Loading...
1997-12-11 Work Session ARCHITECTURAL REVIEW BOARD WORK SESSION NOTES December 11, 1997 I. CALL TO ORDER Gerry Cloudy. Chairman called the session to order at 6:10 p.m. The meeting was held in the Kodiak Island Borough Conference Room. IL ROLL CALL Members Present Members Absent Staff Present Gerry Cloudy Toni Templeton Kaye McClain Greg Hacker Jeff LeDoux Steve Hobgood-(Mayor Designee) Jay Johnston Jack McFarland-(School Board Rep.) Bob Tucker-(School Supt. Designee) Terry Hyer, Architect for the Peterson Addition and Scott Amdt, Assembly Member, also attended the meeting. III. MINUTES Minutes of the previous meetings were not discussed. IV. DISCUSSION OF PETERSON SCHEMATIC DRAWINGS Comments began with drawing sheet C-I. It was questioned whether the abandoned utilidor outside the building was in fact cleaned of all materials. Mr. Johnston noted a void in the facade on detail 2/A6.1 and wondered if it might become a condensation trap. Mr. Hyer noted that some weep holes might be added to respond to that concern. Those present approved the proposed slab heat. There was discussion on whether copper or cast iron piping would be used. It was noted the roofing proposed was like the existing roof on IB/A6.1. A new roof of any type will not affect the existing roof warranty. The roofing system, shown on 2/A6.1, was discussed and the group stated they would like the roof to be exposed fully adhered PVC membrane. Eighty mill was used for North Star and was termed to be strong and not difficult to lay. Refrigerators were noted in the kindergarten rooms. They are spec'd as residential units. It was noted the penthouse appeared to be a cramped space. What are the dimensions? Will there be heat in the room to protect the coils? The use of glycol was discussed. Mr. Johnston noted the area calls for wood construction instead of steel. My Flyer said the determining factor was cost. Discussion of the length of the schedule indicated those present would be interested in moving the end of construction to a December-January, date rather than push the contractor to have the work completed by mid-August. It was felt some items in the existing building in the mechanicaUelectrical area should be addressed, so when completed, Peterson would be "finished". Cost estimates were discussed. Based on the schematic design, the current estimate is about $1,340,000. It is expected to grow by 1% by spring. V. NEXT MEETING Next meeting will be at 6:00 p.m., Wednesday, December 17, 1997 in the Borough Conference Room. VI. ADJOURNMENT The meeting adjourned at 7:15 p.m. Approved by: Submitted By: • • r: . �c? /2/477?7 -Gerry Cloudy, Date Kaye j. McClain, Date Chairperson Projects Assistant ex- •