation
Notes:
b. Observed Physical
Condition
c. Total Depreciation
(a -4 b) %
Perimeter
Scaje1"
d. Net Condition
(10 0 - c)
OBSOLESCENCE
e. Overimprovement
f. Underimprovement
g. Other
h. Net Condition
(100 - (e+ f +g)
i. FINAL NET CONDITION
(d x h) %
SUMMARY OF APPRAISED VALUE
Principal Building
Appraisal
Other Principal
Buildings Appraisal
Accessory Buildings
Appraisal
Total Replacement Cost
Cost Conversion Factor
Adjusted Replacement Cost
Total Building
Appraisal
Total Lond
Apraisol
TOTAL APPRAISED
VALUE $
• (7--
KIBS271064
Other Description:
1,, 3 t3J/3 433-t'
/DzA 14 237
Size: /y Az/ /. h• is 3.4 3 S fI. 3,i W x'9..54
Valuation Code: -
Area: 7'Z
Land Use: t]`, .
ia,S32 c� 1b7�ft- Use Zone: !j'' z ,
Unit Price: • ,q0-
INFLUENCES: ',
-PLUS
MINUS
Depth r •
Land
Bldgs.
Topography ,
/9 ,'i
A/ea /00 - IlitiA e A /4 e
Irregular Modification ! ..
0
c,.l
View
2194:5
I41eui-ia I ova, c ` �• —A S N. A.
Drainage
-
;i.5
Physical Barriers
Qi4.
9 �.
_5_
Access •
'5/4- 5--6
dOWQ
Corner
X9'7
,, /dor A/G to? f4 -- ,_- /.i•S —f%
Water /-
,.14
& rJ .9W6'
s3bo
Sewer `---'
sgoe
Sidewalk
Paving 1 /r
. '
Curb & Gutter 3 j 1Q—
&7 4yKz.Q Lt.._ I4sIT/9
—C'
Other C1414si,.n
.� O �O
TOTAL v
f� e: /j
Net -i- ( —)
Year of Valuation: %9,,,( _
/9, Y'(C
Basic Land Value —` - -e
Plus or (Minus) Factors —
Net Price 'of Land gQ
Remarks: '/. /WA — 'Fro /..7 -6, • ,/ -/ G - 7 ./ r,
12/40z Cb b2- w/ LT %) 1 cm" Gt.x pe-ctiOett
- LAND VALUE
YEAR
OWNER
ASSESSED VALUATION
. REASON
FOR CHANGE
Land
Bldgs.
Total
/9 ,'i
A/ea /00 - IlitiA e A /4 e
Ji
0
,a
2194:5
I41eui-ia I ova, c ` �• —A S N. A.
:23.9"g
-
;i.5
Qi4.
9 �.
_5_
—
'5/4- 5--6
dOWQ
/9/e
X9'7
,, /dor A/G to? f4 -- ,_- /.i•S —f%
' r
,.14
& rJ .9W6'
s3bo
sgoe
%z G'
&7 4yKz.Q Lt.._ I4sIT/9
J
.� O �O
ry
a- yL
197A
.l) 4 s' le4-
6o
--
SA o
(e2q' SDb
f973
OR484Ir2 9/ AkytuR AE kr.P_
s/i60
--
£g"bo
/?7Y
/44,74 4460 /1f "/X /%s /i'Al
6a )V
--
C--.2 711r
.z1 4/�GS-3f 12.D /� ,f/'
/ y2 S'
ic)_e_>.�,c «.v (X e-+ i, ° (3)1 .P1 �.6
9/96
— -
9 /Fe
1161‘7.
kiln /l,`am s, Pon4 f fl4 / /%s si ,,
g/.9
—
qiy, ,
,
l ?70.
(,,}, (Yams Pd t/d F s /1(5 An
4/90
--
97 90
.
--'
`s-
1g79c
)oaf karacLi 0P ,
/poc
_
12,20
1�i -
,
with :. 45 //1.; .4-zw
3‘e
--
Asa,
ill' S-I
,va/d¢-
f i / /a6),.,.,.,
g_36n
ile 3 bo
/Y8c
60,ti 2ci.m6 .?rr ln2o(4 }- . Ann
/35'30
-
/s51,1-0
j 3
,
\J NA, e, ms , \ ` z, `" � Zliw'
aozld}
—
R Snu
RiSA
\
�1,V\ sn57 Rth\AMA 4 W k0.v- S)6+11\
coo
—
;tee
I
(Mu -1 19)us., i& v -Pt> / J . in,
,c
/6-0
"---
30) eSeZ
REMARKS
PICTURE
/-1.12.604,4e / .4.d a
%%1�%r0.4,��
!/� // 6L 42r----
®W / /fig ^�./2)
PLACE PICTURE HERE
poa a3doaaTV (Modes- C.+ t.4.„)
92 yoozv L-n/ Y
it1UBS271063
'ijricx .-ihNtek,
1G* T nr (f M MT P PQI3 Oct-15 X5
•
WM
1 -,ft
' IV
OWNER
Land
8I00.
row
FOE Cr&ANC(
/fen.
s
.l
5'5 %d
--
a5rsooy\
i i ' +h • • ,° •
. _ ,
s 1.' I E P YU..,4 A.
_ +1
_ 5 ►v
• ' � •ta
1q`)
-' Er .l
'1
5 5o�o
5,-00
h
as,
—
?Sszz2
'1990 ,
ri
,, ie
S*61
2,S,SCil
...,„.
ZS ScO
et 6 {
di .3-
); c40.,_ ' / 6- ,L,,,i,K J/t / 11/ j
o2�U7C>
—
J�.L'>
Hi c=1 23 ,f
i /9q /
1 �i��
f9-
o //i€ 015_, ,6ina( R-/'lryll;s, (� tv/,�`r� Tru5f-
-a `�i!�! —
.iS" 0
4� 0 : ra . _,39 2 -e.3 "Q1
'-
-4't40)
-
2P40
'� LJ
Z15,9oo
.-
—
Z819ao
..
�Iciouo
1991
'' ,- 1/
' ir
Z$, 5co
_. _
2.a Ica
Y-199
„ "
21,10()
—
28.900
a.
''
; 00
38,goO
-
-
aiS
ab',Q0cD
-
jcicfct
900D
,'
'
38, q 0o -
o.,
�_Rt3btna
g,cInect
-� .2c --
`Re-) DD
3WD 2 1g 7 ?ew 61/Da
,,
„
. 8.9c9 —
...?1F-0 a9
' b.'
_
k 0`
Q3'02) —
..q-3,m9
23Lrr
, Cv
KiBS271062
_..,.■
" A
25000 r
r 747_, —
" A
.
/04-
-TN' ZASEMEN
' LOT-5 103 i-hrL4 11
. 3D.
14G. 6001< 12 ,
ON R
f O P-GET
L?SK1),!E
T
P, /0afc4L 47 o .,., /uf5
/4
RR
/02
J76.4 -A-
1rmr 1 1 arrnrimminwirarrrenimtmur
PP
L1Ti�iTY
inrrrrnrrr trD�rr *rrrrnrrrnrrrnrrrnrrrrr
'/8
U I I_ I
McHr
f35-8sf 5_3
r +
4' Cr1ArN ur+ .
4-,
• l71O s. r
tV
y
a
h 1 V \
Ave -1a
f1 /o4 f
4
r-///:5 /s Ai- cap y
a 04
vr
l7►tU -
�t. 1f-
bk
O/ P7i TrNi<s
,gu,<45.414 ti
�CGJA/4 61'047
CA- [r rs 245)
KODIAK ELECTRIC ASSOCIATION, INC.
P.D. Box 787, Kodiak, Ak . TR�GT A //
89 KV Transmission Line
Swampy Acres to Main Substation
KEA Work Order No. 3867 4‘..../1.,
Right-of-Way Parcel No.-c=i75 –it
(from Ecklund's sheets 1 thru 7 of 7)
a4.IP EAsE-in ."-7VT
Wept, it ;� pw ,
USL g$LE , BUlLDAFSL.E- PEaP � j
Kodiak Island Borough
P.O. BOX 1246
KODIAK, ALASKA 99615 -1246
PHONE (907) 486 -5736
Mrs. Phyllis A. Williams
P.O. Box 4171
Mountain View, CA 94040
Dear Mrs. Williams:
February 15, 1985
Re: Lots 1, 2, and 3, Block 13, Aleutian Homes Subdivision.
Thank you for your letter dated January 26, 1985. Since that time I have met
with Mr. Jenks and discussed development alternatives on your property given
the additional easements required by K.E.A. for the new 69 k.v. electrical
transmission lines.
It became apparent after our discussion February 13, 1985 that the maximum
development that could occur on all your lots is the construction of a duplex
structure on a combination of Lots 2 and 3. The remainder of Lots 1, 2, and 3
may be utilized for parking or other non - structural uses.
Because only a small area of building space will remain on Lot 2 after meeting
the minimum borough setback requirements as well as granting additional
easements requested by K.E.A., it may be practical to incorporate the area of
Lot 2 with the space of Lot 3. By doing this, the normal side yard setbacks
required along the common lot line between Lots 2 and 3 can be abated (see
drawing).
Replatting of Lots 2 and 3 into one lot is not required by borough code, but
construction of a duplex may then occur anywhere in the red hatched area of
the map. Mr. Jenks will be contacting you with similar information.
I have included a copy of the notes taken by Mr. Jenks during our discussion
describing your options. These may help explain your options.
Should you have additional questions, please call.
Sincerely,
pct �4 a'
Bud Cassidy
Assistant Planner /Zoning Officer
Community Development Department
pb
cc: Property File
Robert Jenks La% /c,-ncJc