USS 1396 TR G-4-A LARCH ST - ZCP 6/5/2013Kodiak Island Borough
Community Development Department
710 Mill Bay Rd. Rm 205
Kodiak AK 99615
Ph. (907) 486 - 9362 Fax (907) 486 - 9396
http://www.kodiakak.us
Zoning Compliance Permit
Print Form 1
1
11
1111
ISubmit by Email
23708
Permit No. CZ2013 -091
Property Owner / Applicant:
Mailing Address:
Phone Number:
Other Contact email, etc.:
Legal Description:
Street Address:
Use & Size of Existing Structures:
The following information is to be supplied by the Applicant:
Kevin Suydam
PO Box 980, Kodiak, AK. 99615
907.486.5396
suydamka @comcast.net
Subdv: USS 1396
1416 Larch St.
Block: Lot: G4A
SFR over garage
Description of Proposed Action: Expand second floor area by (20' x 22' = 440sgft) & (12' x 24' = 288sqft) all within existing footprint
Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points,
and vehicular parking areas.
Staff Compliance Review:
Current Zoning: R2
KIBC 17.80 PROP_ID 23708
Lot Area: 23,720 Lot Width: 60' Bldg Height: 35'
Front Yard: 25 ' Rear Yard: 10' Side Yard: 5 '
Prk'g Plan Rvw? No # of Req'd Spaces: 3
Staff Compliance Review Notes:
Plat / Subdivision Requirements?
Subd Case No.
Plat No. Bldg Permit No.
Does the project involve
an EPA defined facility?
Driveway
Permit?
Septic Plan
Approval:
Fire
Marshall:
If YES, do you have an EPA Return Receipt of
Notification?
"Permit will not be issued until receipt is submitted to
KIB"
Applicant Certification: 1 hereby certify that 1 will comply with the provisions of the Kodiak Island Borough Code and that 1
have the authority to certify this as the property owner, or as a representative of the property owner. 1 agree to have identifiable
corner markers in place for verification of building setback (yard) requirements.
Attachments? Site Plan
Date: Jun 5, 2013
List Other:
Signature: Kevin Suydam
This permit is only for the proposed project as described by the applicant. If there are any changes to the
proposed project, including its intended use, prior to or during its siting, construction, or operation, contact
this office immediately to determine if further review and approval of the revised project is necessary.
"EXPIRATION: Azoning compliance permit will become null and void if the building or use authorized by such permit is not
commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the
work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec.
106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. **
CDD Staff Certification
Date: Jun 5, 2013 CDD Staff: Martin LydiM ,/ - ]'Z //e
Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Of ice Room # 104 - Main floor of Borough Building
After - the -Fact 2X the published amount
Not Applicable
Less than 1.75 acres:
r
IX
$0.00 ak // F
$30.00 F-
$0.00
$60.00
1.76 to 5.00 acres:
r
$60.00 P'R j—
$120.00
5.01 to 40.00 acres:
j—
$90.00 - F
$180.00
40.01 acres or more:
j—
$120.00 ry 240.00
E'f,si 1`1 3
KU,.U- , :, � . ;; I) 0 H
FINANU w PARTMENT
,
M1
I���E�iiix'zyd9
RAR 3 •i�3Ra ��9q��F�g� AF
f A eg
Qr —_-
<
y
Z
I
0
wD my r
p~ Z D iNFIfRINCOMMMY IHC.
$ rz 3
m
II
i
�
I
II
II
II.
III
4
II
II
II
II
II
(
dm lil
I1
1 II
III
I
II
3 II
8`
I���E�iiix'zyd9
RAR 3 •i�3Ra ��9q��F�g� AF
f A eg
Qr —_-
<
y
Z
I
0
wD my r
p~ Z D iNFIfRINCOMMMY IHC.
$ rz 3
m