Loading...
1997-12-17 Regular Meeting a ARCHITECTURAL REVIEW BOARD MINUTES December 17, 1997 1. CALL TO ORDER Gerry Cloudy, Chairman called the session to order at 6:00 p.m. The meeting was held in the Kodiak Island Borough Conference Room. I1. ROLL CALL Members Present Members Absent Staff Present Gerry Cloudy Bob Tucker Kaye McClain Greg Hacker (School Supt. Designee) Steve Hobgood-(Mayor Designee) Jay Johnston Jack McFarland-(School Board Rep.) Tom Templeton Jeff LeDoux Robin Heinrichs and Scott Arndt, Assembly Members, also attended the meeting. III. MINUTES Notes from the previous week's Work Session were approved upon a motion by Tom Templeton and a second by Greg Hacker. IV. DISCUSSION OF PETERSON SCHEMATIC DRAWINGS The assembled group recapped some of the discussion from the work session and addressed several additional concerns. Among the items discussed were: Timeline for project — Bidders should be offered the opportunity to bid on the job as a project ending in Mid-August with an alternate bid option to extend the work to end during the December break. Lighting —The use of parabolic lights in the addition to match existing was thought to be potentially costly. It was suggested an "or equal" be used in the specs. Newer diffusers are being used to simulate the properties of the parabolic units. Windows— Intention is to match the existing window style for looks, but the enclosed blind windows are offering problems for School maintenance. The existing windows are wood. For future maintenance concerns, it was suggested they also look for clad windows. Reverse slope roofing design—This item was discussed in regards to ice and water build up. It was clear that if this design is used, there should be provisions for heat taping the drains. fitTom Templeton moved the Schematic drawings for the Peterson Addition be recommended to the Assembly for approval. Seconded be Jeff LeDoux, the motion was approved unanimously. V. NEXT MEETING Next meeting will be announced. VI. ADJOURNMENT The meeting adjourned at 6:30 p.m. Approved by: Submitted By: • 'di to teL L /09/91 Gerry Cloudy, Date aye R.7 cClain. Dale- Chairperson Projects : ssistant