Loading...
EAST ADD BK 52 LT 3 - ZCP 5/14/2013Kodiak Island Borough Community Development Department 710 Mill Bay Rd. Rm 205 Kodiak AK 99615 Ph. (907) 486 - 9362 Fax (907) 486 - 9396 http://www.kodiakak.us Zoning Compliance Permit Print Form 1111 1111 11 15128 Submit by Email Permit No. CZ2013 -083 Property Owner / Applicant: Mailing Address: Phone Number: Other Contact email, etc.: Legal Description: Street Address: Use & Size of Existing Structures: The following information is to be supplied by the Applicant: Cross, Kent & Dora PO Box 3164, Kodiak, AK. 99615 360.880.4407 360.827.5877 Subdv: East Addition 1618 17th Ave. Block: 52 Lot: 3 2 storey SFR Description of Proposed Action: Demolish existing 8' x 10' acc strg shed & replace w/ 8' x 24' strg shed Site Plan to include: Lot boundaries and existing easements, existing buildings, proposed location of new construction, access points, and vehicular parking areas. Staff Compliance Review: Current Zoning: R1 KIBC 17.75 PROP_ID 15128 Lot Area: 8,000 Lot Width: 60' Bldg Height: 35 ' Front Yard: 25 ' Rear Yard: 10 ' Side Yard: 5 ' Prk'g Plan Rvw? No # of Req'd Spaces: 3 Staff Compliance Review Notes: Plat / Subdivision Requirements? \�C)Submitted site plan shows encroachment into required 5' side yard * *Not Allowed ** Subd Case No. Plat No. Bldg Permit No. Does the project involve If YES, do you have an EPA Return Receipt of an EPA defined facility? Notification? "Permit will not be issued until receipt is submitted to KIB" Driveway Permit? Septic Plan Approval: Fire Marshall: Applicant Certification: I hereby certify that I will comply with the provisions of the Kodiak Island Borough Code and that 1 have the authority to certify this as the property owner, or as a representative of the property owner. I agree to have identifiable corner markers in place for verification of building setback (yard) requirements. Attachments? Site Plan Date: May 14, 2013 List Other: Signature: Dora Cross This permit is only for the proposed project as described by the applicant. If there are any changes to the proposed project, including its intended use, prior to or during its siting, construction, or operation, contact this office immediately to determine if further review and approval of the revised project is necessary. ** EXPIRATION: A zoning compliance permit will become null and void if the building or use authorized by such permit is not commenced within 180 days from the date of issuance, or if the building construction or use is abandoned at any time, after the work is commenced, for a period of 180 days. Before such work can be recommenced, a new permit must first be obtained. (Sec. 106.4.4 Expiration. 1997 UBC) per KIBC 17.15.060 A. ** CDD Staff Certification Date: May 14, 2013 CDD Staff: Martin Lyp(iEI� /�( //Q Payment Verification Zoning Compliance Permit Fee Payable in Cashier's Office Room(# 104 - Main floor of Borough Building After - the -Fact 2X the published amount Not Applicable r $0.00 (— $0.00 Less than 1.75 acres: r { $30.00 ) /�� r $60.00 1.76 to PAID 40.0 00 acre: 5.01 to 40. s: F $90.00 F $180.00 40.01 acres or more: F_ $120.00 MAY 14 P013 F_ $240.00 KODIAK ISLAND BOROUGF1 FINANCE DEPARTMENT J c. OC �O A6154 W I x$4000 5.f. N > I 3C O6 QO / Ck . titi NN , 7 �pRy� M yoG AS - BUILT SURVEY �3r ooh k